ML20203H143
| ML20203H143 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/16/1997 |
| From: | Johnson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Randolph G UNION ELECTRIC CO. |
| Shared Package | |
| ML20203H148 | List: |
| References | |
| 50-483-97-20, NUDOCS 9712180322 | |
| Download: ML20203H143 (5) | |
See also: IR 05000483/1997020
Text
e
e
I'
/"
-UkiTIOSTAT&S
,
f,
NUCLE AR REGUL ATORY COMMISSION
j
'5 i .(]\\3
anc.uN ev
'
611 RY AN PL AI A DHivi kut' f 400
- .
,
AH LINGTON T L * A5160118064
L.....J
l
DEC I 61997
i
Garry L Randolph. Vice President and
' Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
,
SUBJECT: NRC INSPECTION REPORT 50-483/97 20 AND NOTICE OF VIOLATION
Dear Mr. Randolph:
An NRC inspection was conducted October 26 through December 6,1997, at your Callaway
Plant reactor facility. The enclosed report presents the scope and results of that inspection.
During th'e 6-week period covered by this inspection, your conduct of activities at the Callaway
i
Plant was generally characterized by safety. conscious operations, sound engineering and
!
maintenance practices, and careful radiological controls. However, one cited violation of NRC
requirements occurred. The violation involved the failure to follow work instructions during
preventive maintenance on Emergency Diesel Generator A.
'
This violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violation are described in detailin the enclosed report. Please note that you are
required in respond to this letter and should follow the instructions specified in the enclosed .
Notice when preparing your response. The NRC will use your response, in part, to determine
.
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room. To the extent
possible, your response should not include any personal privacy, proprietary, or safeguards
,
!
information so that it can be placed in the Public Document Room without redaction.
,
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
,
,
W
)
l
William D. Johnson, Chief
}
.
Project Branch B
Division of Reactor Projects
3
,
.
._
. .
.
..
.
-
.
e
e
Union Electric Company
2-
Docket No.: 50-483
'
License No.: NPF-30
Enclosures:
- 1. Notice of Violation
2. NRC Inspection Report
50-483/97-20
,
cc w/ enclosures:
Professional Nuclear Consulting, Inc.
19041 Raines Drive
Derwood, Maryland 20855
Gerald Charnoff 7sq.
Thomas A. baxter, Esq.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, N.W.
Washington, D.C. 20037
H. D. Bono, Supervising Engineer
Quality Assurance Regulatory Support
Union Electric Cornpany
P.O. Box 620
Fulton, Missouri 65251
Manager - Electric Department
Missouri Public Service Commission
301 W. High
P.O. Box 360
Jefferson City, Missouri 65102
Ronald A. Kucera, Deputy Director
Department of Natural Resources
P.O. Box 176
Jefferson City, Missouri 65102
Otto L. Maynard, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P,0. Box 411
Burlington, Kansas 66839
l
.-
.__
o
e
Union Electric Company
3-
,
i
Dan 1. Bolef, President
Kay Drey, Representative
Board of Directors Coal # tion
for the Environment
6267 Delmar Boulevard
University City, Missouri 63130
Lee Fritz, Presiding Commissioner
Callaway Coanty Court House
10 East Fifth Street
t
Fulton, Missouri 65151
Alan C. Passwater, Manager
Liccnsing and Fuels
Union Electric Company
P.O. Box 66149
St. Louis, Missouri 63166-6149
'
J. V. Laux, Manager
Quality Assurance
,
Union Electric Company
P.O. Box 620
Fu' ton, Missouri 65251
.
%
L
--
,
l -.
-
[
_
L
,-
-
-
--
-
- - -
_.
.
.
-
-
.
e
Union Electric Company
4
DEC l 61997
E-Mail report to T. Frye (TJF)
E Mail report to T. Hiltz (TGH)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_CW\\CW720RP.DGP
To receive copy of document, Indicata in box:"C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
RIV:RI
() /
RIV: SRI [ /_ C:DRP/B
()
I
FLBrush // ' '
DGPasseKl/ " ' WDJohnsorW
12/6/97
12/[/97'
12/h97 P
'
OFFICIAL RECORD COPY
W
.
. - . - _ _
- - -
_ _ - .
., . . -
---
--.7
_- . - . - . - - -
- -
,
Q
-
,
p
,
- p-
1
,
_
Union Electric Company -
-4-
- DEC I 61997
!
-
4,
i
= E Mail report to T. Frye (TJF)
i
- E Mail report to T. Hdtz (TGH) - _
.
E Mail report to NRR Event Tracking System (IPAS) .
- E-Mail report to Document Control Desk (DOCDESK)
>
- -
. . . .
.
J
bec to DCD (IE01)
,
-
bec distrib. by RIV'
- Regional Administrator
Resident inspector =
i
DRP Director
DRS PSB
[
, Branch Chief (DRP/B)
MIS System
~ Project Engineer (DRP/B)
RIV File
.
. Branch Chief (DRP/TSS)
,
i
!
?
.
-
1
)
.
.
.:
.
r
>
a
,
j
'~
e,
,
k
-
DOCUMENT NAME: R:\\ CVWCW720RP.DGP
To receive copy of occument, ino4cete in box: ac = Copy without enclosures "E" * Copy w .h enclosures *Na e No copy
e
>
-- ;
,
6 /-
RIV: SRI ~ f ) L C:DRP/B- fl
j
}
RIV:RI . ,
_
FLBrush 7 T3 '
DGPasseKl/ " ' WDJohnsonT
12/6/97
12/p97'
12/h97 V
'
OFFICIAL RECORD COPY
3
,
'I
!
(
-
'8000'4
'
. -
,
- . .
e
,ez
,
,- . .,
,i.a-.
. - - ,
..,g,,
,-e,
,,--m--
u
v.-..w.a.,m,-,,w,,,,,
.,n,,
er ,r . s -
-~v
rg- - - - , - - - ,
ea,
w p
9