Georcia Fbwer Company 333 Piedmont Avenue 9
Atlanta, Georgia 30308 Telephone 404 526-6526 Maihng Address:
Fbst Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwa tre soutwo ektic systan Manager Nuclear Safety and Ucensing SL-799 0555C May 30, 1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Comission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 IMPLEMENTATION OF APPROVED REGULATORY IMPROYEMENTS Gentlemen:
In a "05000321/LER-1986-015, :on 860331,isolation of RHR Reactor Shutdown Cooling Suction Inboard Primary Containment Isolation Valve [[SSC" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Occurred.Caused by Inadequate Procedure.Procedure 57SV-SUV-007-1S Will Be Revised|letter dated April 30, 1986]], the NRC requested that Georgia Power Company (GPC) review, and modify as necessary, the NRC Regulatory Information Tracking System Facility Implementation plant-specific list which was enclosed with the letter.
The NRC further requested that the updated information be provided by May 31, 1986 Georgia Power Company performed a
preliminary review of the plant-specific list and determined that it would not be possible to fully i
respond by May 31, 1986, due to several factors, including the following:
1.
In several instances, the identification of the items being tracked by the NRC was not possible.
Therefore, we request that the NRC provide additional descriptive information for the items in question so that an accurate understanding of each item can be achieved.
1 2.
In some cases, we'are un2ertain as to the NRC activities that were " completed."
Until these activities can be identified, we will be unable to provide meaningful input.
3.
To assure that the status of each listed item is as accurate as possible, we are verifying our information by reviewing related correspondence and our status-tracking information, g0
+
wmms P
9 Georgia Power b Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 May 30,1986 i
Page Two In a series of telephone conversations between Mr. Rivenbark of the NRC and Mr. Heidt of GPC (during the weeks of May 12 and 19,1986), the aforementioned difficulties were discussed, and agreement was reached on the following actions:
a.
By the original submittal date of May 31, 1986, GPC will provide preliminary input to the NRC, closing as many of the items as possible, b.
In addition, GPC will provide a schedule which will indicate the date for responding to the remaining items.
In references to item (a) above, we are enclosing a markup of the plant-specific list which reflects the individual status of the various items.
Each item's status is based upon information that was easily retrieved from our files and upon our interpretation of the activity to which the item pertains.
Because of the nature of the NRC's request and dissimilar tracking systems, we cannot verify the accuracy of the information provided to the NRC.
In reference to item (b), we feel that we can provide responses to the remaining items by June 30, 1986, assuming that, with your aid, we can accurately identify the items and associated activities.
If you have questions regarding this matter, please contact Jim Heidt of my staff at (404) 526-4530 Sincerely, y L T. Gucwa JDH/lc Enclosure i
c: Georgia Power Company Nuclear Regulatory Commission i
Mr. d. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.
Senior Resident Inspector Mr. H. C. Nix, Jr.
GO-NORMS 0555C rwm
ENCLOSURE HATCH 1 TAC NO.
MPA STATUS DATE M08019 A-01 Closed 7/83 M08043 A-02 Closed 7/85 M06921 A-03 Closed 2/79 M107i0 A-04 Open Request for additional information 5/86 M07918 A-05 Closed 5/78 M11356 A-09 Further investigation needed M10444 A-10 Closed 10/80 Verification pending M10452 A-11 Closed 4/81 M10449 A-12 Further investigation needed M11260 A-14 Closed 6/85 M47000 A-16 Closed 7/82 M51096 A-17 Closed 7/85 M55713 A-18 Further investigation needed M56045 A-19 Closed 4/85 Submitted request to delete 1/86 M59101 A-20 Further investigation needed M08491 B-02 Closed 10/78 1
0 1
0556C
i l
Enclosure (continued)
HATCH 1 TAC NO.
MPA STATUS DATE M08219 B-05 Further investigation needed M46662 B-05 Closed 5/84 M08194 B-06 Closed 7/79 M08643 B-16 Further investigation needed M10300 B-20 Closed-1/84 M10362 B-21 Further investigation needed M08310 B-22 Closed 8/85 M10026 B-23 Closed 5/82 M10178 B-24 Closed 1/84 T. S. submittal 12/85 I
M42603 B-24 Closed 1/84 T. S. submittal 12/85 M46707 B-25 Open Additional submittals M10886 B-27 Pending verification M11064 B-41 Closed 7/79 4
M47143 B-41 Closed 1 2/ 81 j
M11743 B-42 Closed 12/79 M30128 B-44 Closed 2/80 M30130 B-44 Closed 2/80 l
M30131 B-44 Closed 2/80 M30132 B-44 Closed 2/80 i
M30133 B-44 Closed 2/80 l
l l
2 0556C l
I
~.... -,
Enclosure (continued)
HATCH 1
(
TAC NO.
MPA' STATUS kDATE M30134 B-44 Closed 2/80 l
M30135 B-44 Closed 2/80 M30136 B-44,
Closed 2/80
{
M30137 B-44 Closed f
2/80 t
M30138 B-44
, Closed 2/80 C'osed-2/80 M30139 B-44 l
e 3
2/80 Ongoing testing program M30140 B-44 Closed M12900 B-45 Closed.
