ML20203F985
| ML20203F985 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 04/21/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20203F987 | List: |
| References | |
| NUDOCS 8604280201 | |
| Download: ML20203F985 (2) | |
See also: IR 05000454/1986012
Text
.
.
APR 211986
Docket No. 50-454
Commonwealth Edison Company
ATTN: Mr. Con dell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. H. A. Walker
and R. N Sutphin of this office on March 16 through April 2, 1986, of activities
at Byron Unit I authorized by NRC Operating License No. NPT-37 and to the
discussion of our findings with Mr. R. E. Querio and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice (Order)
are not subject to the clearance procedures of the Office of Management
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We wi.ll gladly discuss any questions you have concerning this inspection.
Sincerely,
~
-
,.-
- ..-
J. J. Harrison, Chief
Engineering Branch
Enclosures:
1.
2.
Inspection Report
No. 50-454/86012
See Attached Distribution
$
, , , ,
m-
,
.
i
APR 211986
Commonwealtf. Edison Company
2
Distribution
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
Diane Chavez, DAARE/ SAFE
Steve Lewis, ELD
L. Olshan, NRR LPM
H. S. Taylor, Quality Assurance
Division
.
.
II
'
RII
RII
}
k (s'
f"
h
l ker,'(j l k
uJ
hin
H wkins'
F
ison
- p,ney
gi
(7A
Ytl
415
gg