| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 09/16/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20203N234 | List: |
| References | |
| NUDOCS 8609230227 | |
| Download: ML20203N232 (2) | |
See also: IR 05000271/1986015
Text
,,
-.7
ks
.
O
.a
SEP 161986
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN:
Mr. Warren P. Murphy
Vice President and Manager of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection Report No. 50-271/86-15
This refers to the routine resident safety inspection conducted by Mr. W. J. Raymond
of this office on July 1 - August 4, 1986, at the Vermont Yankee Nuclear Power
Station, Vernon, Vermont.
The inspection consisted of observation of activities,
interviews with personnel and document reviews.
The results of the inspection are
described in the NRC Region I Inspection Report enclosed with this letter and were
discussed with Mr. J. P. Pelletier of your staff at the conclusion of the inspec-
tion.
The inspector also reviewed the actions taken to correct the violation brought to
your attention in our letter dated January 6,1986, concerning the failure of tech-
nicians to follow and/or change approved procedures when the calibration radiation
sources used for a safety related monitor became weak.
We have no further ques-
tions regarding your corrective actions.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
'
Notice of Violation enclosed herewith as Appendix A.
The violation concerns the
failure to determine the standby liquid control system liquid poison tank boron
concentration following water additions to the tank on two occasions. This viola-
tion has been categorized by severity level in accordance with the " General State-
ment of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix
C (Enforcement Policy 1986).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your response,
you should document the specific actions taken and any additional actions you plan
,
to prevent recurrence.
The responses directed by this letter and the enclosed Notice are not subject to
the clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this
letter and the enclosures will be placed in the NRC Public Document Room.
8609230227 860916
ADOCK 05000271
G
s
/
' I
-
..
.
SEP 161986
Vermont Yankee Nuclear Power
2
-
.
Corporation
Your cooperation with us is appreciated.
L.
Sincerely,
Original Signed Byt
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report 50-271/86-15
cc w/encls:
Mr. J. Gary Weigand, President and Chief Executive Officer
Mr. J. P. Pelletier, Plant Manager
Mr. Donald Hunter, Vice President
Mr. R. W. Capstick, Licensing Engineer
Mr. Gerald Tarrant, Department of Public Service, State of Vermont
Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of New Hampshire
State of Vermont
NRC Resident Inspector
bcc w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
DRP Branch Chief
M. McBride, SRI, Pilgrim
H. Eichenholz, SRI, Yankee
V. Rooney, LPM, NRR
Robert J. Bores, DRSS
O
R.
RI:D
R
Raym
/meo
Elses'er
Wgizin er
9/5 86
9ll5, f6
y l(,
0FFICIAL RECORD COPY