Provides Addl Clarification of 860522 SER Re App R, Correcting Two Typos & Breaking Down List of Train B Equipment to Identify Equipment Subj to Spurious Operation Due to Fire Induced Hot Spots
ML20202D494
Person / Time
Site: Summer 
Issue date: 07/03/1986
From: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8607140145
Download: ML20202D494 (3)


Text

__ _

1 gth Electric & Gas Company n Nauman gumga.gM18 Nuclear Operations SCE&G

- un, July 3,1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington,DC 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Appendix R Safety Evaluation Report

Dear Mr. Denton:

This letter is being written to provide additional clarification relative to the Appendix R Safety Evaluation Report (SER) which was issued to South Carolina Electric and Gas Company (SCE&G) on May 22,1986. This clarification has been discussed with Mr. Jon Hopkins of your staff and is as follows:

1.

Paragraph II (i)-(typographical error) " fire area CB-1" is actually " fire area CB-12."

2.

Paragraph ll(m), page 11 -(typographical error) " letter dated April 4,1986" is actually " letter dated April 1,1986."

3.

Paragraph II (m), page 9 -(clarification) -The second sentence in the first paragraph of this section of the letter implies that all the equipment listed ic subject to spurious operation due to fire induced hot shorts. Actually, spurious operation only applies to some of the equipment listed. The oric inal list that was submitted was a listing of "B" Train equipment required for safe slutdown. The following is the same list of "B" Train equipment required for safe shutdown with a clarification column added identifying the equipment subject to detrimental spurious operation due to fire induced hot shorts. Two ty!aographical errors have been corrected and the "A" Train com aonents which neecl to be operated for shutdown with "B" Train equipment have a so been identified on the list.

e60714o145 e60703 ^

d 000 PDR ADOCK 05000395 gi F

PDR ^

f

Mr. HErold R. Dent n July 3,1986 Page 2 EQUIPMENT TAG NO.

SPURIOUS OPERATION DESCRIPTION MF5978-AH NO Reactor Bldg. *8* Train Cooling Fan MFM-97D AH NO Reactor Bldg. *B* Tram Cooling Fan XEG-18-DG NO

'8" Desel Generator XF4308 AM NO Chgr. Room Supply Fan *8*

XFN45A-AH NO DG *B" 50% supply Fan XFN468-AH NO DG *B" 50% Supply Fan XFN468-VL NO ChargmgS Pump *B" Room Fan XFM498-VL NO RHfL5 pray Pump *B" Fan XFN-76 VL NO E5F108 Switchgear Room Fan XFN408 AM NO SWPH Supply Fan *B*

XFN418-VL NO

$W Booster Pump *B* Fan XFN-1068-VL NO CREP and *B* Speed Switch Room Supply Fan XF4133 VL NO Aux. Bldg. "S" Switchgear Room Fan XHX 15-VU NO

'8* Chdier XPP-1B{C NO CC Pump *B*

XPP 318-RH NO Rewdual Heat Removal Pump *8*

XPP 398-$W NO SW Pump *8*

XPP436-C5 NO Chargmg Pump *B' XPP458-5W NO SW Booster Pump *g*

XPP408-VU NO Chilled Water Pump *8*

X5W1DS, U14 YES ChargmgS Pump *C* Feeder *B" j

X5W 1DA45.U1' YES Normal Offste treaker X5W-1DA45, U15*

YES Alt. Offste Breaker X$W 1DA45,U3*

YES

  • A* D.G. Breaker X5W 1DG45,U1 YES Alt OffsteBreaker X$W ID64$,U16 YES Normal Offste Breaker X$W 1001, U4C YES Tie Breaker to X5W 183 X5W-1D845 U4 Yes X$W-1EB-E$ Feeder Breaker X5W-1DS45.U6 YES FDR 8teeker R.B. $ pray PP 388 X 5W-ID845. U 7 YES Unit sub Feeder 8reaker X5W 1EB45, U3 YES FDR 8reaker for Unit $vb 1EB1 X5W 108145, U48 YES E$F 480 Unit Sub Mam Breaker X5W 1081,U78 NO FDR Breaker R.8. Fan 978 X5W 1D01,U7C NO FDR Breake* R.B. Fan 97D X5W-IDS 24$, U48 YE5 ESF 480 Unit sub Main Breaker X5W 1EB14$.U48 YE5 ESF 480 Unit sub Mam Breaker

' tram "A" components which need to be operated for shutdown with *8* tram

Mr. H:;r:Id R. Denten July 3,1986 Page 3 The above corrections do not change the safety evaluation and are provided for clarification only. Any questions you may have concerning this information should be directed to Mr. Gary Moffatt or Mr. Hal Donnelly at (803) 345-2201, Ext. 4154.

uly rs, i

HID: DAN:tdh c:

O. W. Dixon, Jr./T. C. Nichols, Jr.

E. H. Crews, Jr.

E. C. Roberts J. G. Connelly, Jr.

W. A. Williams, Jr.

O. S. Bradham D. R. Moore Group Managers C. A. Price R. M. Campbell C. L. Ligon (NSRC)

W. T. Frady G. G. Putt K. E. Nodland R. A.Stough J. B. Hopkins K. S. West R. L. Prevatte P. M. Madden J. B. Knotts, Jr.

1 & E Washington NPCF File 15.1360

..