ML20199F202

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-483/86-14 on 860512-29 & Notice of Violation
ML20199F202
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/17/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20199F208 List:
References
NUDOCS 8606240221
Download: ML20199F202 (2)


See also: IR 05000483/1986014

Text

_ _ _ _ _ -- _ . . - -_

-

JUN 171986

Docket No. 50-483

Union Electric company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, MO 63166

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. A. G. Januska

and C. F. Gill of this office during the period May 12-29, 1986, of activities

at Callaway Plant, Unit 1 authorized by NRC Operating License No. NPF-30 and to

the discussion of our findings with Mr. G. Randolph and others of your staff.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel. In addition, our Mobile Laboratory was at the

site during the inspection to perform independent measurements of radioactivity.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice. The inspection showed

that action had been taken to correct the identified violation and to prevent

recurrence. Our understanding of your corrective actions are described in

Section 6 of the enclosed inspection report. Consequently, no reply to the

violation is required and we have no further questions regarding this matter at

this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of l

this letter and the enclosed inspection report will be placed in the NRC '

Public Document Room.

.

i

DO

a______--_

'

.

Union Electric Company 2

g 7 jgg6

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

6 3rigin:1 cicted Ly 10. Shafer*

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1. Notice of Violation

2. Inspection Report

l No. 50-483/86014(DRSS)

cc w/ enclosures:

A. P. Neuhalfen, Manager Quality

Assurance

S. E. Miltenberger, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Region IV

Resident Inspector, Wolf Creek

K. Drey

Chris R. Rogers, P.E.

Utility Division, Missouri

J Public Service Commission

SNUPPS

J

4

h

l

4

,

1

l

RIII II h R RIJL R I I

@ qp

i

L

/Lp T f4 Q l

1.

Jandka/kst _11 er umacher Forney