DuitE PdWER GOMPANY P.O. HOX 33189 CHARLOTTE, N.C. 28242 HAI.' H. TUCKER TELEPHONE woon. sam emontdom k (704) 073-4838 vu.m enemmeur a* -
v
?s June 30, 1986 a
O-
..u e.1.,
e.
- r. Harold R. Denton, Director
~
Office of Nuclear Reactor Regulation U.. S. Nuclear Reg'ulatory Connaission..
Washingt,on, D. C.
20555
.. ~
Attention:
Mr. B. J. Youngblood~ Project DI' rector
.PWR Prbject Directorate No'.~ 4 Re: Catawba. Nuclear Station, Units 1.and 2
~
Docket Nos. 50-413 and 50-414 Tecluti* cal Specification Amendment for Dissel Generators
'.s'
Dear )fr. Dsnton:
This letter is to' clarify some of clie Techtilcal Specification changes requested in my. letter of March 24, 1986.
c..
.The March 24,1986* request inadvertently omitted the appropriate Action ' stat ' ment..
- for..the' condition where only one diesel is inoperable. This clarification adds the
. neces'sary requirement on page. 3/4 841. Also, tiie words "(if applicable)" are tb be added to clarify that Action b. may not be applicable if both offs'ite circuits are operable while one diesel is inoperable.
~
_ On page 3/4 8-2, Action statement d., the words " separately for each diesel' generator" are to be added to clarify the intent of the required action when both offsite A'C.' circuits are ingperable.
~
The final change is on page 3/4 8-7,, Stirveillance 4.8.1.1.3 which retains the la' t s
sent9nce in the Surve,illance.
- The previous submittal had 's equested that this1 sentence be deleted as was done in the North Anna Specifications. Basedujon' conversations with your staff, this sentence is to remain.
o
~
~
Ps s ant to 10 CFR 50.91 (b) (1) the appropriate South Carolina State Official is being provided a copy of this. clarification to our amendment requeet.-
~
Ve'ry truly you,rg,.,
i. g. -
L
- Jg. -
"f/L j" -.
Hal B. Tucker A'ttachment 86071'00179.860630
$k
.RWO: sib.
4
%I 4
DR ADOCK 05000413' e
p pyg
,W Y
9 6
v.
gw
~
Mr. Harold R. Denten, D[rsctor June 30, 1986 Page Two s.
w..
t'.
a xc:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Gommis.sion Region II'
~
- " - 101 Marietta' Street, NW, Suite 2900 Atlanta, Georgia 30323 e
Mr. Heyward Shealy, Chief.
Bureau of Radiological Health
+
E
. South Carolina, Department of Health &
Environmental Control 2600. Bull Street Columbia, Soutif Carolina' 29201
~.
INPO Records Center Suit'e 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 e
imerican Nuclear. Insurers.
c/o Dottie Sherman, AN,I Library
,The. Exchange, Suite 245 270 Farmington Ave.nue 4
Farmington, CT 06032 M&M Nuclear ConsInlta'nts.
1221 Avenue of the Americas
- New York, New' York 10020 A
Mr. P. H. Skinner NRC Rtsident Inspector
' Catawba Nuclear Station
' I
.~,
- e.
4-b u
c-t se
's 5
O g3,
b
$9 e
e 3.
e A
e e
l t
I( ci%cr kselhoecabr W d b'" ' 5"#""
f*
" F"'Y ZY Wr.,'za..maa%+<. ks OPGAA 6h.rry kn3 peefoemony %wif M 'h airw ela
~
g 4.8./. I.
D ctnd 4 8. t. l. z a. s) L ea-a g & diesel 3e;e,ake ge,,_,,jgy 3/4.8 ELECTRICAL POWER SYSTlMS jgg
..g g g 33 3/4.8.1 *A.C.
SOURCES ce y 5_
OPERATING, x'
1 LIMITING CONDITION FOR OPERATION c
s a
,d
\\
3.8.1.1 As a niinimum, the following A'.C. electrical power sources shall be I
- t. -
p, #
OPERABLE:
9 y
${y L
a.
,Two. phys,ically iddependent.ci'rcuits between the offsite transmission gg network and the Onsite Essential Auxiliary Power System and Q,
NO b.
