ML20203J071
| ML20203J071 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 07/29/1986 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil Public Service Enterprise Group |
| Shared Package | |
| ML20203J074 | List: |
| References | |
| NUDOCS 8608050174 | |
| Download: ML20203J071 (2) | |
See also: IR 05000354/1986028
Text
r
e
'
JUL 2 91986
Docket No. 50-354
License No. NPF-50
Public Service Electric & Gas Company
ATTN: Mr. C. A. McNeill, Jr.
Vice President - Nuclear
-
Post Office Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Inspection No. 50-354/86-28
This refers to the routine physical security inspection conducted by Mr. R. J.
Bailey of this office on May 27-30, 1986 at the Hope Creek Nuclear Generating
Station, Hancocks Bridge, New Jersey of activities authorized by NRC License
No. NPF-50 and to the discussions of our findings held by Mr. Bailey with
Mr. Moeller and other members of Public Service Electric & Gas Company's staff
at the conclusion of the inspection.
The purpose of this inspection was to determine the quality of the training
program for security personnel at the Hope Creek / Salem Nuclear Generating
Stations and their ability to carry out their assigned duties.
The findings
of the inspection are described in the NRC Region I Inspection Report which is
enclosed with this letter.
The inspection consisted of monitoring
reexaminations administered to a statistically selected sample of security
personnel in qualification and requalification tasks; interviews of security
personnel; and review and evaluation of examination results.
Within the scope of this inspection, no violations were observed. The
inspectors determined that, with a 95% confidence level, security personnel
are sufficiently knowledgeable to carry out their assigned duties. While
there were failures on certain examinations, the inspectors determined that
these failures did not constitute a significant weakness in your training or
security programs. Remedial training was promptly initiated by your staff
for those personnel who failed any test and each such indivi. dual was subse-
quently requalified.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
OFFICIAL RECORD COPY
8608050174 860729
DR
ADOCK 0500
4
s
.
r
-
- - -
r
Public Service Electric & Gas Co.
2
JUL 2 01986
.
No reply to this letter is required. .Your cooperation is appreciated.
Sincerely,
'
Thomas T. Martin, Director
u
{
Oivision of Radiation Safety
and Safeguards
t
Enclosure: NRC Region 1 Inspection Report Number 50-354/86-28
cc w/ encl:
A. E. Giardino, Manager, Station Quality Assurance
R. L. Mitti, General Manager, Nuclear Assurance and Regulation
A. J. Pietrofitta, General Manager, Power Production Engineering,
Atlantic Electric Company
L. A. Reiter, General Manager - Licensing and Reliability
Rebecca A. Green, Bureau of Radiation Protection
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
,
bcc w/ encl:
'
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
ORP Section Chief
Project Engineer, DRP
R. B. Manilt NMSS
R. Bores, DR$S
RI D,RSS
RI
8
3.y/ca
Ke'm1g
yner
7/f/86
7/f/86
7/'}//86
I
i
~
OFFICIAL RECORD COPY
IR HC 86-28 - 0002.0.0
l
06/30/86
t
i