. _ _ - _ _ _
February 23, 1998 Mr. Nicholes J. Liparuto, Manager Nuclear Safety and Regulatory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230
SUBJECT:
AP600 INSPECTIONS, TESTS, ANALYSES, AND ACCEPTANCE CRITERIA (ITAAC)
Dear Mr. Liparulo:
The enclosure to this letter contains requests for additionalinformation or corrections to j
Revision 3 of the AP600 Tir
- information including the ITAAC. If you have any questions i
i regarding this matter, you may phone me at (301) 415-3145.
Sincerely, I
original signed by:
Jeny N. Wilson, Senior Policy Analyst Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 52 003
Enclosure:
As stated cc w/ encl: See next page l
DISTRIBUTION:
Docket File PDST R/F JRoe PUBLIC DMatthews TQuay JNWilson TKenyon BHuffman DScaletti ACRS (11)
TCheng,0-7 H15 JMoore,0-15 B18 DThatcher,0 7 E4 REmch,010 D4
- 3) S GThomas,0-8 E23 MChiramal,0-8 H3 JPeralta,0-9 A1 HWalker,0-8 D1 JBongarra,0-9 H15 JLyons,0-8 Di MSnodderly,0-8 H7 DTerso,0 7 E23 DOCUMENT NAME: A:\\lTACCLTR2.JNW To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with cttachment/ enclosure "N" = No copy OFFICE PA:PDST:DRPM l D:PDST;DRPM l l
[
NAME JNWilson:sn a TRQuay 4M DATE 02/24/98 M 02/ M/98
(/
OFFICIAL RECORD COPY
- BR3oe8 Pit 3138880s A
PDR m:
< :, (p y A' :
- 3 l
e Mr. Nicholas J. Uparulo Docket No. 52 003 Westinghouse Electric Corporation AP600 cc:
Mr. B. A. McIntyre Mr. Russ Bell i
Advanced Plant Safety & Licensing Senior Project Manager, Programs Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit 1776 l Street, NW P.O. Box 355 Suite 300 Pittsburgh, PA 15230 Washington, DC 20006 3706 Ms. Cindy L. Haag Ms. Lynn Connor Advanced Plant Safety & Lloonsing Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Dr. Craig D. Sawyer, Manager Advanced Reactor Programs Mr. Storiing Franks GE Nuclear Energy U.S. Department of Energy 175 Curtner Avenue, MC 754 NE 50 San Jose, CA 95125 19901 Germantown Road Germantown, MD 20874 Mr. Robert H. Buchholz GE Nuclear Energy Mr. Frank A. Ross 175 Curtner Avenue, MC-781 U.S. Department of Energy, NE-42 San Jose, CA 95125 Office of LWR Safety and Technology 19901 Germentown Road Barton Z. Cowan, Esq, Germantown, MD 20874 Eckert Seamans Cherin & Mellott 600 Grant Street 42nd Floor Mr. Charles Thompson, Nuclear Engineer Pittsburgh, PA 15219 AP600 Certification NE 50 Mr. Ed Rodwell, Manager 19901 Germantown Road PWR Design Certification Germantown, MD 20874 Eiectric Power Research Institute 3412 Hillview Avenue Mr. Robert Malers, P.E.
Palo Alto, CA 94303 Pennsylvania Department of Environmental Protection Bureau of Radiation Protection Rachel Carson State Office Building P,0. Box 846g Harrisburg, PA 17105 846g m
RAI. for AP600 ITAAC 640.176 The Tier 1 information for the passive containment cooling system (PCS) must include a design commitment and ITAAC for the coatings that will be applied to the intemal and extemal surfaces of the containment vessel, including the surfaces of structures and equipment inside of containment, as necessary. The acceptance criteria for the PCS ITAAC must include the thickness of the coatings. Also, the PCS ITAAC must verify the important assumptions in the transport analysis for the failed coatings and other matenals inside of containment and the transport analysis must be included in the AP600 SSAR.
i 640.177 Your response to RAI 480.1079 was acceptable but /ou must include the following design commitmen's in the ITAAC for the reactor cavity; a.
No fibrous insulation shall be located within any spherical volume centered on the axis of a reactor coolant rystem pipe and with a radius of 12 times the inner diameter (ID) of that reactor coolant system pipe where any discharge from a break of that pipe would be intercepted by intervening components, supports and structures.
- b. Where there are no intervening components, supports or structures, there shall be no fibrous insulation within a cylindrical volume extending out 45 ids from the bretk along an axis that is a continuation of the pipe axis and up to 5 ids in the radial direction from the axis.
