Document Transmittal #. 86596 Date: 2/3/98 Tc:

NRC (DC DESK)

MAC: N/A Destination:

==

Description:==

Copy Copy Totals Document:

Revision:

Comment:

INFO CNTL * *STR AR0305 25 24 1

0 0

/

l l

t a

Instructions to the Addressee:

Pl:ase verity the document (s) received agrees with the above information.

Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.

The signature indicates acknowledgment of receipt of the above document (s) and that documents have been updated. Return signed and dated transmittal to Document Control within 15 working days of transmittal date to mail code:

NA1C Florida Power Corporation Document Control, NA1C yi-Crystal River Energy Complex l' Y".

u

  • -t 15760 W. Power une St.

a' 'i

, y, j v i Crystal River, FL 34428-67L3 Signature of Addressee:

Date:

9802110060 980202 PDR ADOCK 05000302 F

PDR

e Rev. 25 Effective Date d

INFORMATION ONLY ANNUNCIATOR RESPONSE AR-305 FLORIDA POWER CORPORATION l

CRYSTAL RIVER UNIT 3

(

ES E ANNUNCIATOR RESPONSE APPROVED BY:

Interpretation Contact

u.. L ~b A.- for n 'n f a

(SIGNATURE ON FILE)

DATE:

k IKTERPRETATION CONTACT:

Manager, Nuclear Plant Operations Support

O.

t TABLE OF CONTENTS SECTION.

PAGE 1.0.PUR20SE......................................,,,,,,,,,,,,,,,,,,,,,,,,,,,,1 L0_REEERENC ES.............................................................. 1 2.1 IMP _LEMENTING_ REFERENCES.............................................

1 2.2 DEVELOPMENTAL REFERENCES............................................

1 3.0 PERSONNEL INDOCTRINATIQN..........................................,,,,,,,2 LD._1NSIRUCIIQNS.............................

........................... 2 5.0 F01. LOW-UP__ACIIONS......................,,...............................

2 ENCLOSURES 1

An n u n c i a t o r R e s pon s e.............................................. 3

V l

(

\\

AR-305 Rev. 25 Page 1 l

.s.

__y

e-1.0' PUBEQ$1 r

1.1' EstablishareferencedocumentfoIeachAnnunciatorWindowonthe ES'(0)-JH2 Lampbox.

1.2 Establish operator actions for valid Annunciator ' alarms. on the ES (B)-3H2 Lampbox.

1.3 Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the ES(B)-JH2 Lampbox.-

2.0 REEEEEEES

~2.1 IBELEMENTING REFERENCES 2.1.1 EOP - EMERGENCY OPERATING PROCEDURE 2.1.2

-OP-703 - Plant Distribution System 2.1.3 OP-608 - OTSGs and Main Steam Systems j

2.1.4 OP-402 - Makeup and Purification Systems L

2.1. 5 -:

OP-417 - Containment Operating Procedure 2.1.6 AR-902'- DGB' Annunciator Response 2.1.7-OP-401 - Core Flood System 2.1.8 AP-770 - Emergency Diesel Generator Actuation

{

2.1.9 OP-707 - Operation of the ES Emergency Diesel Generator 2.2-DEVELOPMENTAL REFERENCES 2.2.1-INPO 90-021, Good Practice OP-217, Alarm Response Procedures 2.2.2-Annunciator Window Engraving Drawing E-224-048 2.2.3' MAR 94-07-07-01 CFT Level Setpoint 2.2.4.

REA #930926 regarding operation of the RB Main Fan Assemblies O

Al'-305 Rev. 25 Page 1 m

+

s.

)

JLO PERSONNEL IN00CTRINATIQN

.- 3.1 The Annunciator System is powered from VBDP-5 Breaker 28.

4.0 INSTRUCTIONS-

=4.1'-

Respond to alarms-on the'ES(B)-JH2 Lampbox as' indicated on-

-Enclosure 1.-Annunciator Response.

5.0 -

FOLLOW-UP ACTIQNS l.

None Ii.

l~O 4

O AR-305 Rev. 25' Page 2

=.

,O

'd ENCLOSURE.1 y.

(Page 1 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-01 E-01-01 g

RB SPRAY g

ES B l

ACTUATION -

I EVENT POINT 0936 INDICATED CONDITION:

o REACTOR BUILDING PRESSURE IS E30 PSIG AS SENSED BY TWO OUT OF THREE RB PRESSURE SWITCHES REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ES STATUS LIGHTS FOR RB SPRAY-i

o. BUILDING SPRAY PUMP IS RUNNING IF A RB SPRAY PERMISSIVE Is PRESENT o RB PRESSURE CONTROL BOARD INDICATOR BS-91-PI, BS-17-PI o COMPUTER POINT P-254 OPFRATOR ACTIONS FOR A VALID ALARM:

o REFER TO EOP DISCUSSION:

HPI ACTUATION THROUGH BLOCK 6 WILL GIVE A BUILDING SPRAY PERMIT l

REFERENCES:

DRAWING 208-028 SHEET ESB-70 SENSING ELEMENT: 63-Z1/RB-4,RB-5,RB-6 ES ACTUATION RELAYS O1 AR-305 Rev. 25 Page i

ENCLOSURE 1 (Page 2 of 52)

=ESE-ANNUNCIATOR RESPONSE ESB-J H2-01-02 E-01-02 RB SPRAY PP B TRIP EVENT POINT 0046 INDICATED CONDITION:

o BSP-1B BREAKER IS OPEN WITH CONTROL HANDLE IN iHE NORMAL AFTER START POSITION.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

's o GREEN LIGHT ON WITH A RED FLAG ON BSP-1B CONTROL STATION o ES STATUS LIGHT 4

j OPEPATOR ACTIONS' FOR A VALID ALARM:

o HAVE BREAKER CUBICLE CHECKED FOR DROPPED RELAY TARGETS DISCUSSION:

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS

REFERENCES:

DRAWING 208-009 SHEET BS-02 f,

SENSING ELEMENT: CS/SC, CS/0 (CONTROL SWITCH CONTACTS) 525, 52H

.(

AR-305 Rev. 25 Page 4 i

x

~

/]

(/

ENCLOSURE 1 (Page 3 of 52)-

l ESE ANNUNCIATOR RESPONSE ESB-]H2-01-03 E-01-03 1

RB SPRAY PP B MOTOR OVERLOAD I

EVENT POINT 0060-INDICATED CONDITION:

o MOTOR AMPS 1115% RATED LOAD REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

'd

-o.HIGH BUILDING SPRAY FLOW AS SEEN ON BS-01-FI2 o HIGH MOTOR AMPS o BSP-1B 1 RIP I

OPERATOR-ACTIONS FOR A VALID ALARM:

o THROTTLE-BSV-4 TO REDUCE LOAD ON BSP-1B o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS o IF LOAD REMAINS HIGH CONSIDER TRIPPING BSP-1B DISCUSSION:

THIS ALARM INDICATES THAT EITHER THE TIMED OVER CURRENT OR INSTANTANEOUS OVERCU3 RENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.

REFERENCES:

DRAWING 208-009' SHEET BS-02 SENSING ELEMENT: 51-IOC(INSTANTANEOUS) 51-TOC (TIMED) BREAKER CONTACTS N

AR-305 Rev. 25 Page.5

a

-4 4

D.

O ENCLOSURE 1 (Page 4 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-04 E-01-04 RB SPRAY PP B OUT OF SERVICE EVENT POINT 0045 INDICATED CONDITION:

o BSP-IB BREAKER IS RACKED OUT q

REDUNDANT INDICAh.

WHICH WILL VERIFY ALARM:

o NO INDICATING LIGHTS ON CONTROL STATION o NO ES STATUS INDICATION OPERATOR ACTIONS FOR A VALID ALARM:

I o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT DISCUdSION:

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS

REFERENCES:

DRAWING 208-009 SHEET BS-02

, SENSING ELEMENT: 52-H BREAKER CONTACT

%J e

AR-305 Rev. 25 Page 6

4 ENCLOSURE 1 r.

(Page 5 of 52)

}

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-04 E-01-04 R8 SPRAY PP 8 OUT OF SERVICE EVENT POINT 0062 INDICATED CONDITION:

o BSP-1B BREAKER HAS NO DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o NO INDICATING LIGHTS ON CONTROL STATION-o ES STATUS LIGHTS INDICATE BREAKER POSITION OPERATOR ACTIONS FOR A VA'_ID ALARM:

o VERIFY CLOSED DPDP-5B SWITCH 10

o. VERIFY DC KNIFE SWITCH FOR BSP-1B EREAKER CLOSED OISCUSSION:

THIS CONDITION DITABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING.

REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION, THIS IS AN EXPECTED ALARM FOR BREAKER TAGGING OPERATIONS.

i REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-009 SHEET BS-02 SENSING ELEMENT: 27C BREAKER RELAY U

AR-305 Rev. 25 Page 7

ENCLOSURE 1

(

(Page 6 of 52)

ESE ANNUNCI% TOR RESPONSE-ESB-JH2-01-05 E-01-05 RB SPRAY B-FLOW HIGHILOW EVENT POINT 0048 INDICATED CONDITION:

o BUILDING SPRAY FLOW IS 3x1400 GPM AS-MEASURED BY BS-1-FS2 FOR 30' SEC.

COINCIDENT WITH AN ES A(.TUATION REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

V o RB SPRAY FLOW INDICATOR BS-1-F12 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS-FOR A VALID ALARM:-

L.

o VERIFY PROPER OPERATION OF BSV-4, OPEN BSV-4 AS REQUIRED o VERIFY BSP-1B NOT TRIPPED

-DISCUSSION:-

.THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM.

TAKING LOCAL / AUTO CONTROL OF BSV-4 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER T0-SET THE FLOW RATE.~IF THIS DOES NOT __

' WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTi:MPTCD FROM THE CONTROL BOARD STATION.

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-1-FS2 AR-305 Pev. 25 Page 8

O, ENCLOSURE 1 (Page 7 of 52)

-ESE ANNUNCIATOR hESPONSE ESB-JH2-01-05 E-01-05 Rn SPRAY B FLOW HIGHILOW EVENT POINT 0050 INDICATED CONDITION:

o BUILDING SPRAY FLOW 15 t1700 GPM AS MEASURED B( BS-1-FS2, l

REDUNDANT. INDICATION WHICH WILL VERIFY ALARM:

-o RB SPRAY-FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS FOR A VALIO ALARM:

o VERIFY PROPER OPERATION OF BSV-4, THROTTLE BSV-4 AS REQUIRED TO REDUCE FLOW.

DISCUSSION:

i THE NORMAL BUILDING SPRAY PUMP FLOW DURING AN ES ACTUATION IS 1500 GPM.

TAKING LOCAL / AUTO CONTROL OF BSV-4 WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTF.MPTED FROM THE CONTROL BOARD STATION,

REFERENCES:

DRAWING 208-009 SHEET BS-11 EENSING ELEMENT: BS-1-FS2 AR-305 Rev. 25 Page 9

'B

c i.

ENCLOSURE 1 p.

(Page 8 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-05

-E-01-05 R8 SPRAv 8 -

FLOW HIGH/ LOW EVENT POINT 0064 INDICATED CONDITION:

o BUILDING SPRAY FLOW IS 31100 GPM AS MEASURED BY BS-82-FIS WITH DHV-43 OPEN REDUNDANTLINDICATION WHICH WILL' VERIFY ALARM:

o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS. FOR A VALID ALARM:--

o VERIFY PROPER OPERATION OF BSV-4, OPEN BSV-4~AS' REQUIRED o VERIFY BSP-1B N_OT TRIPPED._

DISCUSSION:

1THE-NORMAL BUILDING' SPRAY PUMP FLOW WHIL'c TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR THE' BUILDING SPRAY PUMP. 0PERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF..BSV-4,.THIS WILL ALLOW THE OFERATOR TO USE THE THUMBWHEEL ON

-THE VALVE-CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF'THE VALVE SHOULD BE ATTEMPTED'FROM THE CONTROL BOARD

STATION,

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT:.BS-82-FIS AR-305 Rev. 25 Page 10 i...-,....-..

.3.

J

e S

-l ENCLOSURE 1 (Page 9 of $2)

ESE ANNUNCIATOR RESPONSE ESB-JH2-01-05 E-01-05 RB SPHAY B FLOW HIGH/ LOW I

EVENT POINT 0066 INDICATED CONDITION:

o BUILDING SPRAY FLOW IS 21300 GPM AS MEASURED BY BS-82-FIS WITH DHV-43 OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

1 l \\ J o RB SPRAY FLOW INDICATOR BS-1-FI2 OR INDICATOR ON BSV-4 CONTROLLER OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF BSV-4, THROTTLE BSV-4 AS REQUIRED TO REDUCE FLOW DISCUSSION:

THE NORMAL BUILDING SPRAY PUMP FLOW WHILE TAKING A SUCTION FROM THE RB SUMP IS 1200 GPM, THIS IS TO INSURE ADEQUATE NET POSITIVE SUCTION HEAD FOR THE BUILDING SPRAY PUMP, OPERATION IN THIS MODE IS TAKING LOCAL / AUTO CONTROL OF BSV-4, THIS WILL ALLOW THE OPERATOR TO USE THE THUMBWHEEL ON THE VALVE CONTROLLER TO SET THE FLOW RATE. IF THIS DOES NOT WORK, THEN MANUAL CONTROL OF THE VALVE SHOULD BE ATTEMPTED FROM THE CONTROL BOARD

STATION,

REFERENCES:

DRAWING 208-009 SHEET BS-11 c-SENSING ELEMENT: BS-82-FIS ls) t' AR-305 Rev. 25 Page 11

... _ _ - _ _ _ _ _ = _ _ _ _ - _ _ _. - _ - _ _ -

O ENCLOSURE 1 (Page 10 of 52)

ESE' ANNUNCIATOR RESPONSE ESB-JH2-02-01 E-02-01 RB FAN 8 HIGH SPEED l

g TRIP I

I EVENT POINT 0352 -

INDICATED CONDITION:

o AHF-1B CONTROL HANDLE PUSHED IN. IN NORMAL AFTER START, AND HIGH SPEED WINDINGS NOT ENERGIZED.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

l o CREEN HIGH SPEED LIGHT W,_TH A RED FLAG ON CONTROL STATION, AND CONTROL HANDLE PUSHED IN.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTICATE CAUSE OF FAN TRIP o ENSURE TWO OPERABLE FANS ARE ES SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION:

THIS ALARM WILL OCCUR IF THE FAN IS RUNNING IN HIGH SPEED AND AN ES ACTUATION OCCURS. THIS-WILL TRIP THE FAN IN HIGH SPEED AND START.THE FAN IN SLOW SPEED.

SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS.

ENGINEERING CAN-MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION,

REFERENCES:

DRAWING 208-005 SHEET AH-29 SENSING ELEMENT: CS/IN, CS/SC, CS/0, 42/1F RELA

'/R-305 Rev. 25 Page 12

/'

ENCLOSURE-1 r

(Page 11 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-02-02 E-02-02 RB FAN 8 LOW SPEED TRIP EVENT POINT 0353-INDICATED CONDITION:

o AHF-1B CONTROL HANDLE PULLED OUT, IN NORMAL AFTER START, AND SLOW SPEED-WINDINGS NOT ENERGIZED.

[

REDUNDANT INDICATION WHICH WILL VE.'ITY ALARM:

o CREEN LOW SPEED LIGHT WITH A RED FLAG ON CONTROL STATION, AND THE CONTROL HANDLE PULLED OUT.

OPERATOR ACTIONS ~ FOR A -VALID ALARM:

o = INVESTIGATE CAUSE OF: FAN TRIP.

o ENSURE TWO OPERABLE FANS ARE ES' SELECTED PER OP-417 o MONITOR RB TEMPERATURE AND PRESSURE DISCUSSION:

-SOME THINGS TO CHECK AFTER A FAN TRIP ARE: FAN AND MOTOR TEMPS AS READ ON AH-1003-TIR ON THE BACK OF THE CONTROL BOARD OR FAN VIBRATION ALARMS.

