ML20202B157
ML20202B157 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 02/04/1998 |
From: | FLORIDA POWER CORP. |
To: | |
Shared Package | |
ML20202B132 | List: |
References | |
AP-430, NUDOCS 9802110132 | |
Download: ML20202B157 (23) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4 1
LOCRA REV 02 AP 430 LOSS OF CONTROL ROOM ALARMS 10 EhTRY CONDITIONS lE Any of the following conditions exist:
An unplanned sustained loss of the Plant Computer
- Loss of the Annunciator CRT Loss of the MCB annunciator windows J11W use this procedure.
i I l ATi O 2.0 IMMEDIATE ACTIONS
- sn There are no immediate ac.tions for this procedure,
,n O O Approved by MNP0 / .72b kJ ate 2 /Y /96
_ (SIGNA /DRE/NFILE)
AP-430 PAGE 1 of 23 LOCRA 9002110132 980204 5" ^""? _
8 'a "
JA%2 A,wd m ,_-e ____ -__,-.A.as., __ e _ ..t__- 4 ___.,-,s .w~u-4-_.. = . -s+m_.- m.--4-._%,. _ > La.m.._2ho. 6_.A4 . > _4--4.--s.ww_a-4.v.ae-E--ea. e A-4_
l
+
r BLANK PAGE O .
9 O
AP-430 REV 02 PAGE 2 0F 23 LOCRA
. 3.0 FOLLOW.UP_ ACTIONS ACTIONS DEIAllJ 3.1 _._, Notify personnel of plant e_ STA conditions.
- S500 (to (valuate plant conditions for potential entr/
into the Emergency Plan) 3.2 Increase equipment e increase monitoring of MCB monitoring. instrumentation.
- Notify plant operators to increase equipment monitoring and assign additional personnel as required.
. 3.3 Suspend maintenance and operational activities t
]v that could result in a plant transient. -
3.4 E Annunciator System is available,
- E all of the following are available, lisji 60 TO Step 3.23 111@ the Annunciator System is available: ._
Annunciator CRT MCB annunciator windows O
AP-430 REV 02- PAGE 3 0F 23 l LOCRA
-.- _- - - .. _ --..- . - _ . -... .- ._ - ~._.- - - - - .
1 iO 1
- l 4
j d
d 1
i ,
l i
i J
t 4
1 BLANK PAGE 9
I f
i j
s a
AP 430. REV 02 PAGE 4 0F 23 LOCRA
.- -i-., - r- - ,-.--.,y., - . y e .-.--.w... -.y-. -g--._ .,,w.,---v., 4 . . . _ - - -_ _ - - _ _ _ _ , , _ -
4
. 3.0 FOLLOW.UP__ ACTIONS (CONT'D)
_ ACTIONS DETAILS 3.5 Ensure power available to e Ensure the following lights are annunciator system. illuminated on " VITAL BUS C VBDP-5 CIRCUIT STATUS PANEL":
Status Lamp 16 " ANNUNCIATOR MONITOR ANNUNCIATOR ALARM TYPER" I
Status Lamp 28 " ANNUNCIATOR SYSTEM" e Notify SP0 to ensure closed DPDP 4B 8 " FIRE BELL FOR SYSTEM 10 AND SYSTEM 17".(124 ft CC CRD Room).
3.6 1[ Rochester Events 1 Ensure All of the following in Recorder is RQI available Annunciator Cabinet 1:
ItiG ensure proper power ,
supply alignment.
O Test switch S1 is"0 PEN" Power switch S2 is"0N" Power switch S3 is"0N" lest switch S4 is"0 PEN"
,_ Voltage = 120 volts 3.7 e 1E Annunciator CRT is @ l Monitor alarms using alarm typer available. (behind MCB).
6.NQ alternate alarm verifications are e IE alarm typer is not available, available, IBM depress "N0 PRINT" on the IliQ monitor alternate Rochester Events Recorder to alarm indications and enable installed printer.
-60 TO Sten 3.22 -
AP 430 REV 02 PAGE 5 0F 23 LOCRA
t 4'
O BLANK PAGE O .
O AP-430 REV 02 PAGE 6 0F 23 LOCRA
.. 3.0 FOROW-UP ACTIONS (CONT'D)
ACT10 tis DETAILS 3.8 Take compensatory actions.
