Forwards OI Rept of Investigation Concerning Plant,Unit 1 Intentionally Operated Outside Design Basis & Failed to Make Timely Notification to NRC of Unanalyzed Condition Re Salem Pressure over-pressure Protection Sys (Case 1-95-013)
ML20199L695
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/03/1997
From: Letts B
NRC OFFICE OF INVESTIGATIONS (OI)
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20199L462 List:
References
FOIA-97-325 NUDOCS 9712020087
Download: ML20199L695 (2)


Text

.

s@ ntty h*

UNITED STATES j

NUCLEAR REGULATORY COMMisslON

{'.

f OFFICE OF IN VESTIGATIONS FIELD OFFICE. REGION I o,

p 47f, ALLENDALE ROAD KING OF PRUSStA, PENNSYLVANIA 19406 April 3, 1997 MEMORANDUM T0:

Hubert J. Miller, Regiona inistrator Region I FROM:

Barry R. Letts,. Director Office of Investigations

.1d ice, Region I

SUBJECT:

SALEM GENERATING STATION UNIT 1:

INTENTIONALLY OPERATED OUTSIDE ITS DESIGN BASIS AND FAILED TO MAKE TIMELY NOTIFICATION TO TiiE HRC OF AN UNANALYZED CONDITION REGARDING SALEM'S PRESSURE OVER PRESSURE PROTECTION SYSTEM (CASE NO. 1 95 013)

Attached, for whatever action you deem appropriate, is the Office of Investigations (01) Report of Investigation concerning the above matter.

Neither this memorandum nor the report may be released outside the NRC without 1

the permist on of the Director, OI.

Flease ensure that any internal office i

distribution of this report is controlled and limited only to those with a need to know and that they are aware of the sensitivity of its contents.

Treat as " Official Uri Only."

Attachment:

Report w/ exhibits cc w/ attach:

J. Lieberman, OE L. Chandler, OGC cc w/ report:

E. Jordan. DEDO S.. Collins. NRR D. Ross. AE00 9712O20007 971119 KE N 325 PDR

.)

i Aprii.3,1997 MEMORANDUM TO:

Hubert J. Miller, Regional Administrator Region I FROM:

Barry R. Letts. Director Office of Investigations Fielo OfNce, Region I

SUBJECT:

SALEM GENERATING STATION UNIT 1:

INTENTIONALLY OPERATED OUTSIDE ITS DESIGN BASIS AND FAILED TO MAKE TIMELY NOTIFICATION TO DIE NRC 0F AN UNANALYZED CONDITION REGARDING SALEM'S PRESSURE (".'ER PRESSURE PROTECTION SYSTEM (CASE N0. 1 95 013)

Attached, for whatever action you deem appropriate, is the Office of Investigations (01) Report of Investigation concerning the above matter.

Neither this memorandum nor the report may be released outside the NRC without the permission of the Director, 01. Please ensure that any internal office distribution of this -eport is controlled and limited only to those with a

~

need to know and that they are aware of the sensitivity of its contents.

Treat as ' Official Use Only."

Attachment:

Report w/ exhibits cc w/ attach:

J. Liebenaan, OE L. Chandler, 0GC 4

cc w/ report:

E. Jordan DEDO S. Collins. NRR D. Ross, AE00 Distribution:

s/f (1 95 013) i c/f D. Lewis. GI:HQ DOCUMENT NAME. A:195013.TL 1.m.

.e m. e mt. m e w: c - em umut ememe.ncww. r - cm m.metim.ou.neuw.

u. w em 0FFICE 01:R1 DbRi l

~

l

.NAME Klogan:mjh W BLettsM/

l DATE 03/28/97 03/31 /97 03/

/97 03/

/97 03/

/97 0FFICIAL RECORD COPY n

-