ML20203F791
ML20203F791 | |
Person / Time | |
---|---|
Issue date: | 01/05/1999 |
From: | NRC OFFICE OF STATE PROGRAMS (OSP) |
To: | |
Shared Package | |
ML20203F757 | List: |
References | |
5.10, NUDOCS 9902180303 | |
Download: ML20203F791 (46) | |
Text
_ _ _ - _ _ _ _ _ _ - - _ _ ___
lO Formai Qualifications for Integrated Materials l- Performance Evaluation l Program (IMPEP) Team
) dembers i
Directive i
5.10 i i
i i
l l
O
,_ _ . - . _ . - _=_- - - . - ~ . - -- - - - - - -- -
1 I
Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members 1
[' Directive R10
(
. Contents Policy................................................................... 1 Obj ec t i ves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Organizational Responsibilities and Delegations of Authority . . . . . . . . . . . . 1 Executive Director for Operations (EDO) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Directors, Office of State Programs (OSP) and Office of Nuclear Material Safety and Safeguards (NMSS), and Regional Administrators . . . . . . 2 Director, Office of Human Resources (HR) . . ..................... ...... 2 Immediate Supervisors of IMPEP Team Members . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 I M PEP Team M e mbe rs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 A p pli ca bili ty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 H a n d boo k . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 g De fi n i ti o n s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 O Re fe re n ces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 I
I D
l I
Approved: January 5,1999 iii
,r m,
, [g U. S. Nuclear Regulatory Commission O V::.5/ veie-e: s o veremeetei xeiett e8 eee redite ^rre><e ose l
Formal Qualifications for Integrated Materials Performance Evaluation Program . l (IMPEP) Team Members :
Directive 5.10 Policy (5.10 - 01)
It is the policy of the U.S. Nuclear Regulatory Commission to provide o IMPEP team members and team leaders with sufficient knowledge to conduct State and regional program reviews to ensure that public health and safety is being adequately protected.
Objectives (5.10 - 02)
To provide training and development for IMPEP team members to meet minimum knowledge, skill, and ability qualification standards through a standardized methodology.
Organizational Responsibilities and Delegations of Authority (5.10 - 03)
Executive Director for Operations (EDO)
(031)
Oversees the establishment, operation, maintenance, and evaluation
. of technical and nontechnical training programs.
O V
Approved: January 5,1999 i
V: luma 5, G;vernm:nt-1 Relations and Public Affairs Ferm:1 Qu:lifications f:r Integrated Materials Performance Evaluation '
Program (IMPEP) Team Members Directive 5.10 Directors, Omce of State Programs (OSP) and Omce of Nuclear Material Safety .
and Safeguards (NMSS), and Regional Administrators (032) e Ensure all personnel acting as IMPEP team members or team leaders achieve and maintain qualifications in accordance with the guidelines provided in this directive. (a) e Ensure that the Technical Training Division (TTD) is assisted in developing, monitoring, and reviewing training courses for the IMPEP team member and team leader qualification program. (b)
Director, Office of Human Resources (HR)
(033)
Establishes, operates, maintains, and evaluates technical and nontechnical training programs to improve individual and organizational performance in support of accomplishing the mission of the agency.
Immediate Supervisors ofIMPEP Team Members (034)
Ensure that employees confirmed for training attend the training; adjust work schedules, as necessary; and only withdraw an employee from a course in the event of a personal or agency emergency.
IMPEP Team Members (035)
- Attend courses for which attendance has been confirmed and devote the effort required to achieve the maximum benefit from the training program. (a)
- Evaluate courses and provide direct feedback to their supervisors. (b) ,
Applicability (5.10 - 04) .
The policy and guidance in this directive and handbook apply to all NRC employees involved with IMPEP.
2 Approved: January 5,1999
Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Matcrials Performance Evaluation
, Program (IMPEP) Team Members p Directive 5.10 C
Handbook
. (5.10 - 05)
Handbook 5.10 provides training guidelines, qualifications, and maintenance requirements for IMPEP team members.
Definitions (5.10 - 06)
Core Training. Minimum formal classroom experience required for an IMPEP team member or team leader.
Equivalency Examination. An examination administered through the TTD, its contractors, or by management in lieu of specific course l
attendance.
Grandfathering. Qualification of an IMPEP team member to conduct independent State or regional program reviews in specific areas on the l ['N basis of previous experience and training.
I j
\
v) Interim Qualification. Qualifications of an IMPEP team member to conduct independent State or regional program reviews in specified areas before completion of all IMPEP Training and Qualification Records requirements.
Refresher Training. Training designed to update and maintain qualification.
f Self-Study Documents. Documents with which the general use and/or application an IMPEP team member should have a general understanding.
l- Supplemental Training. Additional training beyond that identified as
- required initial training to enhance a team member's technical i expertise. The additional training will be determined by the individual's supervisor.
(3 V
Approved: January 5,1999 3
V:lume 5, Gov:rnm:ntcl R:1:ti:ns cnd Public Altirs
! Formal Qualifications for Integrated Materi:Is Perform:nce Evalurtion l Program (IMPEP) Team Members
! Directive 5.10 References -
(5.10 - 07)
Code ofFederal Regulations, Title 10 (10 CFR), " Energy."
NRC Inspection Manual, Chapter 0610, " Inspection Reports."
, Chapter 1220, " Processing of NRC Form 241," Report of Proposed Activities in Non-Agreement States, and Inspection of Agreement State licensees operating under 10 CFR 150.20(b).
, Chapter 1246, " Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program Area."
, Chapter 2401, " Nuclear Surface Low-Level Radioactive Waste Disposal Facility Evaluation Program."
, Chapter 2605," Decommissioning Procedures For Fuel Cycle and Materials Licensees."
, Chapter 2641,"In-Situ Leak Facilities Inspection Program."
, Chapter 2800, " Materials Inspection Program."
, Chapter 2801, " Uranium Mill and 11e.(2) Byproduct Material Disposal Site and Facility Inspection Program."
NRC Inspection Procedure 88104, " Decommissioning Inspection Procedure For Fuel Cycle Facilities."
NRC Management Directive-5.6," Integrated Materials Performance Evaluation Program (IMPEP)."
5.9," Adequacy and Compatibility of Agreement State Programs."
8.2,"NRC Incident Response Program."
8.3, "NRC Incident Investigation Program."
8.8," Management of Allegations."
NRC Office of State Programs Internal Procedure B.7,"O mpatibility .
Categories and Health and Safety Identification for NR d gulations and Other Program Elements" (current revision).
NRC " Statement of Principle and Policy for the Agreement State Program; Policy Statement on Adequacy and Compatibility of Agreement State Programs," 62 FR 46517, September 3,1997.
4 Approved: January 5,1999
1-O Formal Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members _
Handbook 5.10 0
k O
1 n . .. .
. Volume 5, Gsvernmental Relations and Public Affairs Formal Qualifications for Intcgrated Materials Performance Evaluation Program (IMPEP) Team Members p) i Handbook 5.10 Parts I - II "G
Contents
~
Part I General 'IYaining Information and Provisions . . . . . . . . . . . . . . . . . . . . . . . 1 G e n e ral (A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Agreement State Radiation Control IMPEP Team Members (B) . . . . . . . . . . . . . . 2 G uid e li ne s (C) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Equivalency Examinations (1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~2 Waive rs ( 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Gandfathering on the Basis of Previous Experience and Training (3) . . . . . . 3 Limited Review Qualification (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1 Interim IMPEP Team Member Qualification (5) . . . . . . . . . . . . . . . . . . . . . . 5
. Post Qualification Training (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 l Program Revisions (7) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 tO V Part II Specific Training Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Basic Re quire me nt:; (A) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Training Requirements for All IMPEP Team Members (B) . . . . . . . . . . . . . . . . . . 8 S e l f- S t udy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Core Trai ning (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Supplemental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Re fre she r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Professional Experience (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Principal Reviewer for Status of Materials Inspection Program Indicator (C) . . . 9 S el f-S t udy (1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 l Supplemental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 ;
I * '
Re fre she r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Professional Experience (5) . . . . . . . . . . . . . . . . . . ..................... 10 (m
\
x.