- Maintain plant in steady state condition, o Clear the Control Room of all non essential personnel, e Increase monitoring frequency of plant computer, if available, e Notify Maintenance personnel.
3.9 Monitor Radiation Monitoring Panel, e Observe individual monitors for alarm conditions.
See AR 403, PSA H Annunciator Response.
O 3.10 H it any time, applicable atmospheric radiation monitor "HIGH ALARM" is
- RM- Al -
lit. . RM A2 lllDi CONCURRENTLY PERFORM AP 250, Radiation Monitor RM A3 Actuation, beginning with
-Step 3.1 .
t
=AP 430 -REV 02 PAGE 7 0F 23 LOCRA
e 9
Applic able carry-over steps: l 3.10 1E any atmospheric RM actuates, 1[iQi CONCURRENTLY PERFORM AP-250...
l n
I .
n b - .
AP-430 REV 02 PAGE 8 0F 23 LOCRA
. 3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.11 Stop radioactive releases, e Liquid releases a WGOT releases e RB Purge 3.12- Place the CC ventilation -1 Notify Chemistry personnel, in recirc.
2 Select both " CONTROL COMPLEX HVAC ISOLATE / RESET" switches to "150".
3 Verify closed:
AHD-12 AHD 2E
-AHD-120 AHD-lc AHD 2C- AHD-lE 4 Verify open AHD-3 5 If AHF-20A and AHF-208 fans are-stopped,-
IRQ ensure auxiliary fans are
, stopped:
AHF 44A AHF-44B AHF-30 LO AP-43'O REV 02 PAGE 9 0F 23 LOCRA 4
Applicable carry-over steps:
3.10 1[ Aqy atmospheric RM actuates, IHfh CONCURRENTLY PERFORM AP-250...
(
3 (V
x)-
AP-430 REV 02 PAGE 10 0F 23 LOCRA
. _-a
3.0 F0LLOW UP ACTIONS (CONT'D) l ACTIONS DETAlls
- 3.13 _ E core cooling is via DHR
- Ensure the following parameters are System, acceptable:
IR Q ensure proper DHR parameters. RCS PRESS RCS TEMP I
RCS level DH Flow See OP-103B, Plant Operating Curves 3.14 Ensure pro)er valve
- 1F, RCS PRESS is a 284 psig,
)ositions )ased on RCS IBM ensure DHV-91 closed.
)RESS.
' * -E RCS- PRESS is -2 200 psig, ItfB ensure proper position of RCV-b3 for plant conditions.
O ,
3.15 E at any time, IA PRESS s; 95 psig. SAP-1A IH M ensure proper compressor operation. SAP-1B IAP-1A IAP-1B 3.16 H at any time, IA PRESS
< 90 psig, It[@ CONCURRENTLY PERFORM AP-470, Loss of Instrument Air, beginning with Step 3.1 O_ _
-AP 430 REV 02 PAGE 11 0F 23 LOCRA
Applicable carry over steps:
/G 3.10 E AD.y atmospheric RM actuates, M CONCURRENTLY PERFORM AP-250...
U 3.15 E 1A PRESS s 95 psig, M ensure proper compressor operatien.
3.16 E IA PRESS s 90 psig. M CONCURRENTLY PERFORM AP-470...
i I
i O
f \
x AP 430 REV 02 PAGE 12 0F 23 LOCRA
. 3.0 FOLLOW UP ACTIONS-(CONT'D)
ACTIONS DETAILS 3.17 _. If at any time, flooding e Notify SP0 to monitor TB for is detected, flooding.
J118 CONCURRENTLY PERFORM AP 1050, flooding, beginning with Step 3.1
, 3.18 jf at any time, ICS power 'l IE the Rx is critical, is liq 1 available, lilB manually trip the Rx and
$!fDprimarytosecondary CONCURRENTLY PERFORM E0P 02, heat transfer is in Vital System Status p,r.o_ g re s s , Verification, beginning with 1110 trip MfWPs and Step 2.1 control OTSG parameters.