640.178 In RAI 720.418F, the staff requested Westinghouse to confirm that core debris will not pass into the sump via interconnecting pipelines a mbedded in the concrete floor and/or sump curb. The RAI response, dated January 27,1998, indicates that a number of sleeved drain holes will be embedded in the curb, but that these lines do not represent a pathway for core debris io enter the sump since the molten debris will quench and plug these lines. However, the RAI response also indicates that debris is expected to overflow the sump curb in the hinged failure mode scenario discussed in the submittal in view of the sleeved drain holes in the curb and the potential for debris to overflow the sump curb in some scenarios, the following changes to PRA insights (PRA Chapter 59, item 41) and ITAAC are needed: (1) the PRA Insights and ITAAC should be modified to specify that there are no piping embedded in the concrete floor and/or sump curb that could provide a pathway for core debris to either enter the sump or ooss from the sumo to the containment boundarv or the environ-ment, and (2) the PRA insight regarding the des!gn having "a sump curb of sufficient height and width to prevent molten core debris from overflowing or ablating through the curb'should be reconcilod with the results of deterministic calculations provided in Appendix B of the PRA, which indicates that the debris can overflow the curb in some scenarios, and the revised insight should be incorporated into ITAAC.
640.179 Your response to RAI 640.174, which is related to RAI 640.152, on the AP600 Nuclear Fuel System and Control Rod Drive System is still unacceptable. These important systems shoulo have their own ITAAC, consist with the approach taken by Enclosure
. ~ _
2-Westinghouse for its other systems, and not be included in the reactor vessel ITAAC (2.1.3).
The ITAAC needs to have Tier 1 design descriptions that are consistent with the fuel and control rod ITAAC for the System 80+ design, because the AP600 design is not acceptable for any type of fuel or cor, trol rod design. Most of the design descriptions for the System 80+ Nuclear Fuel System and the Control Element Drive Mechanism are applicable to the AP600 design. Also, include figures for the AP600 fuel assembly and control rod drive mechanism that are similar to those provided for the System 80+ design.
640.180 in your response to RAI 440.742F, you committed to type testing of the pressurizer safety valves (refer to SSAR section 5.4.g). Verification of this test must be included in ITAAC. The ITAAC should specify the range of temperature and pressure for the type test and a minimum flow rate through the valves.
640.181 Your response to RAI 640.167F is unacceptable. The markup to Section 6.2.3.4.1 of the SSAR states that the containment isolation valves are verified to close within 20 seconds for the containment purge isolation valves and 60 seconds for all other containment isolation valves. This is inconsistent with Table 6.2.31 of the Revi-sion 1g to the SSAR, which lists the cor.tainment closure times for the main steam line, main feedwater, and the containment air filter supply and exhaust as 5 seconds (refer also to SSAR chapters g and 15).
As stated previously, Westinghouse needs to implement a program that will verify that all Tier 1 information was extracted from the AP600 SSAR (Tier 2) anel that all Tier 1 information is consistent with the information in Tier 2. An example of the problem is Tier i design commitment 11b of Table 2.3.2-4, which is not consistent with the containment Isolation valve table in the SSAR (Table 6.2.31). Also, it is not clear, 4
based on item 8 of Table 2.2.13, where the containment isolation valves of the CNS are identified.
640.182 Your response to RAI 640.15g is unocceptable. Your Tier 1 information for the initial Test Program omitted SSAR Section 14.2.3 information related to the conduct of the test program, i.e. the administrative requirements that govem the conduct of the test program, review, evaluation and approval of test results, and test records retention.
i 640.183 Your response to RAI 720.415 is unacceptable. The qualification of instrumentation and equipment required for severe accident mitigation and recovery to operate in the applicable environment must be verified by an ITAAC. The demonstration process used to provide reasonable assurance that the instrumentation and equipment will operate include one or more of the following factors: limited time period in or expo-sure to the environment, the use of similar equipment in commercial industry exposed to a similar environment, the use of analytical extrapolations, the use of vendor performance data, the use of procurement specifications imposed on the vendor, or the results of tests performed in the nuclear industry or at independent laboratories.
640.184 Your response to RAI 640.173 is unacceptable. The Tier i design description and ITAAC for SJS must have a commitment for the acceleration sensors to have a dynamic range of 0.001g to 1.0g and a frequency range of 0.20 Hz to 50 Hz. These commitments are consistent with the AP600 SSAR Section 3.7.4.2.1 and regulatory position 4.7 in Regulatory Guide 1.12. In addition, SSAR Section 3.7.5.4 is incorrect and should be deleted (refer to Chapter 2, Revision 17).
_