-s ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANr.L IN THE IB 119' ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-29 SENSING ELEMcNT: CS/00T, CS/SC, CS/0, CONTROL SWITCH CONTACTS 42/1S

%_/

AR-305 Rev. 25 Page 13 i

ENCLOSURE 1 (Page 12 of 52) i

-ESE ANNUNCIATOR RESPONSE ESB-3H2-02-03 E-02-03 RB FAN B

- AIR FLOW LOW L

EVENT POINT 0354L INDICATED CONDITION:

o AHF-1B CONTROL HANDLE PUSHED IN AND IN NORMAL AFTER START AND LOW AIR FLOW IS SENSED BY AH-19-DPS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

)

o REACTOR BUILDING TEMPS ARE INCREASING AS SEEN-ON AH-536-TIR OPERATOR ACTIONS FOR A VALID ALARM:

o IF CONDITION CANNOT BE-CORRECTED THE'N _ CONSIDERATION SHOULD BE MADE TO SECURE THE FAN o ENSURE' TWO OPERABLE FANS ARE= ES SELECTED PER OP-417 o MONITOR RB 1EMPERATURE: AND PRESSURE DISCUSSION:

THIS ALARM MAY BE PRESENT WHEN AN ES ACTUATION HAS STARTED A PREVIOUSLY RUNNING FAN IN SLOW SPEED.-PLACING Tl!E CONTROL HANDLE IN THE PULL OUT NORMAL AFTER START POSITION SHOULD CLEAR THE ALARM ALSO IF THE FAN TRIPS THIS ALARM SHOULD ACTUATE.

REFERENCES:

DRAWING 208-005 SHEET AH-29 SENSING ELEMENT: AH-19-DPS AR-305 Rev. 25 Page 14

e.

Ob ENCLOSURE 1 y

(Page 13 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-02-04 E-02-04 RB FAN B VlBRATION HIGH -

?

EVENT POINT 0355 INDICATED CONDITION:

o AHF-18 HIGH VIBRATION CONDITION AS SENSED BY AH-20-ME1/2.

l-REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o FAN AND MOTOR TEMPS INCREASING ON AH-1003-TIR ON BACK OF CONTROL BOARD o IF FAN IS RUNNING IN SLOW SPEED THEN CURRENT ON THE FAN MAY BE OSCILLATING.

OPERATOR ACTIONS-FOR A VALID ALARM:

o ATTEMPT TO RESET ALARM BY DEPRESSING RESET-PUSHBUTTON ON CONTROL BOARD.

o-IF CONDITION CANNOT BE CORRECTED THEN CONSIDERATION SHOULD BE MADE TO

-SECURE THE FAN.

o ENSURE DO OPERABLE FANS ARE ES SELECTED PER OP-417 4

DISCUSSION:

ENGINEERING CAN MONITOR FAN VIBRATION AT AN EXTERNAL PANEL IN THE IB 119' ELEVATION.

REFERENCES:

DRAWING 208-005 SHEET AH-137 SENSING ELEMENT: AH-20-MEl, AH-20-ME AR-305'-

Rev. 25 Page 15

.o 0s 1

ENCLOSURE 1 (Page 14 of 52)

^'

g-ESE ANNUNCIATOR RESPONSE ESB-JH2-02-05 E-02-05 RBFANB' CONDENSATE HIGH EVENT POINT 1698 INDICATED CONDITION:

o AHF-1B CONDENSATE FLOW IS 21133 CC PER MINUTE AS SENSED BY AH-657-FIS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

L o REACTOR BUILDING SUMP RATE OF RISE IS INCREASING AS SEEN ON BS-93-PIR.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTICATE SOURCE OF CONDENSATE.

DISCUSSION:

SOME SOURCES OF HIGH CONDENSATION ARE:

-RCS LEAK IN CONTAINMENT - CHECK PZR LEVEL AND MAKE UP TANK LEVEL TRENDS; FEEDWATER/ MAIN STEAM LEAK IN CONTAINMENT - CHECK FEEDWATER FLOWRATES:

RB FAN COOLER SW LEAKS - CHECK SW SURCE TANK LEVEL IF ON SW, OR CI SURGE

' TANK LEVELS IF ON CI.

REFERENCES:

DRAWINC 208-005 SHEET AH-131 SENSING ELEMENT:AH-657-FIS AR-305 Rev. 25 Page 16

[V g

ENCLOSURE 1

-(Page 15 of 52)

ESB ANNUNCIATOR RESPONSE ESB-JH2-02-05 E-02-05 THIS AR IS ONLY USED WHEN COLD LEG N0ZZLE DAMS ARE INSTALLED PER MP-11QC RCSG-1B' NOZZLE DAM PROBLEM EVENT POINT 1698 INDICATED CONDITION:

o "B" SIDE N0ZZLE DAM CONTROL CONSOLE IS IN ALARM l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

O V

o N0ZZLE DAM PRESSURE E9 PSIG ON EITHER SEAL o N0ZZLE DAM PRESSURE 56.5 PSIG ON EITHER SEAL o N0ZZLE DAM AIR FLOW E9 SCFH o LOSS OF POWER TO THE CONTROL PANEL OPERATOR ACTIONS FOR A VALID ALARM:

o IMMEDIATELY INVESTIGATE SOURCE OF ALARM o REFER =TO E0P-11 DISCUSSION:

THIS ALARM INDICATES POSSIBLE N0ZZLE DAM SEAL DEGRADATION. IF THE SEAL FAILS, A REACTOR COOLANT LEAK WOULD DEVELOP, FLOODING THE PRIMARY SIDE OF THE STEAM GENERATORS WHERE PERSONNEL MAY BE AT WORK.

THIS EVENT POINT IS ONLY IN USE ON A TEMPORARY BASIS WHEN N0ZZLE DAMS ARE INSTALLED. THE WINDOW "RB FAN 8 CONDENSATE HIGH" IS REMOVED FROM THE ANNUNCIATOR PANEL WHEN THIS EVENT POINT IS IN EFFECT.

REFERENCES:

MP-110C SENSING ELEMENT: INTERNAL ALARM CIRCUITS INSIDE N0ZZLE DAM CONTROL CONSOLE AR-305 Rev. 25 Page 17 i

o T

ENCLOS.URE 1 (Page 16 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-02-06 E-02-06 l

l EC B l

ACTUATION

_ _ g ao=

EVENT POINT 1231 l

INDICATED CONDITION:

I o "B" ES ACTUATION SIGNAL ON ONE OR MORE ES CHANNELS REDUNDANT INDICATION.WHICH WILL VERIFY ALARM:

o-ES STATUS LIGHTS o ES BISTABLE TRIP INDICATORS-3 OPERATOR ACTIONS FOR A, VALID ALARM:

o REFER.TO E0P DISCUSSION:

THIS ALARM INDICATES THAT AT LEAST ONE OF'THREE CHANNELS OF "B" ES HAS ACTUATED. ANY HPI OR LPI BISTABLE TRIPPED WITH ES NOT BYPASSED, OR ANY 4 PSIG ES PRESSURE SWITCH ACTUATED WILL GIVE THIS ALARM. PLACING THE'RC PRESSURE TEST MODULE IN " TEST" DEFEATS THIS ALARM FROM LPI OR HPI. WHEN THE 4 PSIG TEST SWITCHES ARE IN THE " TEST" POSITION THIS ALARM IS DEFEATED FROM A 4 PSIG ACTUATION.

REFEREr4CES: DRAWING 208-028 SHEET ES-AB-05 SENSING ELEMENT: VARIOUS ES ACTUATION CONTACTS AR-305 Rev 25 Page 18

ENCLOSURE 1 c.

(Page 17 o'.52) s.

ESE ANNUNCIATOR RESPONSE ESB-JH2-03-01 E-03-01 REACTOR BLDG l

l PRESS I

l HIGH (2 PSIG) l I

I I

EVENT POINT 0067 INDICATED CONDITION:

o REACTOR BUILDING PRESSURE IS 12 PSIG AS SENSED BY BS-93-PS REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONTROL BOARD RB PRESSURE INDICATORS, BS-17-PI, BS-93-PIR o RB TEMP INDICATION AH-536 'i9 O

o COMPUTER POINT P254 OPERATOR ACTIONS FOR A VALID ALARM:

PROMPTLY TAKE ACTION TO REDUCE REACTOR BUILDING PRESSURE-AND PREVENT A 4 PSIG ES ACTUATION. CONSIDER ONE OR MORE OF THE FOLLOWING ACTIONS:

START SWP-1A AND/OR SWP-1B AND PLACE RB FANS ON SW COOLING.

o o START RWP-2A AND/OR RWP-28 o START ADDITIONAL RB FANS - OBSERVE THE FOLLOWING LIMITATIONS:

ENSURE ONLY 2 RB FANS ARE RUNNING DURING AN.ES ACTUATION.

