ML20202D054

From kanterella
Jump to navigation Jump to search
First Partial Response to FOIA Request for Documents.Records Subj to Request Encl & Identified in App a
ML20202D054
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/19/1997
From: Brown N
NRC OFFICE OF ADMINISTRATION (ADM)
To: Keenan J
Public Service Enterprise Group
Shared Package
ML20199L462 List:
References
FOIA-97-325 NUDOCS 9712040132
Download: ML20202D054 (4)


Text

US. NUCLE AR REGULATORY COMMISSION NuC F OW MkOVEST NUMBE RISI FOIA -97 32s

g\ MSPONSE TYPE

'f kh RESPONSE TO FREEDOM OF INFORMATION ACT (FOIA) REQUEST lnNAL oatt M l PARTist (1 S t. )

e.ees Mi I 9 1997 DOCKE t NUMBE R(S5 (if eppocable)

AEOUL5Y E R Jeff Veenan PART 1.-AGENCY RECORDS RELEASED OR NOT LOCATED (See checked bones /

No agency records subject to the request have been located.

No additional agency records subject to the request have been located.

Requested records bre available through another pubhc distribution program. See Comments sectior.,

Agency records subject to the request that are Identified in Appendix (es) are already available for public inspection and copying et the N RC Pubhc Locument Room. 2120 L Street, N W., Washington. DC.

Agency records subject to the request that are identified in Appendix (es) A are being made available for public inspection and copying X si the NRC Pubhc Document Room. 2120 L Street, N.W., Washington, DC,in a folder under this FOlA number.

The nonproprietary version of the proposal {s) that you agreed to accept in a telephone conversation with a member of my staf f is now being made available for public inspection and copying at the NRC Pubhc Document Room. 2120 L Street, N.W., Washington, DC, in a folder un&r this F OI A number.

Agency record? subject to the request that are identified in Appendix (es) may be inspected and copied at the NRC Local Public Docum:.nt Room identified in the Comments section.

Enclosed as snformation on how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, N W , Washington, D1 y Arpricy records subject to the request are enclosed

  • R? cords subject to the request have been referred to another Federa: agencybes) for review and direct response to you.

Fees You will be billed by the NRC for fees totahng $

You will receive a refund from the NRC in the amount of 5 in view of NRC's response to this request, no further action is being taken on appeal letter dated , N o.

PANT 11. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certzin information in the requested "ecords is being withheld from public disclosure pursuant to the exemptions des;ribed in and for the reasons stated in Pgrt II, B, C, and D. Any released portions of the documents for which only part of the record is being withheld are being made available for public inspection and copying in the NRC Pubhc Document Room,2120 L Street, N.W., Washington, DC in a folder under this FOIA number.

COMME N TS ,

  • Copies of the records identified on Appendix A are enclosed,

[m7[k lb ,

Y\ <>

I k Q!l h b h (N 1 acNhtNt ,mstcTop&qstON gF Rt(DOM Of INFORMAtlON AND PUBLICAtlONS SERVICES

].

, w1 9 ". "

e. n.,

r

e n _ .

! 9712040132 971119 "

t PDR FOIA KEENAN97-325 PDR t .. .

l

' D /2' 0 W 5) /.6 Z 3

~~

i e

  • I Rei FOIA-97-0325 i APPENDIX 4 RECORDS BEiNG RELEASED IN THEIR ENTIRETY U2, DATE DESCRIPTION /fPAGE COUNT)
1. 03/31/97 OI Report of Investigation 1-95-013 -

Salem Generating Station Unit 1: Intentionally Operated Outside Its Design Basis and Failed  !

to Make Timely Notification to the NRC of an Unanalyzed Condition Regarding Salem's Pressure Over-Pressure Protection - (38 pp)

2. 02/21/95 i.aibit 1 to ROI 1-95-013 - Investigation Status record - (1 p)
3. 03/14/95 Exhibit 5 to ROI 1-95-013 - Transcript of Investigative Interview of Individual - (31 PP)
4. 03/14/9E Exhibit 6 to ROI 1-95-013 - Transcript of Investigative Interview of Individual - (46 PF) r
5. 03/15/95 Exhibit 8 to ROI 1-95-013 - Transcript of Investigative Interview of Individual - (74 PP)
6. 03/14/95 Exhibit 9 to ROI 3-95-013 - Transcript of Investigative Interview of Individual -(67 ,

PP)

7. Q3/14/95 Exhibit 10 to ROI 1-95-013 - Tranocript of Investigative interview of Individual - (58 PP)
8. 08/24/95 Exhibit 11 to ROI 1-95-013 - Letter to Keith Logan from Mark Wetterham, with enclosures -

(29 pp)

I'

9. 08/1G/95 Exhibit 12 to ROI 1-95-013 - Interview Report of Individual - (2 pp)

+ _ , -~ ,c.. ,w - ., _+-__-.-.-_._.vm_,- _ _ _ . .