Two.sepagate and indeppndent diese1 generators, each with: 7 1-)
A separate day tank containing a minimum volume of 4t*
- gallons
'o
,p M of fuel.,
~
l u7' 2)
A separate Fuel Stofage System containing a minimum volume of
,,3 y -
% t oo ---ettiett. gallons of f'uel, s.gb 3)
A separate fuel transfer valves and
'b$
4)
A ' separate 125 VOC battery and charger connected to the diesel
,$ [3 generator control loads.
1-Q APPLICABILITY:
MODES 1, 2, 3, and 4..
v h ' ~. ACTION.
i 3 i
a.
'With eseher an offsite circuit - "-- '
n i of the above
% V, required A.C.- electrica power sources inoperable, demonstrate the OPERABILITY of the maining A.C. sourcef by performing Specifica-jo[c o
tions 4.8.1.1.la M " ^ ^ ^ ^
^) within 1. hour and at least once
.g,,
co er.; 7estore r
-- ff f site circuitpomb-per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> there l
1--
o
,.n.
- - ;- - -- - -- t -- to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in l c.c. c 0 at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> an'd in COLD SHUTOOWN
_{E -j' j within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.-
3' b.
With one offsite circuit and one di'esel generator of the above I
I #.nr required A.C. electrical po'wer sources inoperable, demonstrate,the 19d
<0PERABILITY of the remaining A.C. sources by, performing Specificq-
,.g T y +
_tions 4.8.1.1.la. N withi.n 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at d x.
least once per 8 hpurs thereafter.q'i'estore at least one of the I,,5 i C-inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at 7 3 y e.
least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN
~
~
4 within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Restore at least two offsite circuits
- g *E.4 e and two_ditsel-generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from'
{ d 'O the time of 55Itill T6ss or be in at least HOT STANDBY within the.
b 'O $ ~2 x
t next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD'S UT00WN within the following 30. hours.
e - 3
'ZNSERT Fgon M&W PkSL J.-pMq c.[Withonedimeselgenerator'noperableinadditiontoACTION bMa#cdlD
/. y above, verify,ttrat:
a ylh 1.
All required systems, subsystems, trains,, components and devices t 4 3' j that depend on the remaining OPERABLE diesel generat6r as a h ! g(
source of emergency power are also'0PERABLE, and E9+
]O 4 % +eW \\s segaieed +o G co 'npl<bd,rgarSess of u> hen /h e incperalle
,9 f e( 0 l
3 4esei a resbed -h DF6446f tlTY. %e (r.v.%n..4 S'peci[jen cedoc e f k
Iekkon. 3. o. 2 are no.4 app Hca fle.
$ J g CATAWBA - UNITS 1 & 2 3/.4 8-1 e
L e
n
6
~
.o.
~
p
~
e g 7 q ng ' c."
~
e With a diesel. generator-of the above req 0 ired A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the A.C.* offsite sources by performing Surveillance Requirement 4.8.1.1.la within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and unless the 2 6 maintenance, demonst. rate the operability of the remaining dies ;
inoperability of the diesel was due to preplanned testing or o
. generator by performing SurveiMance Requirement 4.8.1.1.2a.4fwithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore diesel generators to OPERABLE status within 72.
hours or be in at least HOT STANOBY within the mext*6 hours and in COLD SHUTDOWN with,in the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, s
f O
i i
a 8
~
~
n G.
e
~
9 g
t e
s
teshb eneca.hr WN48tt*t n'y, fa,ye;llanee huhe,J3
' k. sascesshlMU)
B o
sl.B.I.I. 2a.4) and 4.6.I.l.2.wC parformed undee -lhLe AC.Tiod da}< ment {ae +he diese.l jeneMrs sobshs 4he. &s e.l 3 ers e.cu3c e 4e s*-l-
&&48d ELECTRI' CAL POWER S.YSTEMS reguireegts of.Ac riod shdemenf
- a..
~
LIMITING CONDITION FOR OPERATION N
ACTION (Continued)
Sc h ekbe M M d J G"C'M C 2.
Whe'n in MODE 1 2, or 3 with a steam pres ysuTer than 90,0
~
psig, the st m-driven auxiliary feed ter pump is OPERAB1.E.
If these condit ons are not satisfie ithin 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY wi hin the next ho and in COLD SHUTDOWN within the ~
following 30 ourj.,u;ta.6) yh a
d.