Appmved: January 5,1999 iii
I V:lume 5, Governmentcl Relati:ns cnd Public Affairs j F;rm:1 Qualificati:ns Fcr Integrcted M terials Performance Evaluation Program (IMPEP) Team Members IIandbook 5.10 Parts I - II j
% l I
Contents (continued) .
Part II (continued)
Principal Reviewer for Technical Quality of Inspections Indicator (D) . . . . . . . . . 10 Q ualifications (1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 S e l f- S t udy (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Core Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Supplemental Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Re freshe r Training (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Professional Expe rience (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Principal Reviewer for Technical Staffing and Training Indicator (E) . . . . . . . . . . 13
.Q ualifications (1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Se lf-S t udy (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Core Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Supplemental Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Refreshe r Training (5) . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Professional Experience (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Principal Reviewer for Technical Quality of Licensing Actions (F) . . . . . . . . . . . . 15 Qualifications (1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Se lf-S tudy (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Core Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 l
Supplemental Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 l Re fre she r Training (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Professional Experience (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Principal Reviewer for Response to Incidents and Allegations Indicator (G) . . . 17 Principal Reviewer for Fesponse to Incidents and Allegations Indicator-Incident Response Limited Review (H) . . . . . . . . . . . . . . . . . . . . . 18 Se lf-S t udy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............ ... 18 Supplemental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 Re fresh e r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Professional Experience (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 iv Approved: January 5,1999 L
, . Volume 5, Govcrnmental Relations and Public Affairs l Formal Qualifications for Integrated Materials Performance Evaluation l l ,
Program (IMPEP) Team Members l Handbook 5.10 Parts I - II ,
l ! '
i C i 1 \
. 1 Contents (continued) l l
. Part II (continued)
! Principal Reviewer for Response to Incidents and Allegations Indicator-Allegation Response Limited Review (I) . . . . . . . . . . . . . . . . . . . . 20 ;
S e l f-St u dy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 {
Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Supplemental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Re fre she r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Professional Experience (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Principal Reviewer for Legislation and Program Elements Required for Compa tibility Indica tor (J) . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . 22 Se l f- S t u dy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
~ Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Supple mental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Q Re freshe r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Professional Experience (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22 23 Principal Reviewer for the Sealed Source and Device Evaluation Program Indicator Full Technical Review (K) . . . . . . . . . . . . . . . . . . . . . . . . . 23 Se l f-S t udy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Supplemental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Refreshe r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Professional Experience (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Principal Reviewer for the Sealed Source and Device Evaluation Program Indicator Limited Scope Technical Review (L) . . . . . . . . . . . . . . . . . 25 Sel f-S t udy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Co re Tra ini ng (2) . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Supple me ntal Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 l Re fresher Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 Professional Experie nce (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
- Principal Reviewer for the Low-Level Radioactive Waste Disposal l . Program Indicator (M) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 l Se l f-S t u dy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 l g) Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 l
Approved: January 5,1999 v
V:lume 5, Governmental Rel:tions cnd Public Affairs !
F rm:1 Qu lifications For Integrated Mcterials Performance Evcluation Program (IMPEP) Team Members .
IIandbook 5.10 Parts I - II !
i Contents (continued) .
Part II (continued)
Supple mental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Re fre she r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 28 Professional Experience (5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Principal Reviewer for the Uranium Recovery Program Indicator (N) . . . . . . . . . 29 S e l f- S t udy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Supplemental Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Re freshe r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Professional Experience (5) . . . . . . . . . . . . . . . ....................... 30 Principal Reviewer for Fuel Cycle Inspection Program Indicator (O) . . . . . . . . . 30 Q u alifications (1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 S e l f- S t udy ( 2 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Core Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Supplemental Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Re freshe r Training (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Professional Experience (6) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Principal Reviewer for Site Decommissioning Management Plan Indicator (P) . . 31 S e lf- S t udy ( 1 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Suppleme ntal Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . 32 Re fre she r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Professional Expe rience (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Training Requirements for IMPEP Team Leader (Q) . . . . . . . . . . . . . . . . . . . . . . . 33 Self-Study (1) .................................................... 33 Core Training (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 Suppleme ntal Training (3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 Re fre she r Training (4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Professional Expe rience (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 .
O vi Approved: January 5,1999
^
\
l 1 Volume 5, Governmcntal Relations and Public Affairs
, Formal Qualifications for Integrated Materials Performance Evaluation
/~ Program (IMPEP) Team Members {
(]./ ilandbook 5.10 Part I l 1
I Part I General Training Information and .
l Provisions l General (A) l The training and qualification process is intended to provide IMPEP l team members and team leaders with sufficient knowledge to conduct l State and regional materials program reviews that are technically ,
' correct and in accordance with NRC policies and procedures. NRC l
/D employees designated as IMPEP team members and team leaders
( ,) must successfully complete the requirements for individually assigned areas, as listed in Part II of this handbook. In addition to the requirements of this handbook, other training may be necessary to !
st., , >1ement or enhance team member development. Exemption from i specific training requirements may be granted in accordance with ;
Section (C) of this part. (1)
Upon completion of the training listed in this handbook, the IMPEP team leader's or team member's understanding of the material may be evaluated orally by his or her immediate supervisor. (2) 1 An individual not yet qualified as an IMPEP team member may participate in an IMPEP review under the direction of an individual qualified to conduct the review for the specified performance indicator. (3)
To become qualified to act as principal reviewer of an indicator or
, become an IMPEP team leader, an individual must meet or complete the appropriate training and qualification requirements. (4) i 1
1 1
DN A i
I
\ ,)
i l
Approved: January 5,1999 I
Volume 5, Governmentcl Relations and Public Affairs Rrm:1 Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members IIandbook 5.10 Part I ,
General (A)(continued)
Special circumstances (e.g., budget reductions, delays in establishing training course replacement contracts, or unavailability of critical instructors) may result in the temporary unavailability of courses required for formal qualification. This does not remove the need for the qualifying individual to attend the required course or to receive equivalent training. (5)
The Director of the Office of State Programs (OSP) (or designee),
Director of the Office of Nuclear Material Safety and Safeguards (NMSS) (or designee), regional administrator (or designee), or the Agreement State radiation control program director (or designee) may authorize an individual with previous successful IMPEP experience to participate in reviews through "grandfathering," even though the individual may not be fully qualified pursuant to this guidance. The basis for the authorization should be on alternate training and experience equivalent to that contained in this guidance document. (6)
Agreement State Radiation Control IMPEP Team Members (a) h The Agreement State radiation control program director should ensure, at NRC's request in writing, that Agreement State personnel acting as IMPEP team members achieve and maintain qualifications in accordance with the guidelines in this handbook.
Guidelines (c)
Equivalency Examinations (1)
Equivalency examinations to validate specific course work may be taken by IMPEP team members or team leaders who, through prior experience and education, possess sufficient knowledge to otherwise meet the minimum requirements. Requests for equivalency examinations should be made from the individual's supervisor, along with any necessary additional management concurrence, to the '
Director, Technical Training Division, Office of Human Resources.
The supervisor should consider the candidate's ability to act as principal reviewer for a specific IMPEP performance indicator without .
the benefit of the additional knowledge and regulatory perspective that would be gained by attending the course. Use of these examinations is ,
generally expected to be a rare occurrence.
