ML20203N423

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/86-21 & 50-425/86-12 on 860318- 21.No Violation or Deviation Noted
ML20203N423
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/21/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20203N426 List:
References
NUDOCS 8605050404
Download: ML20203N423 (3)


See also: IR 05000424/1986021

Text

r-

b tk . s

o

N

-

s

Apg 211986

.-

s

)

Georgia Power Ccmpany

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

REPORT NOS. 50-424/86-21 AND 50-425/86-12

On March 18-21, 1986, NRC inspected activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

1

51)

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-424/86-21

and 50-425/86-12

cc w/ encl:

R. E. Conway, Senior Vice President &

Project Director

~ D. O. Foster, Vice President, Project

Support

P. D. Rice, Vice President, Project

\\

Engineering

4 R. H. Pinson, Vice President, Project

Construction

kJ.T.Beckham,VicePresident&

General Manager - Operations

(cc w/ encl cont'd - see page 2)

8605050404 860421

I

PDR

ADOCK 05000424

G

PDR

(

l

xEoI

APR 211996

D

-

GgbrgiaPowerCompany

2

(cc w/ encl cont'd)

]R.A. Thomas,VicePresident,

Licensing

'C. W. Hayes, Vogtle Quality

{W.C.Ramsey, Manager-

Assurance Manager

Readiness Review

d G. B. Bockhold, General Manager,

Nuclear Operations

'L. Gucwa, Manager, Nuclear Safety

1 and Licensing

4M. H. Googe, Project

Construction Manager

JE. D. Groover, Quality

Assurance Site Manager -

]J.A. Bailey,ProjectLicensing

Construction

Manager

sG. F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

\\ B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

t

4. L. Blake, Jr.

Esq., Shaw,

Y.Pittman,PottsandTrowbridge

E. Joiner, Troutman, Sanders,

}J.G.Ledbetter, Commissioner,

Lockerman and Ashmore

Department of Human Resources

N C. H. Badger, Office of Planning

and Budget

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

}D.C.Teper,GeorgiansAgainst

Council

i

Nuclear Energy

4M. B. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

\\

Panel

  • Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

{G. A. Linenberger, Jr. , Administrative Judge

Panel

Atomic Safety and Licensing Board

Panel

dB.P. Garde,CitizensClinic,Directnr

Government Accountability Project

(bcc w/enci - see page 3)

-

-

- - -

!

-

APR 911986

n

Ge'orgia Power Company

3

'

bec w/ encl:

E. Reis, ELD

W. M. Hill, IE

. Miller, NRR

s

. Brach, EDO

. Sinkule, RII

. Rankin, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

pRIIffl

RII

i

,

-

.

Conlon

6R erdt

h

M unt:Jw

4/gj/86

4/g/86

9J/86

i