ML20202E208

From kanterella
Jump to navigation Jump to search
Forwards SALP Repts 50-317/84-99 & 50-318/84-99 for Oct 1984 - Apr 1986.Meeting Scheduled on 860718 in Lusby,Md to Discuss Assessment.Licensee Should Address Reactor Trip Reduction Efforts & Identification of Problem Root Causes
ML20202E208
Person / Time
Site: Calvert Cliffs  
Issue date: 07/08/1986
From: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20202E214 List:
References
NUDOCS 8607140305
Download: ML20202E208 (2)


See also: IR 05000317/1984099

Text

e-

1a

JUL 0 81986

(

DOCKET / LICENSE:

50-317/DPR-53

50-318/DPR-69

Baltimore Gas and Electric Company

ATTN:

Mr. J. A. Tiernan

Vice President

Nuclear Energy

P. O. Box 1475

Baltimore, Maryland

21203

Gentlemen:

Subject:

Systematic Assessment of Licensee Performance (SALP) Report No.

50-317/84-99; 50-318/84-99

The NRC Region I SALP Board has reviewed and evaluated the performance of activi-

ties at the Calvert Cliffs Nuclear Power Plant for the period of October 1, 1985

through April 30, 1986.

The results of this assessment are documented in the en-

closed SALP Board report.

A meeting to discuss the assessment has been scheduled

for July 18, 1986 at the Calvert Cliffs Visitor's Center, Lusby, Maryland.

At the SALP meeting, you should be prepared to discuss this assessment and your

plans to improve those areas that appear to need more management attention.

In

particular, you should plan on discussing the following topics: (1) the NRC per-

ception that licensee identification of potential safety issues lacks sufficient

aggressiveness without active NRC involvement, (2) the need to place more emphasis

on identification of problem root cause(s), (3) reactor trip reduction efforts,

(4) plans to strengthen plant I&C and engineering support, and (5) POSRC effec-

tiveness.

The meeting is intended to be a candid dialogue wherein any comments

you may have regarding our report may be discussed.

Additionally, you may provide

written comments within 20 days after the meeting.

Your cooperation with us is appreciated.

Sincerely,

Oristnal DTgKe'd Sp

The:::a:; E. Murley-

860714030586ggg7

ADOCK 05

PDR

Thomas E. Murley

PDR

G

Regional Administrator

Enclosure:

SALP Report No. 50-317/84-99;50-318/84-99

cc w/ encl:

M. Bowman, General Supervisor, Technical Services Engineering

Thomas Magette, Administrator, Nuclear Evaluations

NRC Resident Inspector

State of Maryland (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Qg

__.4 U A

)

-_

.*

p.

'b

Baltimore Gas and Electric Company

2

JUL 0 81986

t,cc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosure)

DRP Section Chief

J. Taylor, IE

K. Abraham, RI (2 copies)

T. Murley, RI

RI Division Directors

SALP Board Members

F. Miraglia, NRR

J. Partlow, IE

J. Allan, RI

,

l

1

i

!

,

}R8"P Rf1

R .D P

P

RI

D1

RI:DRA

A

6

m&

ey/Trimble/ss

Tripp

We

nger

Sta

tecki

Allan

Muti

,

/

6/w/fr6b&

7 l g6

'3 '86

l

OFFICIAL RECORD COPY

l

f

l

1

i