2 Appnwed: January 5,1999
i
. Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation
, Program (IMPEP) Team Members i r Handbook 5.10 Part I k
l Guidelines (c)(continued)
Waivers (2)
The Director, OSP (or designee), the Director, NMSS (or designee), l regional administrator (or designee), and Agreement State radiation l control program director (or designee) have the authority to permanently waive any requirement or extend the time period for any i requirement listed for an IMPEP team member in this handbook. !
Justification for the waiver or extension will be documented. .
l Grnndfathering on the Basis of Previous Experience and Training (3)
An individual may be designated as qualified to independently review any appropriate performance indicator (s) through grandfathering. A grandfathering qualification process, determined on the basis of previous IMPEP experience, may be applied to anyindividual who has sufficient experience in State and/or regional IMPEP reviews l (s conducted before the effective date of this management directive. The
< individual's immediate supervisor should consider the candidate's ability to act as principal reviewer for a specific IMPEP performance indicatorwithout receiving the benefit of the additional training and/or ,
on-the-job experience. The supervisor should notify his or her branch j chief, office director, regional administrator, or Agreement State l radiation control program director that the individual is recommended as qualified to conduct independent reviews of specified IMPEP performance indicators through grandfathering. Post qualification training should be considered for all individuals grandfathered into IMPEP. The Director, OSP (or designee), the Director, NMSS (or designee), regional administrator (or designee), or Agreement State radiation control program director (or designee) will issue the grandfathering qualification. Justification for grandfathering will be documented.
Limited Review Qualificaticn (4) i l There are two separate qualification listings for the common l
performance indicator, Response to Incidents and Allegations. An ,
IMPEP team member shall complete the training specified in both l Sections (H) and (I) of Part II of this handbook to be fully qualified to 1 act as principal reviewer for this indicator. An IMPEP team member p v.ho completes Part II(H) is qualified to complete the incident l
V response review portion of this indicator. An IMPEP team member Approved: January 5,1999 3 i
V:lume 5, Governmental Relati:ns cnd Public Affairs
.F:rm:I Qualific-ti:ns f;r Integrated Mrteri Is Performance Evaluation ~
Program (IMPEP) Team Members Handbook 5.10 Part I Guidelines (C)(continued) .
Limited Review Qualification (4) (continued) who completes Part II(I) is qualified to complete the allegation response review portion ci this indicator. (a)
There are two separate qualification listings for the non-common performance indicator, sealed source and device (SS&D) evaluation program. Two types of reviews can be completed involving this indicator. (b)
- Full technical review. An IMPEP team member completing a full technical quality review shall be qualified (through education and experience) in all technical disciplines necessary to review all aspects of an SS&D program. The team member should be qualified to independently conduct a complete technical review of sealed source and device evaluations, assess technical staffing and training, and review the evaluation of defects and incidents regarding SS&Ds. (i) e Limited-scope technical review. An IMPEP team member completing a limited-scope technical review of an SS&D program shall have substantial knowledge of a radioactive materials regulatory program, as well as an understanding of health physics and mechanics along with the technical ability to discern the safety significance of product integrity issues. A team member's review of the technical quality of product evaluation and evaluation of defects and incidents regarding SS&Ds should be of broad scope and not focus on any one specific technical aspect. An IMPEP team member conducting a limited-scope technical review of an SS&D program is qualified to review the technical staffing and training of an SS&D program. (ii)
The principal reviewer for the non-common performance indicator, low-level radioactive waste (LLRW) disposal program, shall be l
qualified to review at least one technical aspect of an LLRW disposal ^
program. The team member's review of the technical quality of l inspections, technical quality of licensing actions, and response to l incidents and allegations, should focus on the aspect of the LLRW .
I program in which the team member has experience (e.g., health l physics, environmental monitoring, hydrology, or performance l assessment). Additionally, unless the team member has licensing 4 Approved: January 5,1999
. Volume 5, Governmental Relntions and Public Afralrs Formal Qualifications for Integrated Materials Performance Evaluation l , Program (IMPEP) Team Members Handbook 5.10 Part I Guidelines (c)(continued)
Limited Review Qualification (4) (continued) experience, an LLRW inspector may be limited to a review of technical quality of inspections. Similarly, an experienced LLRW license reviewer may not be qualified to evaluate technical quality of inspections. An IMPEP team member acting as principal reviewer for this indicator is qualified to review the status of inspections and technical staffing and training aspects of an LLRW program.(c) -
The principal reviewer for the non-common performance indiutor, uranium recovery program, shall be qualified to review at least one technical aspect of a uranium recovery program. The team member's review of the technical quality of inspections, technical quality of l
licensing actions, and response to incidents and allegations, should focus on the aspect of the uranium recovery program in which the team member has experience (e.g., health physics or environmental p)
(U monitoring). Additionally, unless the team member has licensing experience, a uranium recovery facility inspector may be limited to a review of technical quality or inspections. Similarly, an experienced uranium recovery facility license reviewer may not be qualified to evaluate technical quality of inspections. An IMPEP team member acting as principal reviewer for this indicator is qualified to review the status of inspections and technical staffing and training aspects of a uranium recovery program.(d)
Interim IMPEP Team Member Qualification (5)
An IMPEP team member who has not completed all requirements for final qualification under the applicable listing in the handbook may obtain interim qualification to take part in an IMPEP review. The individual's supervisor will evaluate the individual's qualifications, l identify the performance indicator (s) for which interim qualification is appropriate, and request management approval. A request will then be generated through the individual's management for interim qualification in the identified area (s). The request will be approved by the Director, OSP (or designee) for OSP staff; by the Director, NMSS
' (or designee) for NMSS staff; by the appropriate regional administrator (or designee) for NRC regional staff; or by the appropriate Agreement State radiation control program director (or
/7 designee) for Agreement State staff. Approval ofinterim qualification will be documented and a record kept in the individual's training file.
2 Approved: January 5,1999 5 l
Volume 5, Governmental Relati::ns and Public Affairs
. Farm:1 Qualificati:ns for Integrated Mcterials Performance Evaluation '
Program (IMPEP) Team Members Handbook 5.10 Part I Guidelines (C)(continued) .
Post Qualification Training (6)
This handbook identifies training requirements beyond those that are required for initial qualification for the experienced IMPEP team member or team leader. For team members who have received certification of initial qualification, additional training is identified in
" Supplemental Training" and " Refresher Training," respectively, for each indicator in Part II of the handbook. Refresher training is required as specified and must be taken at the given frequency following initial qualification. This additional training recognizes that IMPEP team leader or team member training does not stop with initial qualification, but that training should be made available for experienced team members on the basis of need, special circumstances, and the necessity of keeping current with NRC and Agreement State materials programs.
Program Revisions (7)
This handbook will be periodically revised to reflect the training needs of IMPEP team members and team leaders as determined by changes to the IMPEP review program. When a revision is issued, personnel who qualified under previous requirements shall remain qualified, but must complete any new training requirements in their area within 3 years from the date of the revision,if theywish to retain their eligibility.