2 Trip the MFWPs:
FWP 2A I
FWP 2B i
3 Ensure EFWPs start and control flow:
O _ EFP-1 EFP 2
-[ Rule 3. EFW Control) l 4 Ensure ADVs control OTSG PRESS:
t MSV 25 i
MSV 26 L
iO AP-430 REV 02 PAGE 13 0F 23 LOCRA ,
I f- ,c,. p,-e:- -m,-wg ,--.,,-g.,-r,g , ,. a. , , , , , , , .,,umc.,
,.,- -n -, ,, -y,, ----.,m,w, m,- w w, a-, ,.n n-,---,--. , , ,,
i Applicable carry over steps:
l 3.10 E any atmospheric RM actuates, M CONCUARENTLY PERFORM AP 250...
3.15 E lA PRESS s 95 psig, M ensure proper compressor operation.
l 3.16 E lA PRESS s 90 psig. M CONCURRENTLY PERFORM AP 470...
i 3.17 E flooding detected, M CONCURREhTLY PERFORM AP-1050... 1 3.18 E ICS power.is @l available MQ OTSG cooling, M trip MFWPs...
i e
4 9
AP 430 REV 02 PAGE 14 0F 23 LOCRA'
, , - 3.0 FOLLOW-UP ACTIONS (CONT'D1
() ACTIONS DETAILS 3.19 IE at any time, NNI-X e Observe "X PWR ON" status lit. -
power is N01 available, M CONCURRENTLY PERFORM AP 581 Loss of NNI-X, l
beginning with-Step 3.1 r
a 3.20 if at any time, NNI-Y e Observe "Y PWR ON" status lit.
power is 801 available, 1 HEN CONCURRENTLY PERFORM
, AP 582, Loss of NNI-Y, beginning with Step 3.1 b
] 3.21 ___ If at any time, SW Surge lank level < 7-(t, s
IHEN CONCURRENTLY PERFORM AP-330, Loss of Nuclear Service Cooling, beginning with Step 3.1
(} ,
3.22 ___ IE Plant Computer alarming capabilities are available, IBEN GO TO Step 3.25 s
1 O
AP-430- REV-02~ PAGE 15 0F 23 LOCRA g- w + r .-,,w we m gx e w-,---,-r-. - - , - , , --a,- ,,,,.,,, w ---r .,,,va_n-m--- ,- ---,----<r,m---+5
I 4 .
Applicable carry over steps:
4 1.10 E any atmospheric RM actuates, M CONCURRENTLY PERFORM AP-250... >
)O 3.15 E lA PRESS o 95 psig, M ensure proper compressor operation.
3.16 E lA PRESS s 90 psig, M CONCURRENTLY PERFORM AP-470... .
3.17 E flooding detected, M CONCURRENTLY PERFORM AP 1050 4
3.18 E ICS power is @l available AliQ OTSG cooling M trip MFWPs...
j 3.19 E NNt-X power lost, M CONCURRENTLY PERFORM AP 581...
3.20 E NNI Y power lost, M CONCURRENTLY PERFORM AP 582...
'r 3.21 E SW surge tank < 7 ft, M CONCURRENTLY PERFORM AP-330...
i 1
1 4
- O e '
4 d
1 i
(u O
AP-430 REV 02 PAGE 16 0F 23 LOCRA
{
- i
, 3.0 FOLLOW-JP ACTIONS (CONT'D) I ACTIONS DfJALLS ,
I STA105 Plant computer is not available, j 3.23 11 plant computer is N91 e _, Ensure all breakers on VBDP-7 i
available, are closed.
111EN ensure power available to plant computer. ;
l t
3 . 2 4 ,_,, Take compensatory actions, o Establish and maintain :s; 100% .;
Rx power as indicated on MCB instrumentation.
- Suspend all activities that rely .
on plant computer data, o CONCURRENTLY PERFORM one of the ;
following: ~
SP-300, Operating Daily .
Surveillance Log, applicable steps of Section 4.2, S ,
Surveillance Frequency.pecial SP 301~ Shutdown Daily Surveillance Log, applicable steps of Section 4.2, S Surveillance Frequency.pecial e Notify Nuclear Computer and Controls Specialist.
1 O l AP-430. REV 02 l PAGE 17 0F 23 LOCRA i
. . , - . . .-,,2,.. - . . - . ~ . - - , . ~ . , - . -
Applicable carry over steps:
3.10 - E any atmospheric RM actuates, M CONCURRENTLY PERFORM AP-250...
