JUL 311986
Docket No. 50-456
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. T. E. Vandel
and T. E. Taylor of this office on May 19-22, 27-30, June 2-13, and July 10-11,
1986, of activities at the Braidwood Nuclear Power Station, Unit 1, authorized
by NRC Construction Permit No. CPPR-132 and to the discussion of our findings
with Mr. C. W. Schroeder and others at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
-
y 9, N 61: . '. S
J. J. Harrison, Chief
Engineering Branch
Enclosures:
1.
2.
Inspection Report
No. 50-456/86025(DRS)
See Attached Distribution
RII
RII
RII
(
.
4
.
-
an 1/kst
r
is
r
r ison
8608070122 860731
/
1M
I
- /
5"
""
" M' -
.
_ . _
_ . _ .
I co/
e-
.
.
JUL 311986
Commonwealth Edison Company
2
Distribution
cc w/ enclosures:
D.
L.- Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P.' L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
'J. Stevens, NRR
The Honorable Herbert Grossman, ASLB-
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
f
i