Personnel in the process of qualifying when a revision is issued, may complete their qualification under their original requirements, but must complete any new formal classroom training requirements in their area within 3 years from the date of the revision, if they wish to retain their eligibility. Exemptions to specific newly revised formal training requirements and extensions to the 3-year time period can be granted using the procedures outlined in Section (C)(2) of this part.
l i
i 9
6 Approved: January 5,1999
Volume 5, Governmental Relations and Public Affairs
. Formal Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members C(N Handbook 5.10 Part II l
l Part II Specific Training Requirements -
Basic Requirements (A)
IMPEP team members are expected to have a Bachelor's degree or equivalent training or experience in the physical, life sciences, engineering, or other appropriate fields. (1)
Individuals assigned as IMPEP team members or team leaders must
(~~
()' successfully complete the general IMPEP team member requirements as described in Part I of this handbook, as well as the applicable requirements listed in Sections (B) through (Q) of this part. (2)
Written examinations will be used for designated courses to evaluate the candidate's understanding of the material. The passing grade for most examinations is 70 percent. (3)
Not all courses have formal examinations. In these cases, satisfactory course completion is determined by attendance and completion ofclass activities. (4)
Individuals who fail examinations may be given the opportunity to review the material through self-study and then be reexamined. If deemed necessary, individuals who fail a course may repeat the course in accordance with established policy of the Technical Training Division (TTD), Office of Human Resources. (5)
In all cases, completion of formal training courses will be documented by official correspondence from the provider of thc training (normally TTD) and will be recorded in the agencywide training tracking system
. (NRC employees). (6)
O
\,
Approved: January 5,1999 7
Volume 5, Governmental Relations and Public Affairs
. Formal Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members IIandbook 5.10 Part II
'lYaining Requirements for All IMPEP '
Team Members (a)
The training described below is required for all IMPEP team members.
Self-Study (1) e NRC or Agreement State Orientation (a)
- NRC Management Directive 5.6, " Integrated Materials Performance Evaluation Program (IMPEP)" (b) e 10 CFR Parts 19 and 20 (c) e 10 CFR Parts 30-36 and 39 (d) e 10 CFR Parts 40,70, and 71 (e) e 10 CFR Part 150 (State reviews)(f)
- Final Statement of Principle and Policy for the Agreement State Programs (State reviews) (g)
. Final Policy Statement on Adequacy and Compatibility of Agreement State Programs (State reviews) (h)
Core Training (2)
The course, IMPEP Training, currently establishes the minimum formal classroom training required for all IMPEP team members.
Refer to Part I(C) of this handbook for exceptions to these requirements.
Supplemental'IYaining (3)
Courses may be developed to provide additional training beyond that identified as required training. This training will be determined by the individual's supervisor and will depend on the individual's previous ,
education and work experience.
Refresher Training (4) .
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
8 Approved: January 5,1999
i Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation
. Program (IMPEP) Team Members i
Handbook 5.10 Part II J
Training Requirements for AllIMPEP Team Members (B)(continued)
Professional Experience (5) !
1 The minimum amount of work experience required for all IMPEP team members is 2 years experience with a radioactive materials program (including Agreement State program, fuel cycle, radioactive waste, or sealed source and device evaluation) before and within 5 years of participating in IMPEP. -
Principal Reviewer for Status of Materials Inspection Program Indicator (C)
Along with the qualifications outlined in Section (B) of this part, the training described below, or equivalent, is required for all IMPEP team members acting as principal reviewer for the common performance indicator, status of materials inspection program.
Self-Study (1)
The reviewer should be familiar with the following:
- NRC Inspection Manual Chapter 2800, " Materials Inspection Program"(a)
- NRC 1nspection Manual Chapter 1220," Processing of NRC Form 241," Report of Proposed Activities in Non-Agreement States, and Inspection of Agreement State licensees operating under 10 CFR 150.20 (b)
- NRC Inspection Manual Chapter 0610, "Inspectiori Reports" (c)
Core Training (2)
Currently, the course, IMPEP Training, establishes the minimum
, formal classroom training requirement for all IMPEP team members acting as principal reviewer for the common performance indicator, status of materials inspection program.
/
i l
Approved: January 5,1999 9
Volume 5, Governmental Relations and Public Affairs
. Formal Qualificatirns for Integrated Materials Performance Evaluation '
Program (IMPEP) Team Members Handbook 5.10 Part II Principal Reviewer for Status of Materials Inspection Program Indicator (C)(continued)
Supplemental Training (3)
The following courses provide additional training beyond that identified as self-study a'id core training. This training will be e determined by the indiv: dual's supervisor and will depend on the individual's previous education and work experience. .
- Fundamentals of Inspection Course (G-101) or Inspection Procedures Course (G-108) (a) e Inspecting for Performance-Material's Version (G-304) (b) e Root Cause/ Incident Investigation Workshop (G-205) (c)
Refresher Training (4)
Refresher training will include IMPEP Training a minimum of once evey 2 years and other courses as determined by management.
Professional Experience (5)
The minimum amount of work experience required for all IMPEP team members acting as principal reviewer for the common performance indicator, status of materials inspection program, is 2 years experience with a radioactive materials program (inclu~ ding Agreement State program, fuel cycle, radioactive waste, or sealed source and device evaluation) before and within 5 years ofparticipating in IMPEP.
Principal Reviewer for Technical Quality of Inspections Indicator (D)
Qualifications (1)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below, or equivalent, is required for all IMPEP team members acting as principal reviewer for the common performance indicator, technical quality of inspections, and/or completing inspector accompaniments. (a) 10 Approved: Januay 5,1999
l .
Eume 5, Governmental Relations and Public Affairs l Formal Qualifications for Integrated Materials Performance Evaluation
. Program (IMPEP) Team Members Handbook 5.10 Part II
,O i
Principal Reviewer for Technical Quality of Inspections Indicator (o)(continued) l Qualifications (1) (continued) ,
l An IMPEP team member that isjournal qualified as an inspector under NRC Inspection Manual Chapter 1246, " Formal Qualification Programs in the Nuclear Materials Safety and Safeguards Program Area," or Agreement State equivalent, is by definition technically !
qualified to act as principal reviewer for this indicator. (b) -
l 1
Self-Study (2) l The reviewer should be familiar with the following:
- NRC Inspection Manual Chapter 2800, " Materials Inspection i Program"(a) e NRC Inspection Manual Chapter 1220, " Processing of NRC Q m 241," Report of Proposed Activities in Non-Agreement {
o es, and Inspection of Agreement State licensees operating )
under 10 CFR 150.20 (b) e NRC Inspection Manual Chapter 0610, " Inspection Reports" (c) e NRC Inspection Procedure 87100 Series, " Licensed Materials Programs"(d)
. A!) applicable temporary instructions related to materials programs (e)
Core Training (3)
The following courses establish minimum formal classroom training requirements for all IMPEP team members acting as principal reviewer for the common performance indicator, technical quality of
, inspections.
- Fundamentals of Inspection Course (G-101) or Inspection Procedures Course (G-108) (a) 1 n) e Root Cause/ Incident Investigation Workshop (G-205) (b)
Approved: January 5,1999 11
Volume 5, Governmental Relations and Public Affairs
. Formal Qualificctions for Integrated Materials Performance Evaluation ~
Program (IMPEP) Team Members Handbook 5.10 Part II Principal Reviewer for Technical Quality of IHSpections Indicator (D)(continued)
Core Training (3) (continued) e Inspecting for Performance Course-Materials Version (G-304) (c)
. Applied Health Physics (H-109) or Health Physics Technology Course (H-201) (d)
- Diagnostic and Therapeutic Nuclear Medicine Course (H-304)(e)
- Safety Aspects of Industrial Radiography Course (H-305) (f)
- Transportation of Radioactive Materials Course (H-308)(g) e Teletherapy and Brachytherapy Course (H-313) (h)
Supplemental Training (4)
The following courses provide additional training beyond that identified as self-study and core training. This training will be determined by the individual's supervisor and will depend on the individual's previous education and work experience.
- Environmental Monitoring for Radioactivity Course (H-111) (a) e Air Sampling for Radioactive Material Course (H-119) (b) e Radiological Surveys in Support of Decommissioning (H-120) (c) e Respiratory Protection Course (H-311) (d)
- Internal Dosimetry & Whole Body Counting Course (H-312) (e) e Safety Aspects of Well Logging Course (H-314) '(f) e Irradiator Technology Course (H-315) (g)
O 12 Approved: January 5,1999
l .