3.15 E IA PRESS s 95 psig, Ilim ensure proper compressor operation.
3.16 E IA PRESS s 90 psig, IN_G CONCURRENTLY PERFORM AP-470...
3.17 E flooding detected,- 1&W CONCURRENTLY PERFORM AP-1050. ..
3.18 E ICS power is 1[Q1 available MQ OTSG cooling, E trip MFWPs...
3.19 E NNI-X power lost, Itig CONCURRENTLY PERFORM AP-581...
3.20 E i;NI Y power lost,111@ CONCURRENTLY PERFORM AP-582...
3.21 E SW surge tank < 7 ft, IEW CONCURRENTLY PERFORM AP 330...
O AP 430 REV 02 PAGE 18 0F 23 LOCRA
-ge,yn---- , , , - , .----m.---=, , , .. ., , , ---wc- - ,- --
4 i
i-. 1
, 3.0 FOLLOW-UP ACTIONS (CONT'D) i ACTIONS DETAILS 3,25 M maintenance
- E MCB annunciator windows, activities are complete, QB Rochester Events Recorder was M ensure proper post lost, a
maintenance testing. M request applicable portions of PM 104, 0)erability and Functional Cieck of the- Events Recorder and Annunciator System, be performed (as determined by MNPO and Electrical Supe-visor).
e ,__ E plant computer was 1 Mt, 4
M request Nuclear Computer and Controls Specialist to verify operability of applicable portions of the plant computer alarms (as determined by MNP0 and Nuclear Computer and Controls Specialist).
i A
1
- O 1
Y 4
0 i
O
.AP 430 .REV 02 PAGE 19 0F.23 LOCRA
Applicable carry-over steps:
3.10 E AD.Y atmospheric RM actuates, M CONCURRENTLY PERFORM AP 250...
3.15 E 1A PRESS s 95 psig, M ensure proper compressor operation.
3.16 E IA PRESS s 90 psig, IBIB CONCURRENTLY PERFORM AP 470...
3.17 E flooding detected, M CONCURRENTLY PERFORM AP 1050...
3.18 E ICS power is HDI available MQ OTSG cooling, E trip MFWPs...
3.19 E NNI-X power lost, M CO*8 CURRENTLY PERFORM AP-581. . ..
3.20 H NNI-Y power lost, M CONCu1RENTLY PERFORM AP 562...
3.21 E SW surge tank < 7 f t, M CONCURRENTLY PERFORM AF-330. . .
l 9
=
O AP-430 REV 02 PAGE 20 0F 23 LOCRA I
_ )
_ _ _ _ _ . .. . . _ _ _ . _ . . _ . - _ _ _ - . _ - _ _ _ . - _ . . _ - . ~ . _ _ . _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . . . . _ . _ _ _
3.0 FOLLOW-UP ACTIONS (CONT'D)
ACTIONS DETAILS 3.26 1E CC ventilation was 1 Ensure only one train of CC placed in recirc, ventilation operating:
IEN restore CC ventilation to normal. '
A Train B Train AHF-17A AHF-178 AHF 19A AHF-138 :
2 Select both " CONTROL COMPLEX HVAC ISOLATE / RESET" switches to
- RESET".
3 Ensure dampers properly reposition:
Closed AHD-2C r
Op a AHD 2E
-p AHD-10 AHD-lE , .
4 Ensure only one train of ventilation operating:
A Train B Train-r AHF-20A AHF-20B
[ AHF 44A AHF-44B AHF-30 AHF-30 5 Verify AHD-12 open.
6 _ Verify AHD-12D open.
7 Ensure AH-32-FIR, Channel A L
indicates = 35,000 scfm.
h AP-430- REV 02 -PAGE 21 0F 23 LOCRA l
l 1 .
i I.
BLANK PAGE 9
O AP 430 REV 02 PAGE 22 0F 23 LOCRA
. _a
3.0 FOLLOW UP ACTIONS.__(CONT'Q1 l
ACTIONS DETAILS 3.27 EXIT this procedure.
l O
O AP-430 REV 02 PAGE 23 0F 23 (LAST PAGE) LOCRA
__