ML20203N237

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 860701-0804
ML20203N237
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/16/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20203N234 List:
References
50-271-86-15, NUDOCS 8609230229
Download: ML20203N237 (1)


Text

.

.. ., -..o APPENDIX A NOTICE OF VIOLATION Vermont Yankee Nuclear Power Corporation Docket No. 50-271 Vermont Yankee Nuclear Power Station License No. DPR-28 Vernon, Vermont During an NRC inspection conducted on July 1 - August 4,1986, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions",10 CFR Part 2, Appendix C (Enforcement Policy 1986), the violation is listed below:

Technical Specification 4.4.c requires that the boron concentration of the liquid poison tank in the Standby Liquid Control System be determined follow-ing any addition of water or boron to the tang, Contrary to the above, following the addition of water to the liquid poison tank on July 8, and on July 15, 1986, tration was performed until an NRC review of the g;tivities ino analysis of the t deficiencies.

This is a Severity Level V Violation (Supplement I.E.)

Yankee Nuclear Power Corpora-Vernon, yggpont, js hereby required to subm of'the;{dateofthelettertransmittingthisNotice,awrittenstate tiod tion in reply including: (1) the reason for the violation, if admitted; (2) the

, corrective steps which have been taken and the results achieved; (3) the corrective steps that will be taken to avoid further violations; and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extend your response time.

I G

- _ _ _ . .. _ ._