ML20202E888
| ML20202E888 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 02/11/1998 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20202E892 | List: |
| References | |
| 50-361-97-27, 50-362-97-27, NUDOCS 9802190080 | |
| Download: ML20202E888 (4) | |
See also: IR 05000361/1997027
Text
_
'
e
,
y " .,
w ra o statis
f.
5
NUCLE AR REGUL ATORY COMMISClON
.
n t C10N IV
') ***PM g
(11 HV AN PL A/ AbnlVE. 5t:11t 400
1,,
J
aft LINGTON,1 X AS H,0118%4
February 11, 1998
Haroid B. Ray, Executive Vice President
Southern Califomia Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674 0128
SUBJECT: NRC INSPECTION REPORT 50 361/97 27; 50 362/97 27 AND NOTICE OF
VIOLATION
Dear Mr. Ray:
An NRC inspection was conducted December 2'ii1997, through January 31,1998, at your
San Onofre Nuclear Generating Station. Units 2 and 3 reactor facilities. The enclosed report
presents the scope and results of that inspection.
During the 6 week period covered by this inspection, yoJr Conduct of activities at the
San Onofre facilities was generally characterized by safety conscious operation, sound
engineering snd maintenance practices, and careful radiological work controls.
One violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detailin the enclosed report. The violation involved
your failure to maintain the plant configuration of equipment in the Unit 2 containment building
in accordance with your seismic program procedures. Please note that you are required to
respond to this letter and should fotbw the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to c'etermine wh6ther
further enforcement action is necessary to ensure compliance with regulatory requirements.
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room (PDR). To
the extent possible, your response should not include any personal privacy, proprietary, or
safeguards information so that it can be placed in the PDR without redaction.
.
l
.
9902190000 990211
_
_
_
jl
ADOCK 05000361
.
0
lll l} I!ll!!,ll!!!M
,,
,
.
'
.
,
_,
Southern Cahfornia Edison Co.
2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
J
&
Det,nis F. Kirsch, Chief, Branch F
Division of Reactor Projects
Docket Nos.: 50 361
50-362-
License Nos.: NPF 10
NPF 15
Enclosures:-
2. NRC Inspection Report
50 361/97-27; 50-362/97 27
cc E/ enclosures:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, Califomia 92101-
Alan R. Watts, Esq.
Woodruff, Spradlin & Smart
701 S. Parker St._ Suite 7000
Orange, California 92868-4720
- Sherwin Harris, Resource Project Manager
Public Utilities Department
City of Riverside
3900 Main Street
Riverside, California 92522
R. W, Krieger, Vice President
Southern California Edison Com'pany
--- San Onofre Nuclear Generating Station
- P.O; Box 128
San Cicmente, California P2674-0128
_ -
_
'
...
t
(
,
Southem California Edison Co.
3-
.
. Stephen A. Woods, Senior Health Physicist
Division of Drinking Water and -
- Environmental Management
Nuclear Emergency Response Program
Califomia Department of Health Services
P.O. Box 942732, M/S 396 -
Sacramento, California. 94334 7320
Mr. Gary D. Cotton, Sr. Vice President-
Energy Supply
San Diego Gas & Electric Company -
P. O. Box 1831
"
San Diego, California 92112-4150
Mr, Steve Hsu
Radiological Health Branch
'
--State Department of Health Services -
P.O. Box 942732
1
Sacramento, Califomia 94234
-
Mayor
Citysof San Clemente -
100 Avenida Presidio
- San Clemente, Cai'omia 92672
Mr. Truman Bums \\Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
-
1
%
.- .,
,-p.
Southem California Edison Co.
-4-
E-Mail report to T. Frye (TJF)--
- E Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking Gystem (IPAS)
E-Mail report to Document Cont:ol Deck (DOCDESK)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/F, WCFO)
MIS System
Senior Project inspector (DRP/F, WCFO) '
RIV File
Branch Chief (DRP/TSS)
M. Hammond (PAO, WCFO)
WCFO File
DOCUMENT NAME: R:\\_SO23\\SO727RP.JAS
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclvsures "F" = No copy
" RIV:RI:DRF/F
.
RI:DRP/F
SRI:DRP/F
C:DRF/F
JJRussellPN
JGKrameriff JASloan Ms
DFKirsch g
02/b/98
02v0/98
02//p/98"'" "
02////98
'
OFFICIAL RECORD COPY
'
[EO/
l
l
_-
..
. . . -.
.
- _ _ _ - - - - - - - - - -
J
,