ML20203A113
| ML20203A113 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/10/1986 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20203A119 | List: |
| References | |
| NUDOCS 8607170180 | |
| Download: ML20203A113 (2) | |
See also: IR 05000245/1986005
Text
F
DESIGHAIED 03IGI:nL
crtified Eyg1 - h1C ltcumu
,
JUL 101986
Docket Nos. 50-245
50-336
50-423
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P.O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject:
Inspection Report Nos. 50-245/86-05, 50-336/86-05 and 50-423/86-03
This refers to the routine inspection conducted by Mr. W. J. Madden of this
office on March 24-27, 1986 at the Millstone Nuclar Power Station of activities
authorized by NRC License No. OPR-21 and 65 and NPF-44 and to the discussions
of our findings held by Mr. Madden with Mr. R. Asafaylo and other members of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures ar.d representative
records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the violation
brought to your attention in a letter dated February 10, 1986. We have no
further questions regarding your action at this time.
Within the scope of this inspection, no violations were observed.
Sections of the enclosed inspection report contain details of your security
program that have Deen cetermined to be exempt from public disclosure in accor-
dance with 10 CFR 73.21 (Safeguards Information). Therefore, the sections so
identified in the inspection report will not be placed in the NRC Public
Document Room and will receive limited distribution. This letter and the
remaining portions of the inspection report will be placed in the Public
)
Document Room, in accordance with 10 CFR 2.790(a).
i
0FFICIAL RECORD COPY
CIR SG MILL 86-05/03 - 0001.0.0
"
~ ~~'
8607170180 860710
'
ADOCK 05000245
l
a
O
2
.
b
.
.
Northeast Nuclear Energy Company
2
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
fiaf nel Sismed 3 :
7
7:":s H. Jz.m
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure:
Combined NRC Region I Inspection Report Number 50-245/86-05;
50-336/86-05; and 50-423/86-03 (Contains Safeguards
Information (SGI) in paragraphs 12 and 20).
cc w/ enc 1 (w/o SGI):
E. J. Mroczka, Vice President, Nuclear Operations
W. D. Romberg, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (POR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspectors (w/SGI)
State of Connecticut
bec w/enci (w/o SGI):
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encl)
ORP Section Chief
M. McBride, RI, Pilgrim
P. Swetland, SRI, Haddam Neck
J. Shea, LPM, NRR
L &p .
RI:DRSS
RI
S
Madden /gcb
K imig
Jy r
6/3086
7-9-86
0FFICIAL RECORD COPY
CLR SG MILL 86-05/03 - 0001.1.0
06/27/86