Similar Documents at Zion |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARA99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 A97036, Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2 ML20217M4151997-07-31031 July 1997 Corrected Page to Monthly Operating Rept for Jul 1997 for Zion Generating Station,Unit 1 A97027, Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 2 ML20148L5771997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Zion Generating Station,Units 1 & 2 ML20141D8601997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Zion Station Units 1 & 2 ML20217M4011997-03-31031 March 1997 Corrected Page to Monthly Operating Rept for March 1996 for Zion Generating Station,Unit 1 ML20137Y1491997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Zion Unit 1 ML20136J5091997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Zion,Units 1 & 2 ML20135A5311997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Zion Station Units 1 & 2 ML20133M1891996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Zion Generating Station Units 1 & 2 ML20132D7401996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Zion Generating Station Units 1 & 2 ML20134K7121996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Zion Generating Station Units 1 & 2 ML20134K7531996-09-30030 September 1996 Corrected Monthly Operating Repts for Sept 1996 for Zion,Units 1 & 2 ML20129B3711996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Zion Generating Station ML20134K7491996-08-31031 August 1996 Corrected Monthly Operating Repts for Aug 1996 for Zion,Units 1 & 2 ML20217M4071996-04-30030 April 1996 Corrected Page to Monthly Operating Rept for Apr 1996 for Zion Generating Station,Unit 1 ML20149K2411996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Zion Unit 1 ML20149G2851994-09-30030 September 1994 Monthly Operating Repts for Sept 1994 for Zion Generating Station ML20058K2281993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Zion Generating Station ML20058K2341993-10-31031 October 1993 Corrected Monthly Operating Rept for Oct 1993 for Zion Unit 2 ML20059K0731993-10-31031 October 1993 Monthly Operating Repts for Oct 1993 for Zion Generating Station Units 1 & 2 ML20058P1631993-09-30030 September 1993 Monthly Operating Repts for Sept 1993 for Zion,Units 1 & 2 ML20057B6921993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for Zion,Unit 1 ML20056D6881993-07-31031 July 1993 Monthly Operating Repts for Jul 1993 for Zion Generating Station,Units 1 & 2 ML20128K6951993-01-31031 January 1993 Monthly Operating Repts for Jan 1993 for Zion,Units 1 & 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98049, Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 21998-09-25025 September 1998 Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 2 ML20195D1221998-08-31031 August 1998 DSAR, for Zion Station A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 ML20236J7911998-06-12012 June 1998 LER 98-S02-00:on 980517,first Shift Security Officer Reported Being Wounded by Unknown Subject Who Fled Area. Caused by accidental,self-inflicted Gunshot Wound.Removed Officer from Duty & Charged Officer W/Filing False Rept A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 A98034, 1997 Annual 10CFR50.59 Summary Rept1997-12-31031 December 1997 1997 Annual 10CFR50.59 Summary Rept ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 ML20202F1451997-12-0303 December 1997 Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 ML20199J5931997-11-26026 November 1997 SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14) A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event1997-11-13013 November 1997 Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 ML20211M0181997-10-0707 October 1997 Special Rept 295-123-97-001SR:on 970904,OA Motor Declared Inoperable Due to Pin Hole Leaks Identified on Pressure Regulating Relief valve,0FP0052.Procedure Was Rewritten to Ensure 0FP0052 Would Maintain Same Pressure When Fully Open A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual 1999-09-30
[Table view] |
Text
....._ _ _. ..