Volume 5, Governmental Relations and Public Affairs l l Formal Qualifications for Integrated Materials Performance Evaluation ;
- l. Program (IMPEP) Team Members ]
3 IIandbook 5.10 Part II 1
(G i j
Principal Reviewer for Technical Quality of Inspections Indicator (D)(continued)
Refresher 1 raining (5) l Refresher training will include the following courses and other courses as determined by management:
. Fundamentals of Inspection Refresher Course (G-102) (a) ,
- Health Physics Topical Review Course (H-401) (b)
Professional Experience (6)
The minimum amount of work experience required for all IMPEP team members acting as principal reviewer for the common j performance indicator, technical quality ofinspections, is 2 years as an '
independent inspector before and within 5 years of participating in IMPEP.
U Principal Reviewer for Technical Staffing and
'IYaining Indicator (E)
Qualifications (1)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team ,
members acting as principal reviewer for the common performance indicator, technical staffing and training. (a) j An IMPEP team member that is journal qualified as an inspector or license reviewer under NRC Inspection Manual Chapter 1246,
" Formal Qualification Programs in the Nuclear Materials Safety and Safeguards Program Area," or Agreement State equivalent, is by definition technically qualified to act as principal reviewer for this indicator. (b)
Self Study (2)
The reviewer should be familiar with the following:
,- e NRC Inspection Manual Chapter 1246, " Formal Qualification l /] Programs in the Nuclear Material Safety and Safeguards Program y/ Area" (a)
L Approved: January 5,1999 13
Wlume 5, Governmental Relations and Public Affairs
.Fermal Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members '
Handbook 5.10 Part II Principal Reviewer for Technical Staffing and Daining Indicator (E)(continued)
Self-Study (2)(continued)
- NRC/ Organization of Agreement States Training Working Group Recommendations for Agreement State Training Programs for State reviews (b) -
Core Raining (3) -
Currently, the course, IMPEP Training, establishes the minimum formal classroom training requirement for all IMPEP team members acting as principal reviewer for the common performance indicator, technical staffing and training.
Supplemental Training (4)
The following course provides additional training beyond that identified as required self-study and core training. This training will be determined by the individual's supervisor and will depend on the individual's previous education and work experience.
- Root Cause/ Incident Investigation Workshop (G-205)
Refresher Training (5)
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
Professional Experience (6)
The minimum amount of work experience required for all IMPEP team members acting as principal reviewer for the common performance indicator, technical staffing and training, is 2 years experience with a radioactive materials program (including Agreement State program, fuel cycle, radioactive waste, or sealed '
source and device evaluation) before and within 5 years of participating in IMPEP. j e
14 Approved: January 5,1999
Volume 5, Governmental Relations and Public Affairs l Fermal Qualifications for Integrated Materials Performance Evaluation l , Program (IMPEP) Team Members l p Handbook 5.10 Part II V
l Principal Reviewer for Technical Quality of Licensing Actions (F)
Qualifications (1)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team members acting as principal reviewer for the common performance l indicator, technical quality of licensing actions. (a) .
An IMPEP team member that isjournal qualified as a license reviewer under NRC Inspection Manual Chapter 1246, " Formal Qualification Programs in the Nuclear Materials Safety and Safeguards Program Area," or Agreement State equivalent, is by definition qualified to act ,
as principal reviewer for this indicator. (b) i Self-Study (2)
()
V The reviewer should be familiar with the following:
e .NRC Inspection Manual Chapter 2800, " Materials Inspection l Program"(a)
- NRC Inspection Manual Chapter 1220, " Processing of NRC ,
Form 241," Report of Proposed Activities in Non-Agreement l States, and Inspection of Agreement State licensees operating under 10 CFR 150.20 (b) e NRC Inspection Procedure 87100 Series, " Licensed Materials Programs"(c)
Core Training (3)
The following courses establish minimum formal classroom training requirements for all IMPEP team members acting as principal reviewer for the common performance indicator, technical quality of
> . licensing actions.
- Licensing Practices and Procedures (G-109) (a)
O e Applied Health Physics (H-109) or Health Physics Technology i
Q Course (H-201) (b) l Approved: January 5,1999 15
Volume 5, G:vernmental Relations and Public Affairs
. Formal Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members Ilandbook 5.10 Part II Principal Reviewer for Technical Quality of Licensing Actions (F)(continued)
Core 'IYaining (3) (continued)
- Diagnostic and Therapeutic Nuclear Medicine (H-304)(c) e Safety Aspects ofIndustrial Radiography (H-305)(d)
~
e Transportation of Radioactive Materials (H-308)(e)
- Teletherapy and Brachytherapy (H-313) (f) 1 Supplemental Training (4)
The following courses provide additional training beyond that identified as self-study and core training. This training, or equivalent, will be determined by the individual's supervisor and will depend on the individual's previous work experience.
- Fundamentals of Inspection Course (G-101) or Inspection Procedures Course (G-108) (a)
- Environmental Monitoring for Radioactivity Course (H-111) (b) e Air Sampling for Radioactive Material Course (H-119) (c)
- Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) Course (H-121) (d) e Respiratory Protection (H-311) (e)
- Internal Dosimetry & Whole Body Counting Course (H-312) (f)
- Safety Aspects of Well Logging (H-314) (g)
- Irradiator Technology (H-315) (h) e Root Cause/ Incident Investigation Workshop (G-205) (i) .
O l
l 16 Approved: January 5,1999 l 1
Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation
, Program (IMPEP) Team Members r Handbook 5.10 Part II
\ ])
Principal Reviewer for Technical Quality of IsicenSing Actions (F)(continued)
Refresher Training (5)
Refresher training will include the following course and other courses as determined by management:
Health Physics Topical Review Course (H-401)
Professional Experience (6)
The minimum amount of work experience required for all IMPEP team members acting as principal reviewer for the common performance indicator, technical quality of licensing actions, is 2 years as an independent license reviewer before and within 5 years of participating in IMPEP.
rm Principal Reviewer for Response to
(.) Incidents and Allegations Indicator (c)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described in both Sections (H) and (I) of this part are required for all IMPEP team members acting as principal reviewer for the common performance indicator, response to incidents and allegations. (1)
An IMPEP team member is qualified to perform an incident response limited review by completing the qualifications outlined in Section (H) of this part. Similarly, an IMPEP team member is qualified to perform an allegation response limited review by completing the qualifications outlined in Section (I) of this part. (2)
An IMPEP team member that is journal qualified as an inspector under NRC Inspection Manual Chapter 1246, " Formal Qualification Programs in the Nuclear Materials Safety and Safeguards Program Area," or Agreement State equivalent, is by definition technically qualified to act as principal reviewer for this indicator. (3) l
. O
%.]
Approved: January 5,1999 17
Volume 5, Governmental Relations and Public Affairs
. Formal Qualifications for Integrated Materials Performance Evaluation Program (IMPEP) Team Members Handbook 5.10 Part II Principal Reviewer for Response to
' Incidents and Allegations Indicator-Incident Response Limited Review (H)
Along with the qualifications outlined in Sections (A) and (1-) of this part, the training described below is required for all IMPEP team members completing an incident response limited review as part of the common performance indicator, response to incidents and allegations.
Self-Study (1)
- NRC Management Directive 8.2, "NRC Incident Response Program" (a)
- NRC Management Directive 8.3, "NRC Incident Investigation Program" (b)
- NRC Inspection Manual Chapter 2800, " Materials Inspection Program," including guidance on allegations, references on incident response, and interactions with other agencies (c)
- NUREG-1303, " Incident Investigation Manual" (d) e Handbook on Nuclear Materials Event Reporting in the Agreement States (State reviews) (e) e Nuclear Materials Event Database (f)
Core Training (2)
These courses establish minimum formal classroom training requirements for all IMPEP team members completing an incident response limited review as part of the common performance indicator, response to incidents and allegations.