-?-

e

10. 01/31/94 Exhibit 13 to ROI 1-90-013 - Incident Report f Sheet - (1 p)
11. 01/30/94 Exhibit 14 to ROI 1-95-013 - In-house Memorandum to The Technical Department Manager, from C. P. Lashkari, subject: POPS Letpoint Impact on PTS Concern - (2 pp)  ;

a

12. 04/22/94 Exhibit 15 to ROI 1-95-013 - In-house Memorandum to John Morrison, fromC. P.

Lashkari, Sub ject: Non-Conservation in POPS r Set Point -

(2 pp)

13. 09/29/93 Exhibit 17 to ROI 1-95-013 - Letter to lioward Berrick, PSE&G Co. from Jeff Huckabee, ,

Weatinhouse Electric Corp. - (3 pp)

14. CI 14/95 f Exhibit 18 to ROI 1-96-013 - Transcript of Investigative Interview of Individual - (54 PP)
15. 04/06/95 Exhibit 19 to ROI 1-95-013 - Memorandum to D. '

Smith, from K. O'Gara, Subjects Evaluation of Reporting Requirements and Root Cause Ansessment Associated with Pressuriner l

Overpressure Protection System (POPS) Issues (IR 95-343) -

(8 pp)

16. 04/20/94 Exhibit 20 to-ROI 1-95-013 - Nuclear Department Incident Report Form, with attachments - (7 pp)
17. 02/27/95 Transcript of Investigative Interview of Individual - (14 pp)
18. 06/22/95 Letter to Keith Logan from Mark J. s Wetterhahn, with enclosures - (66 pp)
19. Various Investigation Status Records (4 pp) dates
20. Various casc Chronology Sheets (3 pp) dates

,www y-gw. g,qm,wywy--m-rw w- *"N='--ip e'yp-r*- "+t--- 1 e" + 7 -

+7---*

+ , . - gi EmM e,w, ww se- +-- --m--'-.7,--w'-%- y--+ r W .- .ve-y- rim.-

1 e .

e

21. 04/03/97 Memorandum to H Miller from B Letts,

Subject:

Salem Generating Station Unit la Intentionally Operated Outside Its Design Basis and Failed to Make Timely Notification to the NRC of an Unanalyzed Condition Rega?: ding Salem's Presure Over- ,

Pressure Protection System (Case No.

1-95-013) (2 pp) e E

, , - - - - , , , , , , , u -

g 7 j E

Pur ite Service Electric and Gas Company P O. Box 236 Hancocks Brhigo. Naw Jersey 08038 0236 Nuclear Business Unit AUG 191997 W $4MWI LW-FS '01 Ogge b 77- 3 a6  :

Director, Division of Freedom of Dam Rockt ~~ il .2lo-t 7 '

gg g, C Information & Publications Svrvices office of Administration " -

U.S. !Juclear Regulatory' Commission .

Two White Flint IJorth Building l 31545 Rockville Pike Rockville, MD 20p52 RE: Freedom of Information Act Request Regarding the Salem Generating Station, Docket Nos. 50-272 and 50 311, for NRC Office of Investigation Case No. 1-95-013

Dear Sir:

This is a Freedom ol Information Act request pursuant to 5 U.S.C. S 552 (e) il) and 10 C.F.R. S 9.23. We request that you make availal e to Public Service Gas and Electric (FSE&G) the NRC Office of li.;estigation report and associated support documentation related to Case No. 1 013 regarding the Salem Generating Station. We agree to bear the cost of this request as per 10 C.F.R. 99 9.23 (b) (4), 9.33, 9.39, and 9.40. Please contact me at (609) 339-5429, at your convenience if you have any questions regarding this request.

Please direct your respcnse, pursuant to 10 C.F.R.

S 9.27, to:

Jeff Keenan, Esq.

Public Service Gas & Electric P.O. Box 236, M/C N21 Hancocks Bridge, NJ 08038 (609) 339-5429 Fax: (609) 339-1234 Thank you for your cooperation in this matter.

Sincerely, p' '.k ,

/

Yud&

/ .

W M i p h i!*"li , J;.',

L L Lih