ML20203P293

From kanterella
Jump to navigation Jump to search
Forwards Breakdown of Review Costs by Program Ofc for OL Applications for 840624-850117.W/o Encl
ML20203P293
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/02/1986
From: Holloway C
NRC OFFICE OF ADMINISTRATION (ADM)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8605060524
Download: ML20203P293 (1)


Text

DISTRIBUTION:

PDR MAY 0 21986 '

tpon LFMS Actual Manpower File RMDiggs CJHolloway Docket No. 50-413 Reg Docket File DWeiss LFMS Reactor File Duke Power Company LSolander, PRAB ATTN: Mr. H. B. Tucker, Vice President MKaltman, PRAB Nuclear Production Department CHarwood, NRR P.O. Box 33189 MDuncan, NRR 422 South Church Street KJabbour, NRR Charlotte, NC 28242 GJohnson, RM Gentlemen:

As you are aware,10 CFR 170 of the Commission's regulations for license and inspection fees was revised effective June 20, 1984. Section 170.12(b) of the revised rule provides that for applications for pemits, licenses, facility reference design approvals, and special projects which have been on file with the Commission for review for six months or longer, billings would be made at six.mor.th intervals or when the review is completed, whichever is earlier.

Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analysis for the Catawba 1 OL application review for the period June 24, 1984 through January 17, 1985, the date the full (100%) power license was issued. The cost through that period is $456,993. The enclosure is a breakdown of the review costs by program office. The Office of Nuclear Reactor Regulation has made cost adjustments of $3,100 from the previous reporting period, leaving a revised cost total for the period of $453,873. When the costs of $453,873 are added to the costs of $2,750,467 from the previous billing report, the cumulative costs of

$3,204,340 exceed by $126,940 the maximum fee of $3,077,400 as stated in 10 CFR 170.21. Accordingly,$126,940 has been subtracted from the costs of $453,873 leaving a balance due of $326,933 for the issuance of the operating license. The Office of Resource Management has been notified to bill your company for this amount. When making payment, please make reference to the invoice number.

Sincerely, D"?4 c. Mn n,u..,9.g C. James Holloway, Jr.

Acting Director License Fee Management Staff Office of Administration

Enclosure:

As stated 0FFICE :LFMS:ADM SURNAME :CJHolloway:jp DATE :5/

/86 8605060524 e60502 PDR ADoCK 05000413 P

PDR