1 May 5, 1986-Docket Nos.: 50-321/366 DISTRIBUTION Docket
- File ** ACRS(10)
PDR/LPDR OELD Mr. J. T. Beckham, Jr.
SNorris AGibson,-RII Vice President - Nuclear Generation RBernero VBrownlee, RII Georgia Power Company EJordan P. O. Box 4545 BGrimes Atlanta, Georgia 30302 JPartlow Gray File
Dear Mr. Beckham:
By "05000321/LER-1986-015, :on 860331,isolation of RHR Reactor Shutdown Cooling Suction Inboard Primary Containment Isolation Valve [[SSC" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Occurred.Caused by Inadequate Procedure.Procedure 57SV-SUV-007-1S Will Be Revised|letter dated April 30, 1986]], Georgia Power Company (GPC) requested temporary relief from an NRC position that Note 5 of ASME Code Section XI, Table IWB-2500-1 prohibits the withdrawal of control rods prior to performing the required pressure tests on the primary reactor coolant system.
It is our understanding that GPC's request followed discussion.between GPC and Region II
~
on April 29 and 30, 1986 concerning an NRC position regarding Code pressure test requirements. The position is described in an internal NRC memorandum from R. Bernero to A. Gibson, dated April 29, 1980 (copy enclosed) which stated, in summary, that in addition to requiring that pressure tests be performed prior
.to pulling control rods also required that the tests be performed with the system completely filled with water (water solid).
From your letter and discussion with your staff we understand that GPC has no procedures for performing tests in this manner and it would take GPC at least 4 days to prepare and adequately review procedures to perform the tests without nuclear heating.
In view of 1) the past history of this activity where the staff has permitted GPC to perform these tests using nuclear heat, 2) the late arrival of the staff position, 3) the importance of assuring that adequate procedures are prepared and carefully reviewed prior to implementing-them, 4) the delay this f
procedure preparation would cause in restarting Hatch Unit I which had been i
scheduled to pull. rods during the night of May 1, 5) our conclusion that there is minimal difference in the safety afforded by the testing as performed by GPC using nuclear heat versus testing in accordance with the staff position on the code requirements, 6) our desire to consider new information that may have a bearing on this recent staff position and GPC's promise to seek a ASME Code interpretation of these testing requirements within 2 or 3 months, and i
- 7) GPC's commitment that if it is unable to get a code interpretation in time for Hatch Unit 2 restart, it will prepare procedures for and use pump heat for the required Hatch Unit 2 pressure tests, we concluded that it is acceptable f
I 8605090547 860505 PDR ADOCK 05000321 P
pog --
--,w..
<v
<-,--w.-g
,y
.--en, nr,-, - - +, -
7.,
4, r. - e,9
-.-,.,a
-p m.-..
~
~
-i Mr. J. T. Beckham, Jr. :
1 for' Hatch Unit I on a one time basis-to perform the required pressure _ test.
using nuclear heat as it has been doing for a number of years. This was implemented by Region II's exercising enforcement discretion as discussed in 4
a conference call with Region II, NRR and GPC personnel on MayL1, 1986.
Sincerely, Daniel R. Muller, Director i
BWR Project Directorate #2 Divison of BWR Licensing
Enclosure:
As Stated cc: See next page 3
l l
.i d
^I
^
l
~
J 4
1
,j DBL:PD#2 DBL
)#2 DB :P SNp>h&e' GRig nbark: csp e
]
5/4 /86 5/$/86 5/6/86 j
i l
.l l
i
-.w..
-, -. - -,. ~, -, ~, +, -.
, - -.,, - ~ -
1 Mr. J. T. Beckham, Jr.
Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 t
I cc:
Bruce W. Churchill Esquire Shaw,Pittman,Potts&Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 i
Mr. L. T. Gucwa Engineering Department Georgia Power Company j
P. O. Box 4545 Atlanta, Georgia 30302 Mr. 4. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long i
Southern Company Services, Inc.
i P. O. Box 2625 Birmingham, Alabar.m 35202 Resident inspector I
l U.S. Nuclear Regulatory Commission j
Route 1, P. O. Box 279 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, Suite 3100 Atlanta, Georiga 30303 g
Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.
I Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 e