DISCUSSION:

POSSIBLE SOURCES OF Hlu,1 RB PRESSURE ARE:

o LOSS OF RB FAN AND/OR COOLING WATER o STEAM AND/0R FEEDWATER LEAK-INSIDE CONTAINMENT o RCS-LEAK INSIDE CONTAINMENT o COMPRESSED AIR SYSTEM LEAKS INSIDE CONTAINMENT o INCREASED RB TEMP DUE TO RCS HEATUP, OR HIGH OUTDOOR TEMPS o HIGH RB FLOOD LEVEL IT IS RECOMMENDED TO RUN FANS IN SLOW SPEED 50 AS TO PRECLUDE MOTOR OVERLOAD IN A DENSE STEAM ATMOSPHERE AND RENDERING THEM UNAVAILABLE.

RUNNING SWP-1A AND SWP-1B SIMULTANEOUSLY FOR INCREASED SW FLOW TO FANS IS ACCEPTABLE AND WILL YIELD THE BEST RB COOLING PERFORMANCE.

l.

REFERENCES:

DRAWING 208-009 SHEET BS-11 SENSING ELEMENT: BS-93-PS AR-305 Rev. 25 Page 19

i i

[(

ENCLOSURE 1 -

(Page 18 of 52)

ESE ANNUNCIATOR RESPONSE:

ESB-JH2-03-02 E-03-02 REACTOR BLDG TEMP HIGH -

EVENT POINT 1700 INDICATED CONDITION:

l

- o REACTOR BUILDING TEMPERATURE IS tI23.6' F AS SENSED BY AH-536-TY4 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RB TEMP INDICATION AH-536-TIR

(

o THE AVERAGE OF COMPUTER POINTS: 5358, 5359, S382, 5383 o COMPUTER POINT 5837 OPERATOR ACTIONS FOR A VALID ALARM:

TO REDUCE THE REACTOR BUILDING TEMPERATURE CONSIDER ONE OF THE FOLLOWING ACTIONS:

START SWP-1A AND/0R SWP-1B AND PLACE RB FANS ON SW C00 LING' o

o START RWP-2A AND/OR RWP-2B START ADDITIONAL RB FANS - OBSERVE THE FOLLOWING LIMITATIONS:

o ENSURE ONLY 2 RB FANS ARE RUNNING DURING AN ES' ACTUATION DISCUSSION:

POSSIBLE SOURCES OF HIGH RB TEMPERATURE ARE:

o LOSS OF RB FAN AND/OR COOLING WATER o STEAM AND/OR FEEDWATER LEAK INSIDE CONTAINMENT o kCS LEAK INSIDE CONTAINMENT o RCS HEATUP OR~HIGH OUTDOOR TEMPS RUNNING SWP-1A AND SWP-1B SIMULTANEOUSLY FOR INCREASE 0 SW FLOW TO FANS IS ACCEPTABLE AND WILL YIELD THE BEST RB COOLING PERFORMANCE.

-REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

\\

REFERENCES:

DRAWING 208-005 SHEET AH-131 SENSING ELEMENT: AH-536-TY4 AR-305 Rev. 25 Page 20

L O

ENCLOSURE 1 YV e

(Page 19 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-04-01 E-04-01 i

I I

MAKEUP PP C I

l j

TRIP l

l l

EVENT POINT 1047 INDICATED CONDITION:

o MVP-1C BREAKER IS OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION REDUNDANT INDICATION UHICH WILL VERIFY ALARM:

O o CREEN LIGHT ON WITH A RED FLAG ON MVP-1C CONTROL STATION o L STATUS LIGHT OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-402 FOR RESTORATION OF.RCP SERVICES PRIOR TO STARTING ANOTPER MVP o CONSIDER MINIMIZING LETDOWN FLOW o INVESTIGATE MVP-IC BREAKER FOR DROPPED RELAY TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP-DISCU:, ION:

EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY'HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-04 SENSING ELEMENT: CS/SC, CS/0, 52H/A, 525/B AR-305 Rev. 25 Page 21-

i Os ENCLOSURE 1 c

(Page 20 of 52)

ESE ANNUNCIATOR RESPONSE ESA-JH2-04-02 E-04-02 MAKEUP PP C GEAR OlL PRESS LOW EVENT POINT 1059 INDICATED CONDITION:

o MVP-IC BREAKER CLOSED E2 SECO#DS WITH GEAR OIL PRESS,<7 PSIG AS SENSED BY MU-90-PS.

I P.EDUNDANT INDICATION WHICH WILI. VERIFY ALARM:

o MVP-SC BACK UP CEAR OIL PUMP AUTO STARTS o COMPUTER POINT XO69 OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY MVP-SC DC ACK UP GEAR OIL PUMP STARTED o MONITOR MVP-1C VIA COMPUTER GROUP 72 DISCUSSION:

CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKE UP PUMPS PER OP d.02

REFERENCES:

DRAWING 208-041 SHEET MU-51 SENSING ELEMENT: 2MVP-SC, MU-90-PS, 525/A AJ AR-305.

Rev. 25 Page 22

-. _ - ~ _ _. _. _ _

i O

'r fACLOSEE_l (Page 21 of $2)

ESE ANNUNCIATOR RESPONSE ESB-JH2-04-03 E-04-03 MAKEUP PP C MOTOR OVERLOAD I

4 1

EVENT POINT 1045 l

INDICATED CONDITION:

o MVP-IC MOTOR AMPS 1115% RATED LOAD REDUNDANT INDICATION WHICH WILL VERIFY l.LARM:

OO o HIGH MOTOR AMPS o MVP-1C TRIP o hICH FLOWRATES THROUGH MVP-1C OPERATOR ACTIONS FOR A VALID ALARM:

o TRIP MVP-1C o 4 AVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS DISCUSSION:

THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR' INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED. INSTANTANEOUS OVERCURRENT PROTECTIVE RELM ACTUATION WILL TRIP THE BREAKER.

IT IS POSSIBLE TO HAVE THIS ALARM PRIOR-TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-041 SHEET MU-49

~

SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE AR-305 Rev. 25 Page 23

[

I

/

ENCLOSURE 1

(

f.

(Page 22 cf $2) t ESE ANNUNCIATOR RESPONSE ESB-JH2-04-04 E-04-04 1

MAKEUP PP C -

i Lb8E OlL PUMP TRIP EVENT POINT 1050 INDICATED CONDITION:

o MVP-2C CONTROL HANDi.E IN NORMAL AFTER START POSITION WITH THE MOTOR NOT -

ENERGIZED.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT.WITH A RED FLAG ON CONTROL STATION o LOW LUBE OIL PRESSURE ALARM

]

o MVP-3C, BACK-UP LUBE OIL PUMP, AUTO START l

.k f

OPERATOR ACTIONS FOR A VALID ALARM o ENSURE-MVP-3C, BACK-UP LUBE OIL PUMP, STARTED DISCUSSION:

THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.

l MONITOR THE MAKE-UP PUMP VIA COMPUTER GROUP 72.

CONSIDERATION SHOULD BE GIVEN TO SWAPPING PAKE-UP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-07 SENSING ELEMENT: CS/SC, CS/0, 42B AR-305 Rev. 25 Page 24

l O

ENCLOSURE 1 (Page 23 of $2)

ESE ANNUNCIATOR RESPONSE ESB-JH2-04-04 E-04-04 MAKEUP PP C LUBE OIL PUMP TRIP t

i EVENT POINT 1056 INDICAIED CONDITION:

o MVP-3C CONTROL HANDLE IN THE NORMAL AFTER START POSITION WITH THE MOTOR NOT ENERGIZED.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT WITH A RED FLAG ON CONTROL STATION i

o MAKEUP PUMP OIL PRESSURE LOW ALARt1 o COMPUTER POINT XO69 OPERATOR ACTIONS FOR A VALID ALARM:

0 MONITOR MJP-IC BEARING TEMPS DISCUSSION:

THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.