8/80 8/81 Ongoing inspectkon M41019 B-46 Closed M12831 B-48 Closed 4/82 M42246 B-54 Closed 10/80 M42219 B-58 Closed 1/84 M42920 B-59 Closed /
8/82 Yerification Pending M42505 B-60 Closed 8/85 Ongoing program M42657 B-61 Closed Study complete 1/81 M42746 B-62 Closed 1/82 Verfication pending M43915 B-63 Closed 2/82 Verification pending M43733 B-65 Closed 1/86 i
M46610 B-70 Further investigation needed l-M51680 B-72 Closed 7/84 M52763 B-76 Closed 12'/85 t
]
3 0556 l
tL
Enclosure (continued)
HATCH 1
. TAC NO.
. STATUS DATE M52844 B-77 Open M52925 B-78 Open Submitted 1/86 M53006 B-79 Open M55600 B-84 Closed 1/85 M53595 B-85 Closed 7/85 M53678 B-86 Open M53761 B-87 Open M53844 B-88 Open M54071 B-92 Open M53988 B-93 Open M08269 C-02 Additional information to NRC 4/23/84 M06644 C-05 Hold Pending TSIP N06909 C-08 Closed 1/79 M47007 C-10 Closed 4/84 M07768 C-11 Closed 8/79 M52234 C-15 Closed 6/85 M07939 D-01 Closed 1/84 Verification pending M10084 D-11 Closed Pending date verification M12304 D-15 Further investigation needed M13277 D-17 Open 6/86 4
0556C
- s s
inclosure (continued)
HATCH 1 TAC NO.
MPA STATUS DATE M55865 D-19 Open M57156 D-20 Open Submittal 3/86 M11943 E-01 Closed Design change issued '80 M08370 E-03 Closed 8/79 M44025 F-01 Closed 3/82 M44094 F-02 Open Additional information submitted 5/86 M44166 F-03 Closed 1/84 l
l M44237 F-04 Open M44307 F-05 Open M47220 F-06 Closed 1/82 i
M47292 F-07 Closed 1/82 M51166 F-08 Closed 1/85 Program plan pending M51246 F-09 Closed 2/85 M42155 F-10 Closed 7/82 Verification pending M47943 F-11.
Closed 4/83 M44445 F-12 Closed 9/84 M44516 F-13 Closed 4/83 M44586 F-14 Closed 12/83 Ongoing program M44784 F-18 Pending verification M44855 F-19 Closed 1/84 4
5 0556C
Enclosure (continued)
HATCH 1 TAC NO.
MP_A STATUS DATE M44926 F-20 Closed 3-85 M44997 F-21 Closed 3/85 M45068 F-22 Closed 3/85 M47604 F-23 Closed 9/83 M47675 F-24 Closed 9/83 M47746 F-25 Closed 9/83 M45139 F-26 Open M45348 F-38 Closed 7/84 M45543 F-43 Closed 7/84 M45571 F-45 Closed 7/84 M45595 F-46 Closed 10/84 Verification pending M45634 F-47 Closed 10/84 M45691 F-48 Further investigation l
required M45715 F-49 Further investigation required M45739 F-50 Closed 6/82 M47862 F-51 Closed 4/83 Verification pending M46724 F-52 Closed 8/82 M45763 F-53 Closed 11/82 M45787 F-54 Closed 4/82 Implementation spring 1987 outage 6
0556C
Enclosure (continued)
HATCH 1 TAC NO.
MPA STATUS DATE M48277 F-55 Further investigation needed M45831 F-57 Closed 1/84 M48170 F-58 Closed 1/84 M45887 F-59 Closed 12/81 M45911 F-60 Closed 7/83 M45950 F-63 Open M46021 F-64 Open M46093 F-65 Open M46165 F-66 Further investigation needed M46237 F-67 Closed 7/83 M46309 F-68 Open M46380 F-69 Further investigation needed M46451 F-70 Closed 3/82 M56129 F-71 Open i
i i
1 9
0556C
- 7
Enclosure (continued)
HATCH 2 TAC NO.
MPA STATUS DATE M07811 A-01 Closed 7/83 d08095 A-02 Closed 7/85 M08497 A-03 Closed 2/79 M11354 A-09 Further investigation needed M10445 A-10 Closed 10/80 Verification pending i
M10450.
A-11 Closed 4/81 M10448 A-12 Further investigation needed M11261 A-14 Closed 6/85 M13151 A-15 Closed 6/80 M47001 A-16 Closed 7/82 M51097 A-17 Closed 7/85 M55714 A-18 Further investigation needed M56046 A-19 Closed 4/85 Submitted request to delete 1/86 M59102 A-20 Further investigation needed i
M08492 B-02 Closed 6/78 M11263 B-05 Further investigation needed 1
M46663 B-05 Closed 5/84 8
0556C
Enclosure (continued)
HATCH 2 TAC NO.