Wi of thehab 1 red offsite 4.C. circuits inoperab'le, demonstrate the OPERABILITY)ofAwe-1esel generators by performi.ng-Specfication4.8.1.1.2a.4)/within hours:nd :t 1:::t ei.a,,_
S'r t t ::f M unless the digsel genefators are already opera. ting;
~
restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
With only one offsite source restored, restore at least-twd'offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />sg
~
With-4woRof. the above required diesel generators inoperable, demonstrate e.
the OPERABILITY of two offsite A.C. circuits by performing Specifi,ca tion 4.8.1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 h6urs there, after; rest. ore at least one of the inoperable diesel ' generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY ~within the next 6 hourt and in COLO, SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.'
O Restore):t 1:::t tr diesei generators to OPERABLE, status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY. within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
f.
With a diesel generator' operating at greater than 5750 kW, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reduce the diesel generator output to less than or equal to 5750 kW.
g.
' With the Cathodic P.rotection Sy' stem inoperable, restore the System to'0PERABLE status within 10 days or prepare and submit a Spec'ial
- Report pursuant.to Specilication 6.9.2 outlining the. cause of the l
'irioperability and the plans for, restoring the System'.to OPERABLE.
~
l I
, SURVEILLANCE' REQUIREMENTS 4.8 1.1.1 Each of the above required independent circuits between the offsite transmission network and thynsite Essential Auxiliary Power System,shall be:
' Determined.0PERABLE at least once per 7 days by verifying correct a.
brerker alignments, indicated power availability, and b.
Demonstrated bPERABLE at. least once per 18 months '
by transferring (manually and automatically) unit power supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each diesel generator shall be desionstrated O'PERABLE:
In.accordance with the frequency specified in Table 4.8-1 on a a.
STAGGERED TEST BASIS by:
1)
Verifying the fuel level in the day tank, CATAWBA - UNITS 1 & 2
- 3/48-2
e No @@s 1s e.
. ELECTRICAL POWER SYSTEMS
' SURVEILLANCE REQUIREMENTS (Continued)
G h.
At least once per 10 years or after any modifications which could affect diesel generator interdependence by starting both dietel c
generators simultaneously, during shutdown,. and verifying that both diesel denerators accelerdte to at least 441 rpm in less than' or *"
~
equal to 11 seconds; and i.
At least once per 10 years by:-
1)
Draining' each fuel o*il. storage tank, removing the accumulatet!
sediment.and clehoing the tank using a sodium hypochlorite solution or its, equivalent, and 2)
Perfdrming a pressure test.oI those portions of the diesel fuel oil system designed to Section.III, subsection ND of the ASME Code at a test pressure equal to 110% of'the system design o
pressure.
3)
Performing tank wall thicknes.s measurements. The resulting data shall be evaluated and any abnormal degradation.will be justified or Any abnormal degradation will be documented % corrected.
a report to the Commission.
m 4.8.1.l.3 Reports - All diesel generator failures, ' valid or non-valid, shall be reported in a Special Report to the Commission pursuant to Specification 6.9.2 within 30 days.
Reports of diesel generator failures shall include the informa-tion recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revi-sion 1, August 1977.
)f the numbe'r of failures in the last 100 valid tests (on a per nuclear unit basis) is greater than or equal to 7, the report shall be supplemented to include the additional information recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977.
4.8.1.1.4 Diesel Generaf.or Batteries - h ch" diesel generator 125-volt batte'ry
~
bank and charger shall be demonstrated OPERABLE:
~
' g..
At least once per 7 days by verifying that:
a.
1)
The electrolyte level of each battsry is at or above the low gark and at or below the high mark, 2)
The overall. battery voltage is' greater than or equal to' 125 volts' on float' charge, and
~,
~
' 3).
T'he' individual cell voltage is greater than or equal td 1.36 volts on float' charge.**
b.
At least once per 92 days and within 7' days after a battery a discharge,with' battery terminal voltage below 110 volts, or battery overcharge with battery terminal voltage above 150 'v,olts,. by ver.ifyjng that:
a 1)
There is no visible corrosion it either' terminals or
' connectors, and-3 e
p
~
- Two.different cells shall be tested each month.
CATAWBA - UNITS 1 &-2 3/M8-7 t-a e'
.