NORTH ANNA POWER STATION MONTHLY OPERATING REPORT

'l MONTH APRIL YEAR 1986 i

APPROVED:

i mJ j_,..

STATION MANAG f

4 860430

[6 p

R K 00000338 L.

,/

PDR

?

-l { {

s

OPERATING DATA REPORT DOCKET NO.-50-338 DATE 05-01-86 COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 OPERATING STATUS 1.

. Unit Name:

North Anna 1-2.

~ Reporting Period:

April, 1986 3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating (Gross NWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

941

'7.

Maximum Dependable Capacity (Net MW'e):

893 8.

If Changes Occur in Capacity Ratings (Items No. 3,thru 7) Since Last Report, Give Reasons:

j N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative i

11.

Hours In Reporting Period 719 2879 68,867 4

12.

Number of Hours Reactor Was Critical 719 2435.1 47,745.6 13.

Reactor Reserve Shutdown Hours

'719 2383 46,318.8-0 443.9 5,349.3 5

14.

Hours Generator On-Line 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 1,991,093 6,426,132 121,398,680 17.

Gross Electrical Energy Generated (MWH) 670,265-2,164,935 39,642,565-18.

Net Electrical Energy Generated (MWH) 637,073 2,056,168 37,471,116 19.

Unit Service Factor 100 82.8 67.3 20.

Unit Availability Factor 100 82.8 67.3 21.

Unit Capacity Factor (Using MDC Net) 99.2 80.0 61.5 22.

Unit Capacity Factor.(Using DER Net) 98.1 78.7 59.9 23.

Unit Forced Outage Rate 0

-17.0 12.5 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date,'and Duration of Each):

~

25.

If Shut Down At End Of Report Period, Estimated Date of Startupf' 26.

Units In Test Status (Prior to Commercial Operation):

i i-Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-a-

s

[

OPERATING DATA REPORT DOCKET NO.

50-339 DATE 05-01-86 COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 OPERATING STATUS 1.

Unit Name:

North Anna 2 2.

-Reporting Period:

April, 1986 3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating'(Gross MWe):

947

' 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

941 7.

. Maximum Dependable Capacity (Net MWe):

893 i

. 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A 4

l t

a This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 719 2879-47,135 12.

Number of Hours Reactor Was Critical 585.9 1800.5 36,125.3 13.

Reactor Reserve Shutdown Hours 133.1 1078.5 5,259.6 14.

Hours Generator On-Line 532.1 1746.4 35,406.4 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 1,072,787 4,269,316 91,414.716 17.

Gross Electrical Energy Generated (MWH) 350,448 1,420,115 30,300,297 l

18.

Net Electrical Energy Generated (MWH) 328,413 1,343,892 28,726,741 19.

Unit Service Factor 74.0 60.7 75.1 20.

Unit Availability Factor 74.0 60.7 75.1__

21.

Unit Capacity Factor (Using NDC Net) 51.1 52.3 68.6 22.

Unit Capacity Factor (Using DER Net) 23.

Unit Forced Outage Rate 50.4 51.5 67.2 18.2 6.3 11.3 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i 1

1

- 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

April'2, 1986

. 26.

Units In Test-Status (Prior to Commercial Operation):

Forecast

-Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9

4 m

-AVERAGE DAILY. UNIT POWER LEVEL DOCKET NO.

50-338 UNIT NA-1 DATE 05-01-86 COMPLETED BY Brenda Garner TELEPHONE 703-894-5151X2527 MONTH April, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

-1 883 17 888 2

883 18 889 3

885 19 890 4

883 20 890 5

883 21 890 6

S84 22 886 7

886 23 889 8

893 24 889 9

897 25 890 10 897 26 883 11 887 27 853 12 886 28 890 13 884 29 891 14 846 30 888 15 875 31 16 887 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute ta the nearest whole megawatt.

4 Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS I

EXPLANATION SHEET DOCKET.NO. 338 REPORT MONTH APRIL-

-UNIT NAME NA-1 L

YEAR 1986 DATE 05-01-86 i

COMPLETED BY Brenda Garner NO ENTRY THIS MONTH A

+

t e

i f

I e

1 5

9 4

e 1

4 2.

~_ _. _ - - - -. _ _.

i s

UNIT SHUTDOWNS AND POWER REl;UCTIONS DOCKET NO.

50-338 i

UNIT NAME

-North Anna 1 DATE

'05-01-86 REPORT. MONTH APRIL, 1986 COMPLE'IED BY Brenda Garner-TELEPHONE (703) 894-5151 X2527 1

2 No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting ven de Cod Acdon to 3

4 5

Down Reactor Report #

Prevent Recurrence

'86-04 850411 S

NA H

5 NA NA NA Commenced rampdown to 61% power to repair generator lead cooling fan. Repairs were completed and Unit returned to 100%

power.