OPERATING DATA REPORT DOCKET NO. SO- M DATE MNN COMPLETED BY (1 Ar/5ho TELEPHONE '7 V6-Ja#
1 OPERATING STATUS 7 M OA/g Notes
- 1. Unit Name: ^ /h s 2. Reporting Perbi #6 dao/ oct2D 74 Rd.o3 3/ .25/66
- 3. Licensed Thenmal Power (MWt): 3MO h 4. ."- ;' ^r Rating (Grose MWe):
/OD L 5. Deelen Electrial Rating (Net MWe): /NO '
4 6. Maxineum fk, "E Capacity (Grose MWe): / ohs c 7. Maximens DependeMe Capacity (Net MWe): /0 VO
- 8. If Cheeses Occurin Capacity h (Iteme Nuanber 3 Tluough 7) Slace Last Report, Give Reesons:
, 9. Power Level To Which Restricted. lf Any (Net ):
U
- 10. Rees no For Restrictions.If Any: A L
F f This Month Yr. to Dete Cumuletive b II. Hours la Reporting Period 7NO 1O'O /N .b 5 12. Number Of Hours Reactor Wes C7ttical 4>RO.5 A O Slo. S 75 762,2_
b 13. Reactor Reserve sketdown Houre OO O*O IS A/ 8
- 14. Houre Genretor On.Ume 597 E A7 0/ 3. W 'O h AO' O Is. Unit Reserve shutdown Heere /) . O O.O O,O
- 16. Gross Derusel Ensegy Generated (MWH) / 876 N/0 0 %3/.350 J/O OOV 0/3 g 17. Gross Electrical Energy Generstod (MWH) 4/7 822 B / / 7 9F0 47 f3A 7fV
=
a g
- 18. Not Elodrical Emergy Genersted (MWT ', d908/o/ 4 OSM d55 &l 37fMS
- 19. Unit Service Facter NO 3 93.2 0%
- 20. Unit AvelieMilty Factor VO.3 91 2 GV. 6
- 21. Unit Capacky Factor (Using MDC Net) 70 Y 90.3 M. 4
- 22. Unit Capacity Factor (Uning DER Net) 76. Y 90< 3 N.V
- 23. Unie Forced Outege Rate / ?. / 5.8 /3, 8 F 24. Shutdowns Scheduled Over Next 6 Months (Type.Dete. sad Duration of Eschi
{
AnJC 2n. Mo \S Mne_, neyt SdnedLtle(\ M ky- fdtdthi .
t E
- 25. If Shut Down At End Of Report Perbi. Estimated Date of Startup:
7 26. Units la Tat Seetus (Prior to Commercial Operstion): Forecent Achieved w
,_ INITIAL CRITICALITY r" h-INITIAL ELECTRICITY g COMMERCIAL OPERATION 8604180352 860331 PDR R ADOCK 05000295
AVERAGE DAILY UNIT POWER LEVEL I
DOCKETNO. 60446 UNIT DA1T -Ib COMPLETED BY -
TELEPHONE O'2!7d6-M MONTH Ak DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
< (MWe-Net) (MWe. Net)
! l;D D 17 b (0
'2 IOla is /o89 3 I;Da a 1, 1082 1
4 /DaI '
20 loc 90 5 196LO- 21 1 O c2 0 6 I, D 6l I 22 I084 7 IpB& n loa 7
- s. lhIA 24 /023 9 ID8& 25 / Oc23 ,
10 /NO 26 /Oc7k 11 folod 2, I OBS' 12 ~/4 :s Iodf
, 13 ~ Ik 29 /OS 14 ~l0 30 bS 15 ~! 31 G7
~
16
\
INSTRUC110NS l On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. .
(9/77) l
M M AND M N dhI 2]M/ us1rP1 DATE MWN REFORT900NW Mg[ C00ft21ED BY 6 EdIh4 TELEPHONE .3/2W6 RbW
~ 3 -
!N
- }.icensee Cause & Corrective h ] .s Iasj
.!~I l i No. Date { Ewas I L Action to
- a a py R rt . ;l ,re.ent -r.n.
I 1
$0Y h /Ybaf 3 h/F gg gf}-
i / .
k b i 1Mx!4x AQ/yAavk 9 send 1 du on sm&y Awicluaa -
dwta.
l k
1 2 3 4 F: Forced Reason: ""* d Exhibit G. Instructions 5: Scheduled A Equipment Failwe(Emplain) s.nanvat f* Pr*Paration of Dasa B.u. w = = of Test 2-Manual seras Entry Sheets for Licensee C Refueling 3-Aute serme Event Repat (LER) File (NUREG-D-Regulatory Rastriction E4perator Training & Ucense Esamination j~j'aMj' feed 0161)
,other F Adadaistrative 5
- G4perational Error (Emplain) Ext 6it 1 Same Sousse
! 19/77) Hother(Emplain)
- - - _ - _ _ - - - - _ - - _ _ _ . - - _ _ - -- - - - - - _ - -_ . - - . --e. ,~
OPERATING DATA REPORT DOCKET NO. I[} D DATE MMW COMPLETED BY
TELEPHONE 'f ' M QEERATIPiG 8TATUS
- 1. Unit Neum:
- 2. Reporthis Peted. M O,3 C/ dddo 70 66 (8 S/ JVm
- 3. Licensed Thenmal Power (MW ): 3260
- 4. Nameplete Rattes(Gross MWe): /M
- 5. Doelpi Electrieel Rating (Not MWe): NO
- 6. Manhoums W Capacity (Gross MWe): /O#6
- 7. Maakues DependeWe Capacity (Not MWe): '0Y0
- 8. If Changes Occur in Cepecity Ratings (lesme Museher 3 Thsoudi 7) Since last Report. Give Rassene:
. A/fl N
- 9. Power level To WMek Restricted,if Any#(Net pe):
- 10. Ramsese For Restrictions,If Any:
This Month Yr ee.Dete Cusseletive 3 3, m.,,, i, % ,,,,,, '74/9' o . 2 / G o. o /o4689o
- 12. Nmaher Or noure Reacter Was Cu'nical 9R91 15212 72939 7
- 13. Reester Renew stenedows Newe ded Os O A2b 1- !
