ML20203A113

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/86-05,50-336/86-05 & 50-423/86-03 on 860324-27.No Violations Noted.Steps Taken to Correct Violation Noted in Also Verified
ML20203A113
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/10/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20203A119 List:
References
NUDOCS 8607170180
Download: ML20203A113 (2)


See also: IR 05000245/1986005

Text

F

DESIGHAIED 03IGI:nL

crtified Eyg1 - h1C ltcumu

,

JUL 101986

Docket Nos. 50-245

50-336

50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection Report Nos. 50-245/86-05, 50-336/86-05 and 50-423/86-03

This refers to the routine inspection conducted by Mr. W. J. Madden of this

office on March 24-27, 1986 at the Millstone Nuclar Power Station of activities

authorized by NRC License No. OPR-21 and 65 and NPF-44 and to the discussions

of our findings held by Mr. Madden with Mr. R. Asafaylo and other members of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures ar.d representative

records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the violation

brought to your attention in a letter dated February 10, 1986. We have no

further questions regarding your action at this time.

Within the scope of this inspection, no violations were observed.

Sections of the enclosed inspection report contain details of your security

program that have Deen cetermined to be exempt from public disclosure in accor-

dance with 10 CFR 73.21 (Safeguards Information). Therefore, the sections so

identified in the inspection report will not be placed in the NRC Public

Document Room and will receive limited distribution. This letter and the

remaining portions of the inspection report will be placed in the Public

)

Document Room, in accordance with 10 CFR 2.790(a).

i

0FFICIAL RECORD COPY

CIR SG MILL 86-05/03 - 0001.0.0

"

~ ~~'

8607170180 860710

'

PDR

ADOCK 05000245

l

a

O

PDR

2

.

b

.

.

Northeast Nuclear Energy Company

2

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

fiaf nel Sismed 3 :

7

7:":s H. Jz.m

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosure:

Combined NRC Region I Inspection Report Number 50-245/86-05;

50-336/86-05; and 50-423/86-03 (Contains Safeguards

Information (SGI) in paragraphs 12 and 20).

cc w/ enc 1 (w/o SGI):

E. J. Mroczka, Vice President, Nuclear Operations

W. D. Romberg, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspectors (w/SGI)

State of Connecticut

bec w/enci (w/o SGI):

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encl)

ORP Section Chief

M. McBride, RI, Pilgrim

P. Swetland, SRI, Haddam Neck

J. Shea, LPM, NRR

L &p .

RI:DRSS

RI

SS

S

Madden /gcb

K imig

Jy r

6/3086

7-9-86

0FFICIAL RECORD COPY

CLR SG MILL 86-05/03 - 0001.1.0

06/27/86