ML20202B179

From kanterella
Jump to navigation Jump to search
Rev 9 to AP-513, Toxic Gas
ML20202B179
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/04/1998
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20202B132 List:
References
AP-513, NUDOCS 9802110138
Download: ML20202B179 (17)


Text

-

TG REV 09 AP-513 T0XIC GAS 1.0 ENTRY CONDITIONS E any of the following conditions exist:

IN FOR V ATIO N

  • Toxic gr' is detected at CR-3 ONLY Toxit gcs is detected at Units 1 and 2 Notified by Fossil Unit of toxic gas that may affect ro -

IHfB usa this procedure, O

g.

J/ C DateSI'!8 Approved by MNPO

~

o (S % Tuff O'N FILE)

AP-513 PACE 1 of 17 TG hDR O

302 v

P PDR 1

-4_

P O

l=

l-BLANK PACE O

AP-513 REV 09 PAGE 2 of 17 TG

2.0 IMMEDIATE ACTIONS

. ACTIONS-DETAILS 2.1 Select both " CONTROL COMPLEX HVAC-

' ISOLATE / RESET" switches-to "1S0".

l-O AP-513 REV 09 PARE 3 of 17 TG

O i

i i

i I

1 i

BLANK PAGE O

l l

O AP-513 REV 09 PAGE 4 of 17 TG

-3.0 FOLLOW-UP ACTIONS

-ACTIONS DETAILS

3.1 Notify personnel-of plant.

STA L

conditions.

e Plant Operators e

SS00 (evaluate plant conditions for' potential entry into Emergency Plan) l e

Fossil Units e

TSC (if activated)

I,

(

V AP-513 REV 09 PAGE 5 of 17 TG a

M O

4 l

BLANK PAGE O

i O

AP-513 REV 09 PAGE 6 or 17 TG 1

Y1 s

3.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS CAUTION With all CC ventilation stopped, the CC may reach its design limit of 95** in as little as 30 minutes.

?.2 Verify all CC dampers properl) aligned.

AHD-12 closed AHD-120 closed AHD-2C closed AHD-2E closed 5

AHD-1C

_ _ closed AHD-lE closed O\\d AHD-3 open

.===

1F_ AHD-3 closed, AHF-17A AHF-17B JHf3 stop all CC supply and return fans.

AHF-18A AHF-18B AHF-19A AHF-19B AP-Si3 REV 09 PAGE 7 of 17 TG

~

e O

n l

l t

BLANK PAGE O

AP-513 REV 09 PAGE 8 of 17 TG

3.0 i2JLLOW-UP ACTIONS (CONT'D) g

(

ET10NS DETAILS 3.3 JF at any time, Control Room atmosphere becomes AHF-17A AHF-178 uninhabitable, IHEN stop all CC supply

- AHF-18A AHF-18B and return fans and don air packs.

AHF-19A AHF-193 RQIE If AHF-20A cc AHF-208 were running in slow speed when toxic gas actuated. AHF-44A, AHF-448 and AHF-30 will remain available.

3.4 IE AHF-20A, AND AHF-20B are stopped, AHF-44A IREN ensure all auxiliary fans are stopped.

AHF-44B l

AHF-30 O

AP-513 REV 09 PAGE 9 of 17 TG l

~

AD,911 cable carry-over steps:

l f's 3.3 If Control lioom atmoJphere becomes uninhabitable...

G (g

I 1

O

\\d AP-513

'<EV 09 PAGE 10 of 17 TG s

?.0 FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAlls 3.5

.Deteraine the cause and

  • Notify PPO to report local toxic gas location of the toxic gas monitor indications (164 ft CC south actuation, wall):

AH-648-CE AH-652-CE AH-649-CE AH-653-CE o Review the following computer group 9 computer points:

S263-Train A Cl 2 S297 Train B C1, S298. Train A S0, S299 Train B S02 o Notify Health Physics to sample the following areas-for toxic gas:

Control Complex Berm Area i

v AP-513 REV 09 PAGE 11 of 17 l

TG

Appliceble carry-over steps:

G 3.3 (b

11 Control Room atmosphere becomes uninhabitable...

O\\]

O 5

7 l

AP-513 REV 09 PAGE 12 of 17 TG g,

.v 3.0 FOLLOW-UP ACTIONS.(CONT'D)

ACTIONS DETAILS 3.6 Evacuate affected areas as 1 Determine area evacuation based on required.

the following:

Source of toxic' gas Atmospheric conditions Inhabited or not Evacuation route l

2 IE evacuation is required, IEW perform the following:

. Depress appropriate evacuation alarm push button if required.

Notify plant personnel over PA.

Repeat PA announcement.

I

'3.7

)ELW Health Physics IE toxic gas monitors are in reports outside atmosphere

alarm, toxir gas concentration IH W purge toxic gas from has owered to safe.

intake duct by performing the

levels, following steps in order:

JH W purge CC intake duct 1 required.

Select " DAMPER OVERRIDE" switch to "0N".

Adjust "CNTRL COMPLEX RECIRC DNPR"

. potentiometer to "10" (Full Flow) position.

)LHfB toxic gas monitor alarms reset, IEW place "CNTRL COMPLEX RECIRC DMPR" in "0" position.

Select "DAPDER OVERRIDE" switch to "0FF".

A()

AP-513 f,EV 09 PAGE 13 of 17 TG

V i

l i

BLANK PAGE AP-513 REV 09 PAGE 14 of 17 TG

3.0 FOLLOW-UP ACTIONS (CONT'D)

I)

ACTIONS DETAILS w_-

3.8 Restore CC ventilation to 1 Ensure only one train of CC normal.

ventilation operating:

A Train B Train AHF-17A AHF-17B AHF-19A AHF-198 2

Select both " CONTROL COMPLEX HVAC ISOLATE / RESET" switches to " RESET".

3 Ensure dampers properly reposition:

Closed AHD-2C Open AHD-2E AHD-lC i/

AHD-lE 4 Ensure only one train of ventilation operating:

A Train B Train AHF-20A AHF-20B AHF-44A AHF-44B AHF-30 AHF-30 5

Verify AHD-12 open.

6 Verify AHD-12D open.

7 Ensure AH-32-FIR, Channel A indicates = 35,000 scfm.

(a 4

(_)

AP-513 REV 09 PAGE 15 of 17 TG n

O BLANK PAGE O

O AP-513 REV 09 PAGE 16 of 17 TG i --

e 3.0 FOLLOW-UP ACTIONS (CONT'D)

Ch

()

ACTIONS DETAILS 3.9 EXIT this procedure.

l O

a AP-513 REV 09 PAGE 17 of 17 (LAST PAGE)

TG

.