Partially Withheld Response to NRC Re Violations Noted in Insp Repts 50-321/86-14 & 50-366/86-14 (Ref 10CFR2.790 & 73.21).Violation Inappropriate & Should Be Withdrawn
ML20203H854
Person / Time
Site: Hatch  
Issue date: 06/30/1986
From: Gucwa L
GEORGIA POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20203H837 List:
References
0601C, 601C, SL-924, NUDOCS 8608050110
Download: ML20203H854 (2)


Text

Georgia Pow 2r Company 333 Piedmont Avsnue Atlant.a. Geor0ia 30308 Telephone 404 526 6526 Maihng Address:

L Pbst Office Box 4545 Atlanta. Georgia 30302 GeorgiaPower u r, am, tre sourten eat?c sem

"'iear safety i

.r o 7c'e'n$ing ATTACMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DEGastJROLLED bJ J 5

l r-SL-92i.'

i

- 0601C g_

7. n 33 tu =

l June 30,1986 G

o2

.:y-l U. S. Nuclear Regulatory Consnission REFERENCEg t1 Office of Inspection and Enforcement RII: JNG Region II - Suite 2900 50-321/50-366 101 Marietta Street, NW Inspection Report Atlanta, Georgia 30323 86-14 ATTENTION: Dr. J. Nelson Grace Gentlemen:

1 In response to Inspection Report Nos. 50-321/86-14 and 50-366/86-14 and the Notice of Violation transmitted to Georgia Power Company by letter dated May 30,1986, and in accordance with the provisicns of 10 CFR 2.201, Georgia Power Company submits its response in the attached enclosure.

The referenced Inspection Report pertains to the NRC inspection conducted on April 17 and 18, 1986, at the Edwin I.

Hatch Nuclear Plant located in Baxley, Georgia.

Georgia Power Company's review of the circumstances of the alleged violation indicates that the incident was self identified and that it had relatively minor safeguards significance.

As stated in NRC's Enforcement j Policy (10 CFR Part 2, Appendix C), the NRC will not generally issue a notice of violation for incidents which meet five " tests," including identification by the licensee, a violation classified as Severity Level IV, I

and corrective actions taken within a reasonable period of time.

Based on our evaluation, it appears that Region II issued the Notice of Violation, believing that the violation could reasonably be expected to have been prevented by corrective actions from a previous violation.

Georgia Power differs with this assessment and contends that the five tests are met and that a violation is inappropriate.

We respectfully request that this matter be reviewed and that the violation be withdrawn.

Georgia Power Company believes that the configuration of the plant's access control facility complies with the designs approved by the Nuclear Regulatory Commission.

Further, Georgia Power Company does not believe that the access control facility's configuration was the proximate cause of the event, nor that modifications of the configuration could have significantly reduced the possibility of this event.

geoso110860731 G

ADOCK 05000321 PDR

GeorgiaPower d ATTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 2900 June 30, 1986 Page Two You may recall that Georgia Power Company has undertaken organizational changes and initiated procedural upgrades designed to improve the effectiveness of our Security Program.

For example, on April 22, 1986, members of the Region II staff and representatives of the Georgia Power Company met to discuss Security Program improvements which had been under development for nearly 2 months.

At that meeting, Georgia Power Company advised that a thorough review and rewrite of the Physical Security Plan (PSP) had been initiated.

Specific changes and additions to access control facilities are actively being considered as part of this review.

As decisions relating to the PSP and the access control facility are made, the NRC will be promptly and properly notified.

The enclosure to this letter contains safeguards information and should be held from disclosure in accordance with 10 CFR 2.790(d) and 10 CFR 73.21.

Please contact this office if you have any questions or consnents.

Sincerely, f &m L. T. Gucwa DMC/lc Enclosure c: Georgia Power Company Nuclear Regulatory Commission Mr. H. C. Nix, Jr.

Dr. J. N. Grace, Regional Administrator General Manager, Senior Resident Inspector Plant Hatch 0601C

,,,,,