MPA STATUS DATE M08195 B-06 Closed 7/79 M12346 B-16 Further investigation needed M10387 B-20 Closed 1/84 M10330 B-21 Further investigation needed M08298 B-22 Closed 8/85 M11262 B-23 Closed 5/82 M10177 B-24 Closed 1/84 T. S. submittal 12/85 M42604 B-24 Closed 1/84 T. S. submittal 12/85 M46706 B-25 Open Additional submittals M11121 B-41 Closed 11/80 M11744 B-42 Closed 12/79 M30142 B-44 Closed 2/80 M30144 B-44 Closed
?/80 M30145 B-44 Closed 2/80 M30146 B-44 Closed 2/80 M30147 B-44 Closed 2/80 M30148 B-44 Closed 2/80 M30149 B-44 Closed 2/80 M30150 B-44 Closed 2/80 M30151 B-44 Closed 2/80 9
0556C
Enclosure (continued)
HATCH 2 TAC NO.
MPA STATUS DATE M30152 B-44 Closed 2/80 i
M30153 B-44 Closed 2/80 M30154 B-44 Closed 2/80 Ongoing testing program M12901 B-45 Closed 8/80 M41020 B-46 Closed 8/81 Ongoing inspection M12832 B-48 Closed 4/82 M42245 B-54 Closed 10/80 M42218 B-58 Closed 1/84 M42921 B-59 Closed 8/82 Verification pending i
M42506 B-60 Closed 8/85 Ongoing program M42676 B-61 Closed Study complete 1/81 M42747 B-62 Closed 1/82 Verification pending M43916 B-63 Closed 2/82 Verification pending M43738 B-65 Closed 1/86 M51681 B-72 Closed 7/84 M52764 B-76 Closed 12/85 M52845 B-77 Open M52926 B-78 Open Submitted 1/86 M53077 B-79 Open M55601 B-84 Closed 1/85 M53596 B-85 Closed 7/85 10 0556C
Enclosure (continued)
HATCH 2 TAC NO.
MPA STATUS DATE
.M53679 B-86 Open M53762 B-87 Open M53845 B-88 Open M54072 B-92 Open M53989 B-93 Open M11037 C-02 Additional information to NRC 4/84 M11023 C-10 Closed 1/70 M47008 C-10 Closed 4/84 M07814 C-11 Closed 3/81 M52235 C-15 Closed 6/85 M07940 D-01 Closed 1/84 Verification pending M100851 D-11 Closed Pending date verification M12305 D-15 Further investigation needed M13278 D-17 Open M55866 D-19 Open M57157 D-20 Open
' Submitted 3/86 M11944 E-01 Closed Design change issued 1980 H44026 F-01 Closed 3/82 M44095 F-02 Open Additional information submitted 5/86 l
t 11 j
0556C l
Enclosure (continued)
HATCH 2 TAC N0.
MPA STATUS DATE M44167 F-03 Closed 1/84 M44238 F-04 Open M44308 F-05 Open M47221 F-06 Closed 1/82 M47293 F-07 Closed 1/82 M51167 F-08 Closed 1/85 Program plan pending M51247 F-09 Closed 2/85 M42156 F-10 Cl osed 7/82 Verification pending M47944 F-11 Closed 4/83 M4446 F-12 Closed 9/84 M44517 F-13 Closed 4/83 M44587 F-14 Cl osed 12/83 Ongoing program M44785 F-18 Pending verification M44856 F-19 Closed 1/84 M44927 F-20 Closed 3/85 M44998 F-21 Closed 3/85 M45069 F-22 Closed 3/85 M47605 F-23 Closed 9/83 M47676 F-24 Closed 9/83 12 0556C
=-.,.-
1
(
Enclosure (continued)
HATCH 2 TAC NO.
MPA STATUS DATE M47747 F-25 Closed 9/83 M45140 F-26 Open M45349 F-38 Closed 7/84 M45544 F-43 Closed 7/84 M45572 F-45 Closed 7/85 M45596 F-46 Closed 10/84 Verification pending M45635 F-47 Closed 10/84 M45692 F-48 Further investigation required M45716 F-49 Further investigation required M45740 F-50 Closed 6/82 i
M47863 F-51 Closed 4/83 Verification pending M46725 F-52 Closed 8/82 M45764 F-53 Closed 11/82 M45788 F-54 Closed 4/82 Implementation fall 1987 outage l
M48278 F-55 Further investigation.
needed M45832 F-57 Closed 1/84 M48171 F-58 Closed 1/84 M45888 F-59 Closed 1 2/ 81 i
13 0556C
Enclosure (continued)
HATCH 2 TAC NO.
MPA STATUS DATE M45912 F-60 Closed 1 2/81 M45951 F-63 Open M46022 F-64 Open M46094 F-65 Open M46166 F-66 Further investigation needed M46238 F-67 Closed 7/83 M46310 F-68 Open M46381 F-69 Closed 2/82 Post implementation review outstanding M46452 F-70 Closed 3/82 M56130 F-71 Open i
l 14 0556C i
,, _ _. - _ _. - -