ML20203D690

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-321/OL-86-01 of Exams Administered on 860217-20.One Item of Performance Identified as Requiring Inspector Followup.For All Examined Individuals,Util Will Provide in-depth Training on SPDS
ML20203D690
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/15/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20203D695 List:
References
NUDOCS 8604220294
Download: ML20203D690 (2)


Text

N L Urw April 15, 1986 Georgia Power Company ,

ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

HATCH EXAMINATION REPORT 321/0L-86-01 The NRC administered examinations on February 17-20, 1986, to employees of your company who had applied for licenses -to operate the Edwin I. Hatch Nuclear Plant.

Additionally, examinations were administered to employees of your company who currently hold licenses to operate the Edwin I. Hatch Plant. At the conclusion of the written examination, a copy of the exam was left with your staff; at the

' conclusion of the site visit, preliminary findings on the operating examinations were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Encicsure 2.

Copies of the written examination questions and answer key are included in this report as Enclosure 3. Utility convrents on the written examination are included

'as Enclosure 4.

As a result of the examination process, one item of performance was identified as requiring inspector followup. For all examined individuals, Georgia Power Company will provide in-depth training on the Safety Parameter Display System (SPDS) prior to declaring all requirements concerning said system as completed.

This will be carried as Inspector Followup Item OL-61-01.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1, 3 and 4 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by VLBrownlee)

Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosures:

(See page 2) 94 860415 gp2gCK05000321 V

PDR I, jf VL/

- - . . _ . . . . -= . _ . - . . . . . .

l 47 l Georgia Power Company 2- April 15, 1986 l

Enclosures:

I 1. Examination Report 50-321/0L-86-01 L 2. Table of Examination Results (Official Use Only-Privacy l ActInformation)

3. R0/SR0 Exam Questions and j Answer Key ,
4. Utility Comments to Exam cc w/encls. 1, 2'& 4:

J. P. O'Reilly, Corporate Director of Nuclear Power E. M. Howard, Corporate Training Director H. Nix, Plant Manager L cc w/encls. 1, 2, 3 & 4:

L C. T. Moore, Site Training Director bec w/encls. 1, 2, 3 & 4: .

Senior Resident Inspector bec w/ encl. 1 & 4:

Project Manager, NRR -

l State of Georgia l l bec w/ encl. 2:

J. Lanning, Managenent Assistant, OLB:DHFT:NRR bec w/encls. 1, 3 & 4:

, Operator Licensing Branch, DHFT:NRR l Document Control Desk i -. G.- Sly, PNL l M. Spencer, EG&G i J. Hanek, EG&G RII RII RII RIT RII

.db KLTrockman

$6 LoJF,Munro GW CAJu>lian thson h

VLBrownlee 03/ $//86 ((M/ /86 VI 04 Of/fI/86 "lp, '///86 03/15'/86 81 1 4)d 4//9/ft

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _