Forwards Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23 & Notice of Violation.Violations Concern Failure to Properly Implement Calibr Procedures for Personnel Contamination Monitor
ML20202D698
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/06/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20202D704 List:
References
50-295-98-03, 50-295-98-3, 50-304-98-03, 50-304-98-3, NUDOCS 9802170154
Download: ML20202D698 (3)


See also: IR 05000295/1998003

Text

- _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ - _ - _ _ - - _ _ _ _ _ _ _

,

@O

i

e

February 6, 1998

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West til

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT: NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS

50 295/98003(DRS); 50-304/98003(DRS) AND NOTICE OF VIOLATION

Dear Mr. Kingsley:

On January 23,1998, the NRC completed an Inspection at your Zion Generating Station, Units

1 and 2, The purpose of this inspection was to review your radiation protection program. The

enclosed report presents the results of that inspection.

The inspection was an examination of activities conducted under your license as they relate to

radiation safety and to compliance with the Commission's rules and regulations and with the

conditions of your license. The inspection consisted of a selective examination of procedures

and representative records, observations, and Interviews with personnel. Specifically, the

inspection focussed on your radioactive material and waste shipping program and a follow-up of

l previous inspection findings.

l

Your staff implemented several improvements to the radioactive material and waste shipping

program. Procedures were extensively revised and upgraded, and the radiation protection staff

restructured the training and n,ualification programs. The staff also properly prepared and

packag?d radioactive shipments. However, we identified some problems concerning attention

to detail in shipping document preparation and timely resolution of inconsistencies in waste

stream sample results, which were acknowledged by your staff.

We are also concemed about two examples of a violation of NRC requirements identified during

this inspection. The first example of the violation concerns the failure to properly implement a

calibration procedure for a personnel contamination monitor, The second example concems

the failure of two security officers to properly survey material which was removed from a

radiologically posted area and was later determined to be contaminated. Collectively, these

examples indicated independent failures of the contamination control and radioactive material

control programs. We ere concemed that corrective actions for previous radioactive material

control problems were not effective in ~ eventing these examples.

This violation is cited in the enclosed Notice of Violation, and the circumstances surrounding the

violation are described in detailin the enclosed report. Please note that you are required to

, respond to this letter and should follow the instructions specified in the enclosed Notice when j

i

.nonu

9002170154 900206

- . . !I

PDR ADOCK 05000295

G PDR ,

. .__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

O. D. Kingsley 2 February 6, 1998

1

preparing your response. The NRC will use your respo'ise, in part, to determine whether

further NRC enforcement action is necessary to ensure compliance with NRC regulatory

requirements,

In accordance with 10 CFR 2,790 of the Commission's regulations, a copy of thlu letter, the

enclosures, and your response to this letter will be placed in the NRC Public Document Room,

We will gladly discuss any questions you have concerning this inspetAlon.

Sincerely.

Original Signed by Geoffrey E. Grant

Geoffrey E. Grant, Director
Division of Reactor Projecia

l

l

'

Docket Nos. 50 295;50 304

License Nos. DPR 39; DPR-48

Enc;osures: - 1. Notice of Violation

2, inspection Reports 50 295/98003(DRS); 50 304/08003(DRS)

SegMpehod Distribution

.I

i

DOCUMENT NAME: G:\DRS\ZIO98003.DRS

v. .. .e m .- m u w c . e. .. .- . r . co . .u _: .m,. v . e.

OFFICE Rill e Rlli l C. Rlli < G Rlli l ( Rlli l

NAME SOrth:Jp! A GShear 6(J. KOWfrD JGrobe &&G, GGranGEC

DATE 02/3/98 02/5,IB8 02/3/98

026 @ ' 02/G W49

_. _

0FFICIAL RECORD COPY

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _

l

.

l

O. D. Kingsley 3 February 6, 1098

cc w/encls: M. Wallace, Chief of Staff

l D. Helwig, Senior Vice President

l. G. Stanley, PWR Vice President

i J. Perry, BWR Vice President

D. Farrar. Regulatory

Services Manager

1. Johnson, Licensing Director

DCD - Licensing

J. Brons, Site Vice President

R. Starkey, Plant General Manager

R. Godley, Regulatory Assurance

Supervisor

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer

Etate Liaison Officer, Wiscor. sin

Chairman, Illinois Commerce

Commission

Distribution

Docket File w/encls Rlli PRR w/encls Rlll Enf. Coordinator w/encls

PUBLIC IE-01 w/encls SRI, Zion w/encls TSS w/encls

LPM, NRR w/encls J. L. Caldwell, Rlll w/encls R. A. Capra, NRR w/encls

DRP w/encls A. B. Beach, Rlli w/encls DOCDESK w/enets

DRS w/encls G. E. Grant, Rlll w/encls CAA1 w/encls

_ =

a