MONITOR THE MAKEUP PUMP VIA COMPUTER GROUP 72.

CONSIDERATION SHOULD BE GIVEN TO SWAPPING MAKEUP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-32 SENSING ELEMENT: CS/SC, CS/0, CR1 AR-305 Rev. 25 Page 25

e 1

[NCLOSURE 1 (Page 24 of 52) y

(.SE ANNUNCIATOR RESPONSE ESB-JH2-04-06 E-04-06 4

l I

I I

AUX STEAM 180 l

f (ASV 196)-

SYPASSED 1

EVENT POINT 1961 INDICATED CONDITION!

o CONTROL SWITCH FOR ASV-196 AUX STEAM SOLENOID VALVE IS IN THE OPEN/ BYPASS POSITION, REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ASV-196 SELECTOR SWITCH POSTTION OPERATOR ACTIONS FOR A VALID ALARM

.o REFER TO OP-608 A

DISCUSSION:

THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-196 ON HICH

-TEMPERATURE OR LOW AUX STEAM PRESSURE IS DISABLED. THIS IS A HICH 1

ENERGY LINE BREAK CONCERN,

REFERENCES:

DRAWING 208-008 SHEET AS-05 SENSING ELEMENT: CS/NC

-AR-305 Rev. 25 Page 26

l

[

ENCLOSURE __1-(Page 25 of $2)

ESE ANNUNCIATOR RESPONSE

-ESB-JH2-05-02 E-05-02 MAKEUP PP C LUSE Olt PRESS LOW EVENT POINT 1043 INDICATED CONDITION:

o LUBE OIL PRESS AS SENSED BY MU-48-PS3 IS 53 PSIG.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM o MUP-3C, BACK UP LUBE OIL PUMP, AUTO STARTS OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MUP-3C HAS STARTED DISCUSSION:

THIS ALARM INDICATES INADEQUATE LUBRICATION FOR MVP-IC. IF THE PUMP IS RUNNING, IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP PLACED IN SERVICE. REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.

REFERENCES:

DRAWING 208-041-SHEET MU-01 SENSING-ELEMENT: 43/3C MU-42-PS3

-AR-305 Rev. 25 Page 27 am

~

l N(d ENCLOSURE 1 (Page 26 of 52) 7 ESE ANNUNCIATOR RESPONSE ESB-JH2-05-03 E-05-03

{

f MAKEUP PP C LUBE OIL PUMP AUTO START EVENT POINT 1055 INDICATED CONDITION:

o MVP-3C CONTROL HANDLE IN THE NORMAL AFTER STOP POSITION AND MOTOR IS ENERGIZED REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT ON WITH A CREEN FLAG ON MVP-3C CONTROL STATION o COMPUTER POINT X069 OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MVP-3C IS RUNNING DISCUSSION:

THIS ALARM IS AN INDICATION OF INADEQUATE LUBRICATION TO THE MAKE-UP PUMP.

MONITOR THE MAKE-UP PUf1P VIA COMPUTER GROUP 72. CONSIDERATION SHOULD BE GIVING TO SWAPPING MAKE-UP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-32 SENSING ELEMENT:

CS/ST, CS/ST, CS/0, CR1 l

l AR-305 Rev. 25 Page 28 i.,

O ENCLOSURE 1 (Page 27 of $2)

ESE ANNUNCIATOR RESPONSE ESB-JH2-05-04 E-05-04 i

MAKEUP PP C OUT OF SERVICE EVENT POINT 1044 INDICATED CONDITION:

o MVP-1C BREAKER HAS NO DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o N0_ INDICATING LIGHTS ON CONTROL STATION.

o ES STATUS LIGHTS INDICATE BREAKER POSITION.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY CLOSED DPDP-5B SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MVP-1C BREAKER CLOSED DISCUSSION:

THIS CONDITION DISABLES REMOTE BREAKER OPERATION AND PROTECTIVE RELAYING.

REFER TO OP-703 FOR INSTRUCTIONS ON LOCAL BREAKER OPERATION.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-04

=

SENSING ELEMENT: RELAY-27C LOCATED INSIDE BREAKER CUBICLE FOR MVP-1C AR-305 Rev. 25 Page 29

~ _. _.. _ _. _. _

O ENCLOSURE 1 i

r (Page 28 of.52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-05 04 E-05-04 4

i i

MAKEUP PP C OUT OF SERVICE EVENT POINT 1046

^

INDICATED CONDITION:

o MVP-1C BREAKER IS RACKED OUT AND MVP-1C IS SELECTED FOR ES START

~

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o NO~ INDICATING LIGH1S ON CONTROL STATION o NO ES STATUS INDICATION i

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE THE CAUSE FOR BREAKER BEING RACKED OUT DISCUSSION:

TWO PUMPS SHOULD BE SELECTED FOR ES START.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-01 SENSING ELEMENT: 43/3C C'JBICLE 385. 52H/b CUBICLE 385 FOR MVP-1C AR-305' Rev. 25 Page 30

ENCLOSURE 1 i

7 (Page 29 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-05-06 E-05-06

~

I I

AUX STEAM 180 l

(ASV. 6 96)

AUTO CLOSED EVENT POINT 1817 INDICATED CONDITION:

I o-CONTROL SWITCH FN ASV-196 AUX STEAM SOLEN 0ID VALVE IS IN THE AUTO POSITION AND THE VALVE IS CLOSED.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ASV-196 SELECTOR SWITCH IN AUTO o GREEN INDICATOR LIGHT ON SELECTOR SWITCH OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO OP-608 DISCUSSION:

THIS ALARM INDICATES THAT THE AUTOMATIC CLOSURE OF ASV-196 ON EITHER LOW AUX STEAM PRESSURE OR HIGH AUX STEAM PRESSURE HAS OCCURRED. A LOW PRESSURE ACTUATION OCCURS AT <100 PSIG AND A HIGH PRESSURE ISOLATION OCCURS AT >250 PSIC AUX STEAM HEADER PRESSURE IN THE AUX BUILDING.

REFERENCES:

DRAWING 208-008 SHEET AS-05 SENSING ELEMENT: 3ASV-196-SV1, 33C/ASV-196-SV, AS-36-PS1,AS-3C-PS3

.O AR-305 Rev. 25 Page 31

l ENCLOSURE 1 p

(Page 30 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-06-01 E-06 ____

-.exem-muuma--

-p MAKEUP PP B l

l I

TRIP l

l I

I EVE.'4T POINT 1101 INDICATED CONDITION:

o MVP-1B BREAKER OPEN WITH CONTROL HANDLE IN NORMAL AFTER START POSITION.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT,0N WITH A RED FLAG ON MVP-1B CONTROL STATION.

o ES STATUS LIGHT.

OPERATOR ACTISNS FOR A VALID ALARM:

o REFER TO OP-402 FOR RESTORATION OF RCP-SERVICES PRIOR TO STARTING ANOTHER MVP o CONSIDER MINIMIZING LETDOWN FLOW o INVESTICATE MVP-1B BREAKER FOR DROPPED TARGETS o START ANOTHER MAKE-UP PUMP PER OP-402 IF CAUSE OF THIS TRIP WILL NOT TRIP ANOTHER PUMP DISCUSSION:

EXERCISE CARE WHEN STARTING ALTERNATE MU PUMPS. ENSURE ANY FAILURES SUCH AS IMPROPER FLOWPATH, WHICH MAY HAVE DIRECTLY OR INDIRECTLY HAVE CAUSED THIS PUMP TO TRIP DO NOT CAUSE ALTERNATE PUMPS TO TRIP AFTER THEY ARE STARTED.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-041 SHEET MU-13 O

SENSING ELEMEht: CS/SC, CS/0, 52H/A, 525/B AR-305-

-Rev. 25 Page 32

A k

ENCLOSURE 1 (Page 31 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-06-02 E-06-02 MAKEUP PP B LUBE OlL PRESS LOW EVENT POINT 1097 INDICATED CONDITION:

o LUBE.0IL PRESSURE AS SENSED BY MU-45-PS3 IS $3 PSIG.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o MVP-3B BACK UP LUBE OIL PUMP AUTO STARTS OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE MVP 3B HAS STARTED DISCUSSION:

THIS ALARM INDICATES INADEQUATE LUBRICATION FOR MUP-18. IF THE PUMP IS RUNNING IT SHOULD BE SECURED AND AN ALTERNATE MAKEUP PUMP PLACED IN SERVICE. REFER TO OP-402 FOR DIRECTIONS ON STARTING MAKEUP PUMPS.