4 i

l 1

2 3

4

' F: Forced Reason:

Method:

Exhibit F - Instructions S: Scheduled A-Equipment. Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry. Sheets for Licensee

-C-Refueling 3-Automatic Scram Event Report (LER) File i

D-Regulatory Restriction 4-Continuations (NUREG-0161) i E-Operator Training & License Examination. 5-Load Reduction

'F-Administrative 9-Other G-Operational' Error (Explain) 5 i

H-Other (Explain)

Exhibit H - Same Source

~

't

. _ ~

4 NORTH ANNA POWER STATION t

I UNIT NO.

1 MONTH APRIL-

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of opn.ating experiences for this month which' required load reductions en: resulted in

^

significant non-load related incit."nts.

DATE TIME DATA-April 1, 1986 0000 Began this month with Unit at 940 MW -

100% power.

April 14, 1986 1939 Com enced rampdown of-25% power to repair a generator lead cooling fan.

2149 Unit holding at 702 MW - 75% power, for

. repairing generator lead cooling fan.

2213 Commenced rampdown of additional 15% power for repairing generator lead cooling fan.

2242 Unit holding at 578 MW - 61% power to repair generator lead cooling fan.

l 2254 Commenced. ramp up to 100%' power, generator lead cooling fan repairs completed.

April 15, 1986 0110

. Unit holding at 870 MW - 90%' power for 1-PT-24 calorimetric.

0138 Commenced ramp-up to 100%, 1-PT-24 calori-t metric completed.

0230 Unit stabilized at 932 MW - 100% power.

1 j.

April 26, 1986 0030 Commenced rampdown of 75 MW for Turbine l

Valve Freedom Test.

G113 Unit holding at,860 MW - 87% power for d'

Turbine Valve Freedom Test'.

i j-0202 Commenced ramp up to 100% power.

0315

. Unit stabilized at '935 MW - 100% power, Turbine Valve Freedom Test completed.

J m-m

...-..m

NORTH ANNA POWER STATION UNIT NO.

1 MONTH APRIL

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for.this month which required load reductions or resulted in significant non-load related incidents.

DATE TIME DATA April 30, 1986 2400 Ended this month with Unit at 940 MW -

100% power.

2

n

'.o t

+

AVERAGE DAILY UNIT POWER LEVEL i

{

DOCKET NO.,

50-339 UNIT NA-2 DATE

'05-01-86 COMPLETED BY Brenda Garner i

i i

TELEPHONE 703-894-5151X2527 MONTH APRIL, 1986 1

DAY

' AVERAGE DAILY POWER LEVEL DAY-AVERAGE DAILY-POWER LEVEL 1

.(MWe-Net)

(MWe-Net)

+

1 0

17 208 2

0 18 595 1

3 97 19 858 4

204 20 888 5

124 21 888 i

+

6 220 22 884 7

394 23 883 8

379 24 884 9

376 25 885 10 484 26 884 J

11 43 27-842 12 0

28 886 j

13 0

29 889 4

14 0

30 889 15 0

31 16 0

1-INSTRUCTIONS On this format, list the average' daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

i 1

Page 1

of 1

UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO.

50-339

-REPORT MONTH April UNIT NAME NA-2 YEAR 1986 DATE 05-01-86 COMPLETED BY Brenda Garner 86-02 (1)

Continuation from February 1986 and March 1986, when the Unit was.taken off line for a

Refueling Cutage.

Refueling was complete' and the Unit returned on line April 3, 1986 at 1057.

86-03 (2)

April 5,1986, Unit was holding at 215 MW-27% p >wer for Chemistry when commenced rampdown to 0% power for Turbine Overspeed Trip Test.

Unit came off line on April 5, 1986 at 0517.

Turbine-Overspeed Trip Test - was cost,pleted and Unit returned on line April 5, 1986 at 1458.

86-04 (3)

April 11, 1986, at 0144, Reactor Trip occurred while Unit was holding at '. 633 MW-70% power for Flux Mapping.

Reactor Trip was due to Main Electrical Generator PMG exciter failure.

Reactor was critical on April 15, 1986 at 2039.

Approximately seven hours after reactor became critical, the reactor tripped due to TV-GV transfer performed while in operator auto mode of turbine control.

April 16, 1986 at 0618, the Reactor was critical.

Approximately twelve hours later the reactor was shutdown due to low = specific gravity in 2-III battery.

April 16,.1986 at - 2130 the reactor was critical.

April 16, 1486 at 2359, the Unit came on line.

l

_._.__m.,

m _ _ _ _

t UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-339 l

UNIT NAME.

North Anna 2 DATE 05-01-86

-REPORT MONTH APRIL COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting

  • 4 5

de Action to 3

Down Reactor Report #

Prevent Recurrence t

86-02 860401 S

58.9 C

4 LER N2-86-02 NA NA Continuation from February l

and March 1986, when Unit was l

taken off line for a Refueling l

Outage. Refueling was completed-and Unit returned on line April 3, 1986.

j j.

86-03 860405 S

9.7 B

1 NA NA NA April 5, 1986 at 0517, Unit 3

was taken off line to perform 1

Turbine Overspeed Trip Test.