- 14. Neure Geometer Om 6 'l % 7 1 A 7A. 2 7d N7F 9 l is. Unie Reserw sheodown neue 04 o.O OO
- 16. Gsees Thenmal Emesy Genesated (MWH) # MlW Eb6A ROU22'n7
- 65. 504 */N
- 17. Gseen Elecerleal Energy Genereted (MWM) 7bi'/J7 /, /M, N'/ 3
- 18. Not Ebeerleal Basey Genessted (MWM) M,'t SYl / / / 7. 3 / / 6/i 79M 753
- 19. Unit asev6es Factor 92 / IE9 70 /
- 20. Unit Avedehalty Facter 9/ / W.y 70, / '
- 21. Unit Capacky Facter (Using MDC Net) M6 9 Y9. 7 YN
- 22. Unit Capedty Factor (Ushig DER Net) #5 e'7 W7 'M,I
- 23. Umst Fen.d 0.tege Rate A2. </ /, 3 /5. (o
- 24. Sheedowns Scheduled Over Next 6 Months (Type. Dete,and Duration of Each):
- 25. If Shut Down At End Of Report Perled. Estimated Date of Startup:
- 26. Unite in Test Sentes (Prior to Comunercial Operation): Forecent Aehlewd INITIAL CRITICALITY INITIAL ELECTRICITY g fit COMMERCIAL OPERATION (4/77)
. .. - - . - - - _ - - - _ - - _ _ _ - - _ \
1 i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. O~SO UNIT k DATE Oof / b COMPLETED BY TELEPHONE 3'd!7d -SOE MON 111 80 b '
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- (MWe-Net) (MWe. Net)
- 19 iv loda 2 70 is 1 0 4 (o 3 blb 19 \O %
4 I O Yle *
. 20 l O$ $
~
5 I O N E2 21 I047 6 I O db 22 lOdB 7 1046 u 1o47 8 ION 3 24 N79 9 IOdI 25 S36 to I O 47 26 6E is lodl 27 1O46 12 IOA& 28 I Ok7
!- 13 1035' 29 I O dlo 34 103a 3a_ iO46 15 i OM 3 ,
l043 16 IDb3 .
INSTRUC110NS On this format list the average daily unit power level in MWe Net for each day in the reporting month. Compute to
. the f.earest whole megawatt.
(9/77) l l
i p
W
- 2/dM Hnd 2, g DATE OV /9' M 77 000912TED BY G Xuche REPORTMofmf TELEPHONE N2 M% SdE(/
j __
I
]- 1 N
} I}" Lkensee Crees & Corrective
(
Me. Dese j E-as Actius se
[
pj
- t i j
- . a t. e c] no- --
/ ffs638/ yah ll 5 e e o To"P'd d g x to t M
$1 taA/>at swspedGd, tolu 6 alocp
- a P&eM F sss a z a e m yk Mb M
, Q '%
h* anstdatM d ua 0
. plada faagda-I ,
j -
4 F: Forced Reason: n ahad S: Scheduled A-Eg Fallwe(Emplain) s-planual for [De a P == of Test 2-ftanual Saras Entry a for Lkeasse cd%2rys.,is. ::::*td:a- n',= r-'('s=> r'i <aunsc-E% or Training & LAsense Esassinselon 5;teducedLead
- ' 8*h*F F Adsninistrative 5 rer(Empisin) Emiehis 1 Same Source
- ppy )
MARCH-MAJOR SAFETY RELATED MAINTENANCE Equipment Work performed IC containment spray pump Replaced contactor for solenoid.
Cleaned solenoid and replaced #2 battery. Recrimped battery term.
Logged and adjusted voltage sensing set points for proper operation.
l A Residual Heat Remover Motor shaf t Heated and straightened motor shaft.
