ML20199L549

From kanterella
Jump to navigation Jump to search
Forwards Tech Spec Page 3/4 10-7 Inadvertently Omitted from 860618 Transmittal of Final Draft Tech Specs Re Special Test Exceptions
ML20199L549
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/25/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Spangenberg F
ILLINOIS POWER CO.
References
NUDOCS 8607090472
Download: ML20199L549 (4)


Text

p to JIM 2 511300 Docket No. 50-461 Mr. Frank A. Spangenberg Manager-Licensing and Safety Clinton Power Station P.O. Box 678 Mail Code V920 Clinton, Illinois 61727

Dear Mr. Spangenberg:

SUBJECT:

MISSING PAGE FOR THE FINAL DRAFT TECHNICAL SPECIFICATIONS FOR CLINTON, UNIT 1 By letter dated June 18, 1986, the final draft Technical Specifications were sent to you for review and certification.

Enclosed is page 3/4 10-7 of the Technical Specifications, which was missing in our original transmittal.

Sincerely, Or%pnel signed by Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

. DISTRIBUTION:

As stated

Docket File _

EJordon NRC PDR~

BGrimes LPDR JPartlow PD#4 R/F ACRS (10)

BSiegel WButler OPirfo, OELD M0'Brien NThompson DVassallo, F0B EButcher CSchulten f

o BWR/PD#4 [

BWR/PD#4 [ :'

0FC :BW PD NAME :M0'__ien:no : BSiegel)

WButler DATE.6/

/86 : 6/ 60 /86 : 6/2b/86:

0FFICIAL RECORD COPY 8607090472 860625

~

PDR ADOCK 05000461 A

PDR I

F a

  • rec oq[

UNITED STATES y jb v:(

g NUCLEAR REGULATORY COMMISSION p

IVASHINGTON, D. C. 20555

.g;ht[.,,, j

\\v

/

'l JUN 25 26 l

Docket No. 50-461 Mr. Frank A. Spangenberg Manager-Licensing and Safety Clinton Power Station P.O. Box 678 Mail Code V920 Clinton, Illinois 61727

Dear Mr. Spangenberg:

SUBJECT:

MISSING PAGE FOR THE FINAL DRAFT TECHNICAL SPECIFICATIONS FOR CLINTON, UNIT 1 By letter dated June 18, 1986, the final draft Technical Specifications were sent to you for review and certification.

Enclosed is page 3/4 10-7 of the Technical Specifications, which was missing in our original transmittal.

Sincerely, Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As stated

a Mr. Frank A. Spangenberg Clinton Power Station Illinois Power Company Unit I cc:

Mark Jason Assistant Attorney General Public Utilities Division Office of the Attorney General State of Illinois Center Richard B. Hubbard 100 West Randolph Street - 12th Floor Vice President Chicago, Illinois 60601 Technical Associates 1723 Hamilton Avenue - Suite K Mr. D. P. Hall San Jose, California 95125 Vice President Clinton Power Station Chairman of DeWitt County P. O. Box 678 c/o County Clerk's Office Clinton, Illinois, 61727 DeWitt County Courthouse Clinton, Illinois 61727 Mr. John Greene Manager-Nuclear Station Engineering Dpt.

Director, Criteria & Standards (ANR-460)

Clinton Power Station Office of Radiation Programs P. O. Box 678 U. S. Environmental Protection Agency Clinton, Illinois 61727 Washingte's, DC 20460 Sheldon Zabel, Esquire EIS Review Coordinator Schiff, Hardin & Waite Environmental Protection Agency 7200 Sears Tower Region V 233 Wacker Drive 230 S. Dearborn Street Chicago, Illinois 60606 Chicago, Illinois 60604 Resident Inspector Director, Eastern Environmental U. S. Nuclear Regulatory Commission Radiation Facility RR 3, Box 229 A U. S. Environmental Protection Agency Clinton, Illinois 61727 P. O. Box 3009 Montgomery, Alabama 36193 Mr. R. C. Heider Project Manager Illinois Department of Nuclear Safety Sargent & Lundy Engineers Division of Engineering 55 East Monroe Street 1035 Outer Park Drive, 5th Floor Chicago, Illinois 60603 Springfield, Illinois 62704 Mr. L. Larson Project Manager General Electric Company 175 Curtner Avenue, N/C 395 San Jose, California 95125 Regional Administrator, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

I SPECIAL TEST EXCEPTIONS SURVEILLANCE REQUIREMENTS (Continued) 4.10.6.1 (Continued) b.

The RPS " shorting links" are removed.

c.

The reactor mode switch is locked in the REFUEL position.

4.10.6.2 Perform a CHANNEL FUNCTIONAL TEST for the above required SRM channels within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the start and at least once per 7 days during initial core loading.

4.10.6.3 For at least one SRM channel, verify that the count rate is at least 0.7 cps *:

a.

Immediately following the loading of the first 16 fuel bundles.

b.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter during initial core loading.

  • Provided signal-to-noise is > 2.

Otherwise, 3 cps.

CLINTON - UNIT 1 3/4 10-7 JUN 25586

w..

...