- Fundamentals of Inspection Course (G-101) or Inspection ,
Procedures Course (G-108) (a) e Root Cause/ Incident Investigation Workshop (G-205) (b) .
- Applied Health Physics (H-109) or Health Physics Technology Course (H-201) (c) 18 Approved: January 5,1999
Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation '
. Program (IMPEP) Team Members
(~} Ilandbook 5.10 Part II V
i Principal Reviewer for Response to Incidents and Allegations Indicator-Incident Response Limited Review (H)(continued)
Core Training (2) (continued)
! . Diagnostic and Therapeutic Nuclear Medicine Course (H-304)(d) l .
e Safety Aspects of Industrial Radiography Course (H-305) (e) e Transportation of Radioactive Materials Course (H-308)(f) e Teletherapy and Brachytherapy Course (H-313) (g)
Supplemental Training (3)
The following courses provide additional training beyond that s"j identified as self-study and core training. This training will be determined by the individual's supervisor and will depend on the individual's previous education and work experience.
- Environmental Monitoring for Radioactivity Course (H-111) (a) ,
i e Air Sampling for Radioactive Material Course (H-119) (b)
- Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) Course (H-121) (c) l e Respiratory Protection Course (H-311) (d) l e Internal Dosimetry & Whole Body Counting Course (H-312)(e) l e Safety Aspects of Well Logging Course (H-314) (f) e Irradiator Technology Course (H-315) (g) i 1 5
(
\
1 Approved: January 5,1999 19
Volume 5, Governmental Relations and Public Affairs
.Formcl Qu lific tions for Integrated Materials Performance Evaluation Program (IMPEP) Team Members IIandbook 5.10 Part II Principal Reviewer for Response to Incidents and Allegations -
Indicator-Incident Response 1 Limited Review (H)(continued) l Refresher Training (4) l Refresher training will include the following courses and other courses l as determined by management: ,
e Fundamentals of Inspection Refresher Course (G-102) (a) e Health Physics Topical Review Course (H-401) (b)
Professional Experience (5)
The minimum amount of work experience required for all IMPEP team members completing an incident response limited review as part of the common performance indicator, response to incidents and allegations, is to have had some involvement with incident response (e.g., experience in NRC's incident response group in headquarters or a regional office, experience with inspection or assessment ofincident response programs) before and within 5 years of participating in IMPEP.
Principal Reviewer for Response to Incidents and Allegations Indicator-Allegation Response Limited Review (I)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team members completing an allegation response limited review as part of the common pedonnance indicator, response to incidents and allegations. (Note: Only NRC personnel will review this indicator during NRC regional resiews.)
self-Study (1) ,
The reviewer should be familiar with the following:
- NRC Management Directive 8.8," Management of Allegations"(a) e NRC Allegation Memoranda,96-01,96-02, and 98-01 (b) 20 Approved: January 5,1999
. Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation
, Program (IMPEP) Team Members
,n IIandbook 5.10 Part II d
e Principal Reviewer for Response to Incidents and Allegations Indicator-Allegation Response Limited Review (I)(continued)
Core 'naining (2)
Currently, the course, IMPEP Training, establishes the minimum formal classroom training requirement for all IMPEP team members completing an allegation response limited review as part of the ,
common performance indicator, response to incidents and allegations. i Supplemental Training (3)
The following course provides additional training beyond that identified as self-study and core training. This training will be determined by the individual's supervisor and will depend on the f individual's previous education and work experience.
- Root Cause/ Incident Investigation Workshop (G-205)
Refresher'IYaining (4)
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
1 Professional Experience (5) :
The minimum amount of work experience required for all IMPEP team members completing an allegation response limited review as part of the common performance indicator, response to incidents and allegations, is to have had some involvement with allegations (e.g.,
receipt of allegations, interviewing allegers, inspecting / investigating allegations, participating in allegation review boards, corresponding with allegers, or serving as an office allegation coordinator) before and
, within 5 years of participating in IMPEP.
Approved: January 5,1999 21
e Volume 5, Governmental Relations and Public Affairs
. Formal Qualificctions for Integrated Materials Performance Evaluation Program (IMPEP) Team Members Handbook 5.10 Part II Principal Reviewer for Legislation and Program Elements Required for Compatibility Indicator (J)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team members acting as principal reviewer for the non-common performance indicator, legislation and program elements required for compadidlity. -
Self-Study (1)
- NRC Management Directive 5.9," Adequacy and Compatibility of Agreement State Programs"(a)
. Office of State Programs Internal Procedure B.7," Compatibility Categories and Health and Safety Identification for NRC Regulations and Other Program Elements"(b)
Core 'IYaining (2)
Currently, the course, IMPEP Training, establishes the minimum formal classroom training requirements for all IMPEP team members acting as principal reviewer for the common performance indicator, legislation and program elements required for compatibility.
Supplemental Training (3)
The following course provides additional training beyond that identified as self-study and core training. This training will be determined by the individual's supervisor and will depend on the individual's previous work experience and planned IMPEP activities in specific areas.
- Root Cause/ Incident Investigation Workshop (G-205) -
Refresher Training (4) ,
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
22 Approved: January 5,1999
Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation l . Program (IMPEP) Team Members Handbook 5.10 Part II Principal Reviewer for Legislation and l
Program Elements Required for Compatibility Indicator (J) (continued)
! Professional Experience (5)
The minimum amount of work experience required for all IMPEP team members acting as principal reviewer for the non-common performance indicator, legislation and program elements required for compatibility,is direct involvement in some aspect of the promulgatio~n of NRC or Agreement State regulations before and within 3 years of participating in IMPEP or the review of two Agreement State regulations for compatibility before and within 2 years of participating l in IMPEP.
l Principal Reviewer for the Scaled I Source and Device Evaluation Program Indicator Full Technical Review (K)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team members completing a full technical review as principal reviewer for the non-common performance indicator, sealed source and device (SS&D) evaluation program.
l Self-Study (1)
- e NUREG-1556, Vol. 3, " Consolidated Guidance About Materials Licenses"(a)
, e ANSI N538-1979, " Classification of Industrial Ionizing Radiation l Gauging Devices"(b)
- ' ANSI N542-1977," Sealed Radioactive Source Classification"(c)
- Regulatory Guide 6.9," Establishing Quality Assurance Programs for the Manufacture and Distribution of Scaled Sources and Devices Containing Byproduct Material" (d) l l
Approved: January 5,1999 23
Volume 5, G vernmental Relations cnd Public Affairs
.Frm:1 Qualifications for Integrated Meterials Pcrformance Evaluation Program (IMPEP) Team Members IIandbook 5.10 Part II I
Principal Reviewer for the Scaled Source and Device Evaluation Program Indicator Full Technical Review (K)(cominued)
Core Training (2)
The following courses establish minimum formal classroom training requirements for all IMPEP team members completing a full technical
- view as principal reviewer for the non-common performance indicator, SS&D evaluation program.
- Sealed Source and Device Workshop (a)
- Applied Health Physics (H-109) or Health Physics Technology Course (H-201)(b)
Supplemental Training (3)
The following courses provide additional training beyond that identified as required initial training. This training will be determined by the individual's supervisor and will depend on the individual's previous education and work experience.
