Text
-
-
-
-
-
_ _ _ _ _ - .
_
_
>
.
-
.
,
c.
JUL 0 3195
Docket / License:
50-334/DPR-66
Duquesne Light Company
ATTN:
Mr. J. J. Carey
Vice President
Nuclear Group
Post Office Box 4
Shippingport, Pennsylvania 15077
Gentlemen:
Subject:
Inspection 50-334/86-11
i
This refers to the routine resident safety inspection by Mr. W. Troskoski and
Ms. A. Asars, on May 22 to June 25, 1986, at the Beaver Valley Power Station, Unit
1, Shippingport, Pennsylvania.
The inspection consisted of document reviews, in-
terviews and observation of activities.
The findings were discussed with
Mr. Sieber of your staff.
i
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation enclosed herewith as Appendix A.
The violation has been cate-
gorized by severity level in accordance with the " General Statement of Policy and
,
Procedure for NRC Enforcement Actions," 10 CFR Part 2,- Appendix C.
You are re-
1
quired to respond to the enclosed Notice, and in preparing your response, you
l
should follow the instructions specified therein.
.
The response directed by this letter and the accompanying Notice are not subject
i
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation is appreciated.
Sincerely,
Original Signed By&
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosures:
1.
NRC Notice of Violation, Appendix A
[
.
2.
NRC Region 1 Inspection Report 50-334/86-11
,
-~7
h
D
G
+
,
M/
.
.
_
--
.
-_
-.
_ _ .
.
_.
_
-
. _ _ _ _
' -
,
.
'
Duquesne Light Company
2
M03 M
cc w/encls:
{
C. E. Ewing, Manager, Quality Assurance
W. S. Lacey, Plant Manager
R. J. Druga, Manager, Technical Services
R. E. Martin, Nuclear Engineering
J. D. Sieber, General Manager, Nuclear Services
T. D. Jones, General Manager, Nuclear Operations
4
l
H. M. Siegel, Manager, Nuclear Engineering Dept.
'
N. R. Tonet, General Manager, Nuclear Engr. & Constr. Unit
Public Document Room (PDR)
!
Local Public Document Room (LPDR)
i
Nuclear Safety Information Center (NSIC)
i
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
Section Chief, DRP
P. Tam, LPM, NRR
L. Prividy, RI
1
I
!
R.
D RP
F
.,6
'
,
oIkoski/mjd
pp
We i ger
.
7'1/86
g
//
j
OFFICIAL RECORD COPY
..
,
,
..
.--
.-.
- -
- . - - . - _ - - - . -
-
,.
-
-,
--- .- ,
. , . . .