Test was completed and Unit-returned on line April 5, 1986 at 1458.

I 2

3 4

F: Forced.

Reason:

Method:

Exhibit F'- Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 l

H-Other (Explain)

Exhibit H - Same Source r

e r.

q UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-339 UNIT NAME North Anna 2 DATE 05-01-86 REPORT MONTH APRIL COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 l

No.

Date Type Duration-Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting 3

  • 4 d' 5 Action to Down Reactor Report #

Prevent Recurrence 86-04 860411 F

118.3 A

3 LER N2-86-08 NA NA Reactor trip occurred at 70%

power due to Main Electrical Generator PMG exciter failure.

A 3

LER N2-86-07 NA NA Reactor trip due to TV-GV transfer performed while in operator auto mode of Turbine control.

A 1

LER N2-86-06 NA NA Reactor shutdown due to low specific gravity in 2-III. battery.

Unit returned on line April 16, 1986 at 2359.

I 2

3 4

F: Forced Reason:

Method:

Exhibit F - Instructions S:-Scheduled A-Equipment Failure (Explain)'

1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets-for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction

'4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error-(Explain) 5 H-Other (Explain)

Exhibit H - Same Source O

e i

NORTH ANNA POWER STATION UNIT NO.

2 MONTH APRIL

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or. resulted in significant non-load related incidents.

DATE TIME DATA April 1, 1986 0000 Began this month with Unit in Mode 3, continuation from February and March Refueling Outage.

April 1, 1986 1117 Reactor critical April 3, 1986 1057 Unit on line.

1212 Unit holding at 215 MW - 27% power for Chemistry.

April 5, 1986 0410 Commenced rampdown to 0% power to perform Turbine Overspeed Trip Test.

0517 Unit off line 1458 Unit on line 1635 Unit holding at 260 MW - 30% power for Chemistry April 6, 1986 2235 Commenced ramp up to_100% power April 7, 1986 0400 Unit holding at 445 MW.- 50% power, for Flux Mapping.

0800 Unit holding at 445 MW - 50% power for Chemistry, Flux Mapping completed.

April 10, 1986 0847 Commenced ramp up to 100% power.

1420 Unit holding at 633 MW - 70% power, for Flux Ma,. ping April 11, 1986 0144 Reactor trip occurred at 70% power, due to Main Electrical Generator, PMG exciter failure I

e NORTH ANNA POWER STATION UNIT NO.

2 MONTH APRIL

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

DATE TIME DATA April 15, 1986 2039 Reactor critical April 16, 1986 0227 Reactor tripped due to TV-GV transfer performed while in operator auto mode of turbine control.

0618 Reactor critical 1825 Reactor shutdown due to low specific gravity in 2-III battery.

2130 Reactor critical.

2359 Unit on line April 17, 1986 0047 Unit holding at 250 MW - 30% power for Chemistry.

April 18, 1986 0055 Commenced ramp up to 100% Power.

1715 Unit holding at 848 MW - 90% power for 2-PT-24 calorimetric 1800 Commenced ramp up to 100% power, 2-PT-24 calorimetric complete 1900 Unit holding at 850 MW - 91% power for Flux Mapping April 19, 1986 0000 Unit holding at 848 MW - 90% power for Chemistry - Flux Mapping completed 0400 Commenced ramp up to 100% power 0950 Unit stabilized at 945 MW - 100% power 2

NORTH ANNA POWER STATION UNIT NO.

2 MONTH APRIL

SUMMARY

OF OPERATING EXPERIENCE t

Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in 4

significant non-load related incidents.

DATE TIME DATA April 27, 1986 0003 Conunenced rampdown of 80 MW for Turbine Valve Freedom Test 0043 Unit holding at 860 MW - 87% power for Turbine Valve Freedom Test 0122

. Conumenced ramp up to 100% power 0400 Unit stabilized at 940 MW - 100% power Turbine Valve Freedom Test completed 1

April 30, 1986 2400 Ended this month with Unit at 935 MW -

100% power.

i i

i 5

i 3

4

0 0

0 VIHOINIA ELECTRIC AND POWEH COSII%NY RIcIIxoNn, VINGINIA 2 0061 W.L.sinwant Vaca PummunamT scunia o,..ino.

May 15, 1986 Mr. Ronald M. Scroggins, Director Serial No.86-308 Office of Resource Management N0/DJV:acm U.S. Nuclear Regulatory Comnission Docket N 4.

50-338 Washington, D. C. 20555 50-339 License Nos. NPF-4 NPF-7

Dear Mr. Scroggins:

VIRGINIA ELECTRIC ANL POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Unit Nos. I and 2 for the month of April, 1986.

Very truly yours, LYkWh W. L. Stewart Enclosure (3 copies) cc:

Mr. James M. Taylor, Director (12 copies)

Office of Inspection and Enforcement Dr. J. Nelson Grace (1 copy)

Regional Administrator Region II NRC Senior Resident Inspector North Anna Power Station

$g,7Y

,p