REFERENCES:

DRAWING 208-041 SHEET MU-02 SENSING ELEMENT: 43CS/3B7-3B, MU-45-PS3

=

AR-305 Rev. 25 Page 33

,,.._...s.

b MCLOSURE 1

(

y (Page 32 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-06-03 E-06-03 MAKEUP PP B MOTOR OVERLUAD EVENT POINT 1099 l

INDICATED CONDITION:

o MVP-1B MOTOR AMPS E115% RATED LOAD.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o HIGH MOTOR AMPS o MVP-1B TRIP o HIGH FLOWRATES THROUGH MVP-1B OPERATOR ACTIONS FOR A VALID ALARM:

o TRIP MVP-1B o HAVE BREAKER CUBICLE CHECKED FOR DROPPED TARGETS DISCUSSION:

THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED, INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.

-IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-041 SHEET MJ-13 SENSING ELEMENT: 51 RELAY INSIDE BREAKER CUBICLE

-AR-305 Rev. 25 Page 34

(

11CLOSEI_1 i_ 1 (Page 33 of 52) y ESE ANNUNCIATOR RESPONSE ESB-JH2-06-04 E-06-04 l

NU4KEUP PP B OUT OF SERVICE I

EVENT POINT 1098 INDICATED CONDITION:

o MVP-IB BREAKER HAS NO DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

(

)

(__ /

o NO INDICATING LIGHTS ON CONTROL STATION o E5 STATUS LIGHTS INDICATE BREAKER POSITION OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY CLOSED DPDP-58 SWITCH 10 o VERIFY DC KNIFE SWITCH FOR MVP-1B BREAKER CLOSED DISCUSSION:

THIS CONDITION DISABLES REMOTE BREE OPERATION AND PROTECTIVE RELAYING REFER TO OP-703 FOR LOCAL BREAKER OP i'.ON. THIS IS AN EXPECTED ALARM FOR i

BREAKER TAGGING OP~ RATIONS.

REFER TO T5 FOR ADis_.41STRATIVE REQUIREMENTS.

REFERENCES:

ORAWING 208-041 SHEET MU-02 SENSING ELEMENT: RELAY 27C LOCATED INSIDE BREAKER CUBICLE FOR MVP-1B

(~~x,

.,Y AR-305 Rev. 25 Page 35

O ENCLOSURE 1 p

(Page 34 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-06-04 E-06-04 MAKEUP PP B l

OUT OF SERVICE EVENT POINT 1100 l

INDICATED CONDITION:

o MUP-18 BREAKER IS RACKED OUT AND MVP-1B IS SELECTED FOR ES START, REDUNDANT INDICATION WHICH WILL VERIFY ALARM o NO INDICATING LIGHTS ON CONTROL STATION.

o NO ES STATUS INDICATION OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTICATE THE CAUSE FOR THE BREAKER BEING RACKED OUT DISCUSSION:

' NMO PUMPS SHOULD BE SELECTED FOR ES START.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

- DRAWING 208-041 SHEET-MU-13 SENSING ELEMENT: 43/3B ON CUBICLE-385. 52H/B IN CUBICLE 384

(

AR-305 Rev. 25 Page 36

(

ENCLOSVEE_1 f.

(Page 35 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-07-06 E-07-06 l

l I

I H2 SAMPLING l

l PANEL B TROUBLE 1

EVENT POINT 0256 INDICATED CONDITION:

o PASS RB H2 ANALYZER "B" MALFUNCTION o HIGH RB H2 CONCENTRATION REDUNDANT INDIC/" ^" WHICH WILL VERIFY ALARM:

o LOSS OF POP FANEL o OVERPRESSF PANEL AT 24 PSIG o LOW FLOW lu :.NEL AT 51 SCFH o THERM 0 ELECTRIC COOLER 50.1 AMPS o RB H2 CONCENTRATION h3%

OPERATOR ACTIONS FOR A VALID ALARM:

o NOTIFY NSS/NSM AND EC OF HYDROCEN CONCENTRATION AND REFER TO EM-225A, POST ACCIDENT RB HYDROGEN CONTROL o VERIFY PROPER VALVE LINEUP PER OP-417 o NOTIFY I&C SUPERVISION OF H2 ANALY2ER MALFUNCTION DISCUSSION:

'.15 ALARM INDICATES EITHER THE POST ACCIDENT H2 CONCENTRATION INSIDE THE j RB IS HIGH, OR THE PASS H2 ANALYZER IS MALFUNCTIONING.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

~

REFERENCES:

DRAWING 208-062 SHEET WS-06 SENSING ELEMENT: VARIOUS FLOW / PRESSURE / CURRENT SWITCHES INSIDE THE SAMPLER i

AR-305 Rev. 25 Page 37 n

I

')

ENCLOSURE 1 i._/

(Page 36 of $2)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-01 E-08-01 DIESEL GEN B FAILED TO START EVENT POINT 1208 INDICATED CONDITION:

"B" ECDG HAS A START COMMAND AND LUBE OIL PRESSURE AS SENSED BY o

DL-10-PS IS 56 PSIG AFTER 7 SECONDS OR l

"B" ECDC HAS A START COMMAND AND ENGINE SPEED AS SENSED BY EG-20-SS o

15 $250 RPM AFTER 7 SECONDS

,(

3 i

J REDJNDANT INDICATION WHICH WILL 'JERIFY ALARM:

o ECDG-1B TRIPS o CONTROL BOARD " CRANK" LIGHT GOES OUT AND WHITE " READY" LIGHT DOES NOT COME ON o ECDG-1B STARTING AIR PRESSURE LOW ALARM ANNUNCIATES OPERATOR ACTIONS FOR A VALID ALARM:

INSPECT ECDG-1B FOR CAUSE OF FAILURE TO START o

o RESET PUSHBUTTON MUST BE DEPRESSED ON ECDC GAUGE BOARD PRIOR TO EGDG RESTART.

DISCUSSION:

THIS ALARM INDICATES THE DIESEL TRIED TO START AND DID NOT. SOME POSSIBLE CAUSES OF THIS t.RE: PROBLEMS WITH DIESEL FUEL SYSTEM, LUBE OIL SYSTEM PROBLEMS OR DIESEL SPEED SENSOR PROBLEMS. THIS ALARM IS STILL ACTIVE WITH AN ES SIGNAL PRESENT BUT WILL NOT DE-ENERCIZE THE STARTING AIR SOLENOIDS, 50 THE DIESEL WILL CRANK UNTIL IT EITHER STARTS OR RUNS OUT OF AIR.

7 i

REFERENCES:

DRAWING 208-027 SHEET EG-16, EG-02, EG-04, EG-06 J

SENSING ELEMENT: DL-10-P3, DL-20-SS, START FAIL RELAY AR-305 Rev. 25 Page 38 r

4 O

ERCLOSURE 1 f.

(Page 37 of $2)

ESE ANNUNCIATOR RESPONSE ESB-3H2-08-01 E-08-01 i

i I

---eussumesseemsesammaussaamammmunesem DIESEL GEN B

- l l

FAILED l

g TO START I

I I

EVENT POINT 1215 INDICATED CONDITION:

o "B" ECDC HAS TRIPPED IT'S PHASE DIFFERENTIAL CURRENT RELAY o "B" EGDG TRIPS AND BREAKER 3210 OPENS l

o "B" EGDG 86 LOCKOUT RELAY HAS ACTUATED REDUNDANT INDICATION WHICH WILL VERIFY ALAR'4:

o "B" ES 4160V BUS DE-ENERGIZES o CONTROL BOARD "RUN" LIGHT COES OUT OPERATOR ACTIONS FOR A VALID ALARM:-

o REFER TO AP-770 o INSPECT ECDG-1B FOR CAUSE OF DIFFERENTIAL CURRENT CONDITION o LOCKOUT RELAY MUST BE MANUALLY RESET ONCE PROBLEM IS RESOLVED.