1109t c
1
. t MARCH
SUMMARY
OF OPERATING EXPERIENCE UNIT 1 The unit entered the reporting period at a power level of 1048 MWe (99%
. reactor power) ion March lith at 1543. hours. While returning to a normal line up, after performing reactor protection logic testing, a turbine trip / reactor trip occurred ~due to an improperly made up' cell switch -in the reactor trip breaker. On March 16th at 1927 hours0.0223 days <br />0.535 hours <br />0.00319 weeks <br />7.332235e-4 months <br />, the_ unit was made
. critical and on March 17th at 1755-hours the unit was synchronized to the
' grid. The unit 1remained on line the remainder of.the. report period ending at a power level of 1052 MWe (99% reactor power) and having an availability. factor of 80.3%
Unit 2
-The unit entered the reporting period at a power level of.452 MWe (47%
reactor power). Ramping down of the unit began February 28th at 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br /> for turbine overspeed test. On March 1st at 0019 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> the unit was critical and on March 2nd at 1835 hours0.0212 days <br />0.51 hours <br />0.00303 weeks <br />6.982175e-4 months <br /> the unit was' synchronized ~to the grid. 'On March 24th at lill hours, while performing reactor protection system logic testing,' the installation of the instrument power fuses-on both source range channels created electrical disturbances which caused a "High Negative Flux Rate" trip on two power ranges resulting .in a Reactor Trip. On March 25th at 0406 hours0.0047 days <br />0.113 hours <br />6.712963e-4 weeks <br />1.54483e-4 months <br /> the unit was made critical and at 1050 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.99525e-4 months <br /> the. unit was synchronized to the grid._ The unit remained on line. ;
the remainder of the report period ending at a power level of 1087 MWe (99% reactor power) and having an availability factor of 91.1% '-
1109t
I ~
REFUELING INFORMAIION REQUEST Questions: s
- 11. Name of facility.
, 2._ _ Scheduled date for next refueling shutdown.
I.
.- 3. Scheduled date for restart following refueling.
- 4. Will refueling or resumption of operation thereafter require a technical- specification change or other license amendment?
If answer is yes, what, in general, will these be?
t l If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If no such review has taken place, when is it scheduled?
- 5. Scheduled ~ date (s) for submitting proposed licensing action and
. supporting information.
- 6. Llmportant licensing considerations associated with refueling, e.g., new or dif ferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
- 9. The projected date of the last refueling that can be discharged
- to the spent fuel pool assuming the present licensed capacity.
-1109t: Page I of 3
Unit 1 - Answers
- 1. Zion Unit 1
- 2. June 26 -1986,is the scheduled date for the next refueling outage.
- 3. October 23, 1986 is the scheduled date for initial criticality following refueling.
- 4. A reload safety evaluation review took place April 1,1986 and identified no unreviewed safety questions. The onsite review is pending.
- 5. None
- 6. None
- 7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool which have been discharged by Zion f Unit 1 is 497.
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 2112 fuel assemblies. The installation of the new storage racks has been completed.
- 9. In 1995, Zion Station will lose full core discharge capability. This date is based on a December, 1983 study.
I 1
l l
l .i
('
1109t Page 2 of 3 I-i
i
[ .
l l
Unit 2 - Answers
- 1. Zion Unit 2 l
- 2. February 26, 1987 is the scheduled date for the next refueling outage.
- 3. May 14, 1987 is the approximate date for initial criticality after refueling.
1
- 4. None have yet been identified.
- 5. None
- 6. None.
- 7. The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool which have been discharged by Zion Unit 2 is 511.
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies. The installation of the new storage racks has been completed.
- 9. In 1995, Zion Station will lose full core discharge capability. This date is based on a December, 1983 study.
1 1109t Page 3 of 3
b Zion G:n:; rating Station i Shiloh Blvd. & Lake Michigan O Commonwealth Edison Zion, Illinois 60099 Telephone 312/746-2084 April 14, 1986 Director, Office of Management, Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
Enclosed please find the Operating Status Report for the month of March, 1986 for Zion Generating Station.
Sincerely yours, i
- r'<7 g G. J. iml ,
i Station Manager l Zion Station !
I GJP/GLA/gn !
Enclosures (11) cc: D. P. Galle J. G. Keppler (NRC) '
L. D. Butterfield H. E. Bliss INPO L. J. Anastasia ,
Division of Env. Health l State of Illinois J Tech Staff File {
Director, Office of Inspection and Enforcement 1
(
1 i
l
> .i I ,
} )
I
y =
l- _
April 14, 1986
\;
To: D'. P. Galle L. J. Anastasia l J.-G. Keppler Div. Of Env. Health L.'D. Butterfield' State of Illinois H. E. Bliss Director, Office of Inspection INPO 'and Enforcement This report replaces the Operating Status Report, dated April'7, 1986.
fGLA/gn cc:- Tech Staff Files f' .