ML20203D448

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/86-16 & 50-368/86-16 on 860519-23 & Notice of Violation
ML20203D448
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/16/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20203D454 List:
References
NUDOCS 8607210219
Download: ML20203D448 (2)


See also: IR 05000313/1986016

Text

C

Jut l BIN

In Reply Refer To:

Dockets: 50-313/86-16

50-368/86-16

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations P. O. Box 551

Little Rock, Arkansas 72203

,

Gentlemen:

This refers to the inspection conducted by Mr. H. D. Chaney of this office

during the period May 19-23,'1906, of activities authorized by NRC Operating

Licenses DRP-51 and NPF-6 fcr Arkansas Nuclear One, Units 1 and 2, and to the

discussion of our findings with Mr. J. M. Levine, and other members of your

j staff at the conclusion of the inspection.

Areas examined during the inspection included portions of the Radiation

'

, ' Protection Program. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspector. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

i violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing,-in accordance with the provisions of Section 2.201

-

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

i Regulations. Your response should be based on the specifics contained in the

J Notice of Violation enclosed with this letter.

) The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

72 9 8Qtigpnal Signeo Dh:"

$[O 13

G

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures: (see next age) i

'

RIV:FRPS C:FRPS D: S C. B C: RPB :

HDChaney)cg Murra RLBa gart DRH'unter JEGagliA o

htp/86 g/o /86 q/4/86 1/,5/p

g/86

ly th

. . . .. .-

. _ _ .

,

4  %

_ . .

, .

~. .  !

,

Arkansas Power'& Light Company -2-

-

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-313/86-16

'50-368/86-16 with attachment

cc:

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P. D. Box 608 t

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bcc.to DMB (IE06)

bec distrib, by RIV:

  • RPB * Resident Inspector R. D. Martin, RA
  • R&SPB *Section Chief (RPB/B) *D. Weiss, LFMB (AR-2015)
  • RIV File DRSP *RSB-
  • MIS SYSTEM *RSTS Operator
  • H. D. Ctaney *B. Murray R. L. Bangart
  • w/766

l

,

E

1 *

n 4

m.