DISCUSSION:

THIS ALARM INDICATES THE DIESEL CENERATOR HAS EITHER, A OHASE TO PHASE SHORT OR A PHASE TO GROUND SHORT. THIS CONDITION WILL TRIP THE DIESEL AND PREVENT IT FROM STARTING. THE CAUSE OF THIS PROBLEM MUST BE RESOLVED PRIOk TO ANY ATTEMPT BEING MADE TO RESTART AND RELOAD THE DIESEL GENERATOR.

REFERENCES:

DRAWING 208-027 SHEET EG-16

-SENSING ELEMENT:--86-DG-3B, ~ 87Ai 878, 87C DIFFERENTIAL CURRENT RELAYS AR-305 Rev. 25 Page 39 s

j I

ENCLOSURE 1 (Page 38 of 52) r ESE ANNUNCIATOR RESPONSE ESB-)H2-08-02 E-08-02 DIESEL GEN C TROUBLE EVENT POINT 1203 hNDICATEDCONDITION:

o "B" ECDG LUBE OIL TEMP AS SENSED BY DL-12-TS IS $115'F QB o "B" ECDG JACKET COOLANT TEMP AS SENSED BY DJ-29-TS $130*F I

REDUNDANT INDICATION WHICH h7LL VERIFY ALARM:

LOCAL TEMP INDICATION FOR LUBE OIL OR JACKET COOLANT TEMPS LOW o

DIESEL GENERATOR ALARM PANEL DROP TARGET FOR LOW LUBE OIL / JACKET COOLANT o

TEMP.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE PROPER OPERATION OF LUBE OIL HEATERS DLHE-4 o ENSURE PROPER OPERATION OF JACKET COOLANT HEATER DJHE-2 o REFER TO OP-707 DISCUSSION:

EGDG LUBE OIL TEMP MUST BE MAINTAINED >110* F FOR OPERABILITY

-REQUIREMENTS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-08 O

SENSING ELEMENT:-DL-12-TS DJ-29-TS 4

AR-305' Rev. 25 Page 40

O ENCLOSURE 1 (Page 39 of $2) i ESE ANNilNCIATOR RESPONSE ESB-3H2-08-02 E-08-02 l

l DIESEL GEN B TROUBLE I

EVENT POINT 1209 INDICATED CONDITION:

o "B" EGDG LOCAL ALARM PANEL HAS A DROPPED TARGET REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INFORMED BY THE AUX BUILDING OPERATOR OF ECDC-1B LOCAL ALARM PANEL DROP TARGET.

OPERATOR ACTIONS FOR A VALID ALARM:

o REFER TO AR-902 DISCUSS'"N:

THIS ALARM INDICATES A DIESEL GENERATOR LOCAL ANNUNCIATOR DROP TARGET HAS DROPPED. IMMEDIATE INVESTIGATION OF ALARM CAUSE SHOULD BE INITIATED.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-18 SE;4 SING ELEMENT: VARIOUS SENSORS ASSOCIATED WITH LOCAL ALARM PANEL AR-305' Rev. 25 Page 41 i

{

t

I O

ENCLOSURE __1 f..

(Page 40 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-03 E-08-03 DIESEL GEN B OUT OF SERVICE EVENT POINT 1197 INDICATED CONDITION:

o "B" ECDG HAS HAD A LOSS OF DC CONTROL POWER REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

I L

ECDG-18 STARTS WITH NO AUTO START SIGNAL o

ECDG-1B CONTROL CIRCUIT INDICATOR LIGHTS ON MAIN CONTROL BOARD OR INSIDE o

THE DIESEL CENERATOR ROOM ARE OFF 4

OPERATOR ACTIONS FOR A, VALID ALARM:

o VERIFY DPDP-6B SWITCHES 12 AND 14 ARE CLOSED o CHECK ECDG-1B CONTROL POWER FUSES o REFER TO OP-707 DISCUSSION:

A LOSS OF DC CONTROL POWER WILL AFFECT THE DIESEL DIFFERENTLY DEPENDING ON WHICH CIRCUIT LOSES POWER. IF ALL DC POWER IS LOST THE DIESEL WILL ' START AND YOU WILL ONLY BE' ABLE TO SHUT IT DOWN LOCALLY BY TRIPPING THE FUEL RACKS. IF OTHER FUSES ARE BLOWN THE EFFECT WILL VARY FROM LOSS OF GOVERN 00, CONTROL TO A LOSS OF PROTECTIVE RELAYING ASSOCIATED WITH THE DIESEL. THE CAUSE OF THIS ALARM SHOULD BE INVESTIGATED IMMEDIATELY.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-18 EG-04, EG-10, EG-06, EG-16 SENSING ELEMENT: A,B C.D.E. LOSS OF POWER RELAYS AR-305 Rev. 25 Page 42

)

1

)

O.

ENCLOSURE 1 V

(Page 41 of $2)

ESE ANNUNCIATOR RESPONSE

. l ESB-JH2-08-03 E-08-03 DIESEL GEN 8 OUT OF SERVICE EVENT POINT 1210 INDICATED CONDITION:

o "B" ECDG START AIR AS SENSED BY EG-12-PS IS 3225 PSIG O

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF LOW AIR PRESSURE ALARM.

o VERIFY ECDG-1B AIR COMPRESSOR, ECP-1B RUNNING o CHECK ECDG-1B FOR AIR LEAKS DISCUSSION:

A LOSS OF STARTING AIR WILL EVENTUALLY CAUSE THE DIESEL TO START WHEN PRESSURE IS NO LONGER HIGH ENOUGH TO HOLD THE AUTO START VALVES CLOSED. IF EGP-1B IS OUT OF SERVICE THEN CONSIDERATION SHOL'LD BE GIVEN TO CROSS CONNECTING THE DIESEL START AIR SYSTEMS BY OPENING EGV-25 AND EGV-26.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

p

REFERENCES:

- DRAWING 208-027 SHEET-EG-18. EG-08 SENSING ELEMENT: EG-12-PS AR-305 Rev. 25 Page 43

O ENCLOSURE 1 f.

(Page 42 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-03 E-08-03

)

i DlESEL, GEN 8 l

OUT OF SERVICE i

EVENT POINT 1211 INDICATED CONDITION:

o ANY "B" ECDG AUTO / MANUAL CONTROL SWITCH NOT IN THE AUTO POSITION REDUNDANT INDICATION WHICH-WILL VERIFY ALARM:

o NOTIFIED.BY. PRIMARY PLANT OPERATOR ECDC-1B CONTROL SWITCH NOT IN AUTO OPERATOR ACTIONS FOR A VALID ALARM:

o NOTIFY PRIMARY PLANT OPERATOR TO RETURN CONTROL SWITCH TO AUTO DISCUSSION:

THE FOLLOWING SWITCHES NOT IN AUTO WILL GIVE YOU THIS ALARM:

JACKET COOLING PUMP JACKET COOLANT HEATER STANDBY LUBE OIL PUMP DC FUEL OIL PUMP DC FUEL OIL XFER PUMP AC FUEL OIL XFER PUMP AC AIR COMPRESSOR DIESEL AUT0/ MAN (MCB)

NORMAL /AT ENGINE SWITCH ON DIESEL GAUGE BOARD IN "AT ENGINE" REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-027 SHEET EG-18 EG-08 SENSING ELEMENT: VARIOUS EGDG-1B CONTROL SWITCH CONTACTS

_=

=

AR-305 Rev. 25 Page 44

Y ENCLOSURE 1 r

(Page 43 of $2)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-04 E 08-04 l

CF TANK B LEVEL HIGHILOW EVENT POINT 0117 INDICATED CONDITION:

o CFT-1B LEVEL AS SENSED BY CF-2-LS3 IS h13'4" REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

[~'

o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 t

\\

o COMPUTER, POINT P201 OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSF AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

A HICH CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD CHECK VALVES LEAKING-BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. ALSO CORE FLOOD ADDITION VALVES MAY BE LEAKING BY.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS3

~

'J

~AR-305 Rev. 25 Page 45

+

i k)

/~

ENCLOSURE 1 sJ r

(Page 44 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-04 E-08-04 i

CF TANK B LEVEL HIGH/ LOW EVENT POINT 0118 INDICATED CONDITION:

o CFT-1B LEVEL AS SENSED BY CF 2-LS4 IS E13'4" REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

O o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 o COMPUTER. POINT P201 OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION,

DISCUSSION:

A HICH CORE FLOOD TAhX LEVEL MAY INDICATE CORE FLOOD CHECK VALVES LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY. ALSO CORE FLOOD ADDITION VALVES MAY BE LEAKING BY.

REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS4

=-

=-

AR-305 Rev. 25 Page 46

r O

ENCLO50%,,1 (Page 45 of 52)

E!,_NNUNCIATOR RESPONSE ESB-3H2 08 E-05-04 1

CF TANK B i

LEVEL

' HIGH/ LOW 4

EVENT POINT 0119 4

-INDICATED CONDITION:

o CFT-1B LEVEL AS SENSED BY CF-2-LS3 IS sI2'3" REDUNDANT INDICATION WHICH WILL VERIFY-ALARM:

1O o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 V

o COMPUTER POINT P201.

i OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS. CONDITION ~

i DISCUSSION:

A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION T.S ARE LEAKING BY, OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER. LEVEL TO

I FY.

ALSO CORE FLOOD SAMPLE VALVES MAY BE LEAKING BY, REFER.TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRA5NG208-015 SHEET CF-13 SENSING ELEMENT: CF-2-LS3 AR-305 Rev. 25 Page 47

/

ENCLOSURE 1 7

(Page 46 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-04 E-08-04 CF TAJWK 8 LEVEL

{

Hl0HILOW

,I l

EVENT POINT 0120 INDICATED CONDITION:

o CFT-IB LEVEL AS SENSED BY CF-2-LS4 IS 512'3" REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

O' o CONTROL BOARD INDICATORS CF-2-LI3 OR CF-2-LI4 o COMPUTER POINT P201 OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL LEVEL o REFER TO OP-401 FOR THIS CONDITION.

DISCUSSION; A LOW CORE FLOOD TANK LEVEL MAY INDICATE CORE FLOOD ISOLATION VALVES ARE LEAKING BY. OBSERVE MAKEUP TANK LEVEL AND PRESSURIZER LEVEL TO VERIFY.

ALSO CORE FLOOD SAMPLE VALVES MAY BE LEAKING BY.

REFER. TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-2-LS4

==

=.

I V

AR-305 Rev. 25 Page 48

~' 's ENCLOSURE 1

'.j (Page 47 of 52)

ESE ANNUNCIATOR RESPONSE ESB-]H2-08-05 E-08-05 CF TANK B PRESS HIGH/ LOW i

i l

EVENT POINT 0113 INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS3 IS E615 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

'T o CONTROL BOARD INDICATOP.S CF-1-PI3 OR CF-1-PI4 p.-)

OPERATOR ACTIONS FOR A VALID ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD YANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION DISCUSSION:

INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES, OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE.

PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 l SENSING ELEMENT: CF-1-PS3 9

AR-305 Rev. 25 Page 49

e k

ERCLOSURE 1 (Page 48 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-05 E-08-05 j

CF TANK B PRESS HICMILOW l

1 EVENT POINT 0114 INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS4 IS 1615 PSIC.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

.o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4 OPERATOR ACTIONS FOR' A VALIC ALARM:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION-DISCUSSION:

INCREASING REACTOR BUILDING TEMPERATURES, NITROGEN VALVE LEAKBY FROM N2 BOTTLES, OR INCREASING CFT WATER LEVEL MAY CAUSE CORE FLOOD TANK PRESSURES TO RISE.-

PRESSURE LIMITS ARE ESTABLTSHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS4 D

'J AR-305 Rev. 25 Page 50

e s '.

s /l ENCLOSURE 1 (Page 49 of 52)

ESE ANNUNCIATOR RESPONSE ESB-JH2-08-05 E-08-05 CF TANK B PRESS HIGHILOW EVENT POINT 0115 INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS3 IS 5585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONTROL BOARD INDICATORS CF-1-PI3 OR CF-1-PI4 I

'u, l

OPERATOR ACTIONS FOR A VALID ALAR?i:

o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION,

DISCUSSION:

DECREASING REACTOR BUILDING TEMPERATURES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRESSURE TO DECREASE.

PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

RCFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS3

)

AR-305 Rev. 25 Page 51

4 y

=.

p/

ENCLCSURE 1 y

r (Pa,e 50 of 52)

- ESE ANNUNCIATOR RESPONSE ESB-JH2-08-05 E-08-05 CF TANK B PRESS l

HIGHILOW EVENT POINT 0116 INDICATED CONDITION:

o CFT-1B PRESSURE AS SENSED BY CF-1-PS4 IS s585 PSIG REDUNDANT INDICATION WHICH WILL VERIFY ALARM

(

o CONTROL BOARD INDICATORS CF-1-?I3 OR CF-1-PI4 OPERATOR ACTIONS FOR A VALID ALARM:

-o DETERMINE CAUSE AND RETURN CORE FLOOD TANK TO NORMAL PRESSURE o REFER TO OP-401 FOR THIS CONDITION,

DISCUSSION:

DECREASING REACTOR BUILDING TEMPERATUD.ES OR DECREASING CORE FLOOD TANK LEVELS MAY CAUSE CORE FLOOD TANK PRES $URE TO DECREASE.

PRESSURE LIMITS ARE ESTABLISHED PER TS, REFER TO TS FOR ADMINISTRATIVE REQUIREMENTS.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: CF-1-PS4-O AR-305 Rev. 25 Page 52

4 A]5

(

ENCLOSURE 1 y

(Page 51 of 52) i ESE ANNUNCIATOR RESPONSE ESB-Jh2-08-06 E-08-06 I

I I

CF TANK B DISCH VALVE OPEN/ CLOSED

==

x==-h EVENT POINT 0103 INDICATED CONDITION:

o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS 5690 PSIG AND CFV-6 IS NOT FULL CLOSED REDUNDANT INDICATION WHICH WILL VERIFY ALARM:-

l' o CONTROL BOARD INDICATOR RC-158-PI2 AND CFV-6 POSITION INDICATION OPERATOR ACTIONS FOR A VALID ALARM:

o CLOSE CFV-6 OR STOP RCS PRESSURE DECREASE DISCUSSION:

CFV-6 IS A NORMALLY DE-ENERGIZED VALVE. THE BREAKER WILL HAVE TO BE l

CLOSED AT ES MCC 3AB PRIOR TO-VALVE OPERATION.

REFERENCES:

DRAWING 208-013 SHEET CF-13 SENSING ELEMENT: RC-3A-PS3, 33C VALVE CLOSED CONTACT O

AR-305 Rev. 25 Page 53

6 4:

.o-r EHCLOSURE 1 (Page 52 of 52)

ESE-ANNUNCIATOR RESPONSE ESB-]H2-08-06 E-08-06 I

I CF TANK B l

l DISCH VALVE OPEN/ CLOSED EVENT POINT 0104 INDICATED CONDITION:

o RCS PRESSURE AS SENSED BY RC-3A-PS3 IS E702.5 PSIG AND CFV-6 IS NOT FULL OPEN REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

A-U

_o CONTROL 00ARD INDICATOR RC-158-PI2_AND CFV-6 POSITION INDICATION-OPERATOR ACTIONS FOR A,VALIO ALARM:

o OPEN CFV-6 OR STOP RCS PRESSURE-INCREASE DISCUSSION.

CFV-6-IS A NORMALLY DE-ENERGIZED VALVE. THE BREAKER WILL HAVE TO BE CLOSED AT ES MCC 3AB PRIOR TO VALVE OPERATION.

SENSING ELEMENT: RC-3A-PS3, 33 Y '.VE OPEN CONTACT i

O AP.-305 Rev. 25 Page 54 (LAST PAGE)

... -