- D. agnostic and Therapeutic Nuclear Medicine Course (H-304)(a) e Safety Aspects of Industrial Radiography Course (H-3J5) (b) l e Teletherapy and Brachytherapy Course (H-313) (c)
I
- Safety Aspects of Well Logging Course (H-314) (d) e Root Cause/ Incident Investigation Workshop (G-205) (e)
Refresher Training (4)
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
O 24 Approved: January 5,1999
Volume 5, Governmcntal Relations and Public Affairs Formal Qunlifications for Integrated Materials Performance Evaluation
, Program (IMPEP) Team Members
! p Handbook 5.10 Part II
\
Principal Reviewer for the Scaled Source and Device Evaluation Program Indicator Full Technical Review (K)(continued)
Professional Experience (5)
The minimum amount of work egerience required for all IMPEP team members completing a full teci.nical review as principal reviewer for the non-common performam indicator, SS&D evaluation program, is 2 years as an independent SS&D reviewer before and within 5 years of participating in IMPEP.
Principal Reviewer for the Scaled l Source and Device Evaluation Program Indicator Limited Scope Technical Review (L) lq V Along with the qualifications outlined in Sections (A) and (B) of this l part, the training described below is required for all IMPEP team l members completing a limited scope technical review as principal l reviewer for the non-common performance indicator, SS&D evaluation program.
Sell-Study (1) e NUREG-1556, Vol. 3," Consolidated Guidance About Materials Licenses." (a)
- ANSI N538-1979, " Classification of Industrial Ionizing Radiation Gauging Devices"(b)
. ANSI N542-1977," Sealed Radioactive Source Classificar;on"(c) l
- Regulatory Guide 6.9," Establishing Quality Assurance Programs for the Manufacture and Distribution of Sealed Sources and Devices Containing Byproduct Material" (d) i-f3 h
Approved: January 5,1999 25
V:lume 5, Governmental Rel:tions and Public Aff+ irs
. Form I Qualifications for Integrated M:terials Pcrformance Evaluation Program (IMPEP) Team Members Handbook 5.10 Part II '
Principal Reviewer for the Scaled Source and Device Evaluation Program Indicator Limited Scope Technical Review (L)(continued)
Core Training (2)
The following courses establish minimum formal classroom training requirements for all IMPEP team members completing a limited scope technical review as principal reviewer for the non-common performance indicator, SS&D evaluation program.
- Sealed Source and Device Workshop (a)
. Applied Health Physics (H-109) or Health Physics Technology Course (H-201) (b)
Supplemental Training (3)
The following courses provide additional training beyond that identified as self-study and core training. This training will be determined by the individual's supervisor and will depend on the individual's previous education and work experience.
. Diagnostic and Therapeutic Nuclear Medicine Course (H-304)(a) e Safety Aspects of Industrial Radiography Course (H-305) (b)
- Teletherapy and Brachytherapy Course (H-313) (c) e Safety Aspects of Well Logging Course (H-314) (d) e Root Cause/ Incident Investigation Workshop (G-205) (e)
Refresher Training (4) l Refresher training will include IMPEP Training a minimum of once i every 2 years and other courses as determined by management. ;
9l 26 Appcoved: January 5,1999
Volume 5, Governmcntal Relations and Public Affairs i
Form I Qu:lifications for Integrated Materials Performance Evaluation
, Program (IMPEP) Team Members en i4 Handbook 5.10 Part II l
V i Principal Reviewer for the Scaled !
Source and Device Evaluation ,
Program Indicator Limited l Scope Technical Review (L)(continued)
Professional Experience (5)
The minimum amount of work experience required for all IMPEP team members completing a limited scope technical review as principal !
reviewer for the non-common performance indicator, SS&D evaluation program, is 5 years experience with a radioactive materials program (including knowledge in health physics and mechanics along with the technical ability to discern the safety significance of product ,
integrity issues) before and within 10 years of participating in IMPEP.
Principal Reviewer for the Low-Level Radioactive Waste Disposal Program O J Indicator (M)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team members completing a technical review as principal reviewer for the non-common performance indicator, low-level radioactive waste (LLRW) disposal program. l l
Self Study (1)
- NUREG-1199, " Standard Format & Content of a License Applications for a Low-Level Radioactive Waste Disposal ;
Facility"(a) ;
e NUREG-1200," Standard Review Plan for the Review of a License Application for a Low-Level Radioactive Waste Disposal j Facility"(b) l
. . NUREG-1274," Review Process for Low-Level Radioactive Waste Disposal License Applications Under Low-Level Radioactive Waste Policy Amendments Act"(c)
O e NRC Inspection Manual Chapter 2401,"Near Surface Low-Level l
l] Radioactive Waste Disposal Facility Evaluation Program"(d)
Approved: January 5,1999 27
V:lume 5, Governmentcl Rel:tions cod Public Affairs
.Ferm:1 Quxlificati::ns for Integrated M terials Performance Evaluation
- Program (IMPEP) Team Members Handbook 5.10 Part II Principal Reviewer for the Low-Level ~
Radioactive Waste Disposal Program Indicator (M)(continued)
Self-Study (1) (continued) ,
e Draft Branch Technical Position," Low-Level Rafoactive Waste I Performance Assessment"(e) 10 CFR Part 61 (f)
Core Training (2)
The course, IMPEP Training, establishes the minimum formal classroom training requirements for all IMPEP team members completing a full technical review as principal reviewer for the non-common performance indicator, LLRW disposal program.
Supplemental Training (3)
The following course provides additional training beyond that intified as self-study and core training will be determined by the individual's supervisor and will depend on the individual's previous education and work experience.
- Root Cause/ Incident Investigation Workshop (G-205)
Refresher Training (4)
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
Professional Experience (5)
Minimum amount of work experience required for all IMPEP team members completing a full technical review as principal reviewer for the non-common performance indicator, LLRW disposal program, is 2 .
years experience working as an inspector, license reviewer, or as a developer of regulatory programs for ensuring safety of LLRW disposal before and within 5 years of participating in IMPEP.
28 Approved: January 5,1999
. Volume 5, Governmental Relations and Public Affairs Form:1 Qualifications for Integrated M:terials Performance Evaluation
, Program (IMPEP) Team Members IIandbook 5.10 Part II v
e Principal Reviewer for the Uranium Recovery Program Indicator (N)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all Ih1 PEP team members completing a technical review as principal reviewer for the non-common performance indicator, uranium recovery program.
Self Study (1) ,
e 10 CFR Part 40, Appendix A (a) e NUREG-1569," Standard Review Plan for In Situ Leach Uranium Extraction License Applications"(b) e NUREG-1620, " Standard Review Plan for the Review of a Reclamation Plan for Mill Tailings Sites Under Title II of the p)
Uranium Mill Tailings Radiation Control Act"(c)
- NRC Inspection Manual Chapter 2801, " Uranium Mill and 11e.(2)
Byproduct Material Disposal Site and Facility Inspection Program"(d)
, e NRC Inspection Manual Chapter 2641, "In-Situ Leach Facility Inspection Program"(e) l Core Training (2) l I
The course, IMPEP Training, establishes the minimum formal classroom training requirements for all IMPEP team members l completing a full technical review as principal reviewer for the non-common performance indicator, uranium recovery program. I Supplemental Training (3)
. The fallowing course provides additional training beyond that identified as self-study and core training will be determined by the individual's supervisor and will depend on the individual's previous 4 -
education and work experience.
r (A)u e Root Cause/ Incident Investigation Workshop (G-205)
I i
l Approved: January 5,1999 29
1 l
Volume 5, Governmental Relations and Public Affairs
.Formni Qualifications for I.ntegrated Materials Performance Evaluation
']
Program (IMPEP) Team Members *i Handbook 5.10 Part II Principal Reviewer for the Uranium '
Recovery Program Indicator (N)(continued)
Refresher Training (4)
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
Professional Experience (5)
The minimum amount of work experience required for all IMPEP team members completing a full technical review as principal reviewer for the non-common performance indicator, uranium recovery program, is 2 years experience working as an inspecter, license reviewer, or as a developer of regulatory programs for ensuring safety of uranium recovery operations before and within 5 years of participating in IMPEP.
Principal Reviewer for Fuel Cycle Inspection Program Indicator (o) g Qualifications (1)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team members acting as principal reviewer for the non-common performance indicator, fuel cycle inspection program. (a)
An IMPEP team member who is journal qualified as a fuel cycle inspector or license reviewer under NRC Inspection Manual Chapter 1246, " Formal Qualification Programs in the Nuclear Materials Safety and Safeguards Program Area,"is by definition qualified to act as principal resiewer for this indicator. (b)
Self-Study (2)
None, in addition to those courses identified in Section (B)(1) of this .
part.
O i
l 30 Approved: January 5,1999 l
)
Volume 5, Governmental Relations and Public Affairs Formel Qudifications for Integrated Meterials Performance Evaluation Program (IMPEP) Team Members l
Handbook 5.10 Part II
(')N L
i Principal Reviewer for Fuel Cycle !
Inspection Program Indicator (o)(continued)
Core Training (3)
The course, IMPEP Training, establishes the minimum formal classroom training requirement for all IMPEP team members acting as principal reviewer for the non-common performance indicator, fuel cycle inspection program.
. l Supplemental Training (4) l The following course provides additional training beyond that identified as self-study and core training. This training will be I determined by the individual's supervisor and will depend on the individual's previous work experience and education.
- Root Cause/ Incident Investigation Workshop (G-205)
(
(),) Refresher'Iraining (5)
Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
Professional Experience (6)
, The minimum amount of work experience directly related to fuel cycles required for all IMPEP team members acting as principal reviewer for the non-common performance indicator, fuel cycle inspection program,is 2 years experience with a radioactive materials program (including Agreement State program, fuel cycle, radioactive waste, or l SS&D evaluation) before and within 5 years of participating in IMPEP.
Principal Reviewer for Site Decommissioning l Management Plan Indicator (P)
, Along with the qualifications outlined in Sections (A) and -(B) of this part, the training described below is required for all IMPEP team members acting as principal reviewer for the non-common
. . performance indicator, site decommissioning management plan.
O I }
\J
?
Approved: January 5,1999 31
Volume 5, Governmental Relations and Public Affairs
.Ftrm:1 Qualifications f:r Integrated Materials Pcrformance Evaluation '
Program (IMPEP) Team Members Handbook 5.10 Part II Principal Reviewer for Site Decommissioning Management Plan Indicator (P)(continued)
~
Self-Study (1) e Code of Federal Regulations described in NRC Inspection Manual Chapter 1246, Appendix X," Qualification Guide 2"(a) e Regulatory Guidance described in NRC Inspection Manual Chapter 1246, Appendix X, " Qualification Guide" 4 (b)
- NRC Inspection Manual Chapter 2605, " Decommissioning Procedures for Fuel Cycle and Materials Licensees," and NMSS Handbook for Decommissioning Fuel Cycle and Materials Licenses (c)
Core Training (2) l The following courses establish minimum formal classroom training requirements for all IMPEP team members acting as principal reviewer for the non-common performance indicator, site decommissioning management plan.
- One of the following:(a)
- Site Access Training (H-100)(i) !
l - NMSS Radiation Worker Training (H-102) (ii)
- Introduction to Health Physics (H-117) (iii)
- Health Physics Technology (H-201) (iv) e Licensing Practices and Procedures (G-109) (b)
Suppo nental11 raining (3)
The folawing course provides additional training beyond that '
identified as self-study and core training. This training will be determined by the individual's supervisor and will depend on the individual's previous work experience and education. ;
- Root Cause/ Incident Investigation Workshop (G-205) i l
32 Approved: January 5,1999
i l . Volume 5, Govcrnmental Relations and Public Affairs !
Formal Qualifications for Integrated Materials Performance Evaluation i
. Program (IMPEP) Team Members Handbook 5.10 Part II
(]'
i Q
,4 Principal Reviewer for Site Decommissioning Management Plan Indicator (P)(continued) l Refresher Training (4) I Refresher training will include IMPEP Training a minimum of once every 2 years and other courses as determined by management.
Professional Experience (5)
The minimum amount of work experience directly related to l decommissioning required for all IMPEP team members acting as principal reviewer for the non-common performance indicator, site j decommissioning management plan, is 2 years experience with a ,
i radioactive materials program (including Agreement State program, l fuel cycle, radioactive waste, or SS&D evaluation) before and withm !
5 years of participating in IMPEP.
l Training Requirements for IMPEP l
(O .J Team Leader (o)
Along with the qualifications outlined in Sections (A) and (B) of this part, the training described below is required for all IMPEP team l leaders.
Self-Study (1) e NRC Inspection Manual Chapters 1220, " Processing of NRC Form 241," Report of Proposed Activities in Non-agreement States, and inspection of Agreement State licensees operating under 10 CFR 150.20 (a)
- NRC Inspection Manual Chapter 1246, " Formal Qualification Programs in the Nuclear Material Safety and Safeguards Program l
Area" (b) i e NRC Inspection Manual Chapter 2800, " Materials Inspection Program" (c)
- e NRC Management Directive 8.8," Management of Allegations"(d)
(q
/
V Approved: January 5,1999 33
g Volume 5, Governmental Rcir.tlons and Public Affairs formal Qualifications for Integrated Materi:Is Performance Evaluation Program (IMPEP) Team Members Handbook 5.10 Part II
'lYaining Requirements for IMPEP '
Team Leader (o)(continued)
Core haining (2)
The following courses establish minimum formal classroom training requirements for all IMPEP team leaders.
. Fundamentals of Inspection Course (G-101) or Inspection Procedures Course (G-103) (a)
- Licensing Practices and Procedures (G-109) (b)
- Inspection for Performance-Materials Version (G-304) (c) e Applied Health Physics (H-109) or Health Physics Technology Course (H-201)(d) e Leading NRC Work Teams (Professional Development Center
[ PDC])(e)
Supplemental Training (3)
The following courses provide additional training beyond that identified as self-study and core training. This training will be determined by the individual's supervisor and will depend on the individual's previous work experience and education.
- Root Cause/ Incident Investigation Workshop (G-205) (a)
- Diagnostic and Therapeutic Nuclear Medicine (H-304)(b) e Safety Aspects ofIndustrial Radiography (H-305)(c) e Transportation of Radioactive Materials (H-308) (d) e Teletherapy and Brachytherapy (H-313) (e) b e Safety Aspects of Well Logging (H-314) (f)
- Irradiator Technology (H-315) (g) e Managing Other People's Writing (PDC) (h) 34 Approved: January 5,1999
. Volume 5, Governmental Relations and Public Affairs Formal Qualifications for Integrated Materials Performance Evaluation
, Program (IMPEP) Team Members A Handbook 5.10 Part II V
Training Requirements for IMPEP ,
Team Leader (o)(continued)
Supplemental Training (3) (continued) !
e Situational Leadership (PDC) (i) )
- Effective Communications for NRC Inspectors (OP) (j) e -
IMPEP Team Leader Course (k)
Refresher Training (4)
Refresher training will include the IMPEP Team Leader Course and other courses as determined by management.
1 Professional Experience (5) 1 Professional experience will include-
%J e Minimum amount of work experience required for all IMPEP team leaders (a) !
+ 5 years of experience with a radiation materials program before and within 10 years of participating in IMPEP (b)
- Qualified to act as principal reviewer for at least one performance indicator (c)
- Participation in one IMPEP review as a principal reviewer for any indicator (d)
. A first-time leader shall have an experienced qualified team leader as a member of the IMPEP team (e)
,v Approved: January 5,1% )) 35