March 7, 1986 Docket No. 50.354 APPLICANT: Public Service Electric & Gas Company FACILITY: Hope Creek Generating Station

SUBJECT:

SUMMARY

OF RADIATION MONITORING SYSTEM MEETING On January 17, 1986, a meeting was held in the Bethesda, Maryland offices of the NRC to discuss the. deferral of certain Radiation Ponitoring System (RMS) components at Hope Creek. Meeting attendees are. identified in Enclosure 1 to this meeting summary.

In a letter dated September 10,1985 (R. Mitti, PSE&G to W. Rutler NRC) PSE8G notified the NRC that certain components of the RMS would not be operational at fuel load. After reviewing the deferred components, the staff sent the applicant a letter (dated November 21, 1985, W. Butler, NRC to R. Mitti, PSE&G) coninenting on the deferred components. At the request of the applicant, a meeting was held January 17, 1986 to discuss the RMS at Hope Creek.

At the meeting, the applicant briefly described the RMS which will be in-place at fuel load. The applicant provided a handout, Enclosure 2, which details the fuel load RMS.

As a result of the meeting, the staff requested the following information:

1. confirmation of completion of seismic testing for the sample flow splitter skid and suppression pool-monitoring circuit boards,
2. description of the procedures to be used when performing emergency dose assessment calculations manually,
3. temperature qualification for the drywell leak detection RMS, and
4. output units on the RMS instrument cabinet.

The applicant supplied this information in a letter dated February 12, 1986.

(C. McNeill, PSE&G to E. Adensam, NRC).

9603270005 860307 PDR ADOCK 05000354 /S/

^ " Dave Wagner, Project Manager RWR Project Directorate No. 3 Division of RWR Licensing

Enclosure:

As stated cc: See next page l lS (12 4W9-5.u u -3:DRL DWagner/hmc E densam 3/ 6 86 3/ /86 1

L

r --

t Mr. C. A. McNeill ,

Public Service Electric & Gas Co. Hope Creek Generating Station CC*

Gregory Minor Susan C. Remis Richard Hubbard Division of Public Interest Advocacy Dale Bridenbaugh New Jersev State Department of MHB Technical Associates the Public Advocate 1723 Familton Avenue, Suite K Richard J. Hughes Justice Comples San Jose, California 95125 CN-B50 Trenton, New Jersey 08625 Troy B. Conner, Jr. Esquire Office of Legal Counsel Conner & Wetterhahn Department of Natural Pesources 1747 Pennsylvania Avenue N.W. and Environmental Control Washington, D.C. 20006 89 Kings Hiahway P.O. Box 1401 Dover, Delaware 19903 Richard Fryling, Jr., Esquire Mr. K. W. Burrowes, Pro.iect Engineer Associate General Solicitor Bechtel Power Corporation Public Service Electric & Gas Carpany 50 Beale Street P. O. Box 570 T5E P. O. Box 3965 Newark, New Jersey 07101 San Francisco, California 94119 Manager - Licensing and Regulation Resident Inspector c/o Public Service Electric & Gas U.S.N.R.C. Bethesda Office Center, Suite 550 P. O. Box P41 4520 East-West Highway Hancocks Bridge, New Jersey 08038 Bethesda, Maryland 20814 Ms. Rebecca Green Richard F. Engel New Jersey Bureau of Radiation Deputy Attorney General Protection Division of Law 380 Scotch Road Environmental Protection Section Trenton, New Jersey 08628 Richard J. Hughes Justice Complex

(. CN-112P Trenton, New Jersey 08625 Mr. Robert J. Touhey, Mr. Anthony J. Pietrofitta Acting Director General Manager DNREC - Division of Power Production Engineering Environmental Control Atlantic Electric 89 Kings Highway 1199 Black Horse Pike P. O. Box 1401 Pleasantville, New Jersey 08232 Dover, Delaware 19903 Pegional Administrator, Region I Mr. R. S. Salvesen U. S. Nuclear Regulatory Commission General Manager-Hope Creek Operation 631 Park Avenue Public Service Electric & Gas Co. King of Prussia, Pennsylvania 19406 P.O. Box A j

Hancocks Bridge, New Jersey 08038 k

,-_,_,7.. , _ _ .

t .

Public Service Electric & Gas Co. Hope Creek Generating Station ec:

Mr. B. A. Preston Public Service Electric & Gas Co.

Hope Creek Site MC12Y Licensing Trailer 12LI Foot of Buttonwood Road

'Hancocks Bridge, New Jersey 08038 t

4 i

h I

I i

I

, ~ , - _ , _ _ _ . - - . . - , _ . ._

ENCLOSURE 1 APPLICANT : PUBLIC SERVICE ELECTRIC & GAS COMPANY FACILITY : HOPE CREEK GENERATING STATION SUBJECT : EtuATim Numein kt,q

-~

DATE :

Ft.4aq, dAwaait nytsp '

Name Organization Q ,jj ue /J2ClBWL/E6

. ,j if #f L /Suf 4

&,.yy. l-lu)~n W C )WR/Pss e3 g4 - % N AC ( a top ( p s,EL Wee Spr- .

Ja.c /Gwn. /r.cs her p u w A_ unc.l be. Ph*3 5.&.Anusem y a c.pu/sasoe

n. 5~ Q pec:i?gu I g B a dooct NRc-Ri"l l a. q. tcu.e u . Psc+ cr Rdyd 3Svilm fSE4G So+e Eng n M.t.r,,ay /sr1F u ~y l R., Lo,6 ag c MttC/Nao./Dat/eg Gene Lewis G A TEC.u dO LOG \E S l Rw0rew mgy b was 43 7 ,,yocoy,gs

) VAN STUR7tMN ypm S, g hes. e. .roges wr3 T t0 uct a s. -

E N1

, ENCLOSURE 2 i

. l l

HOPE CREEK l GENERATING STATION l

I I

t I

i

,/ 5 s m'<. . u: y=s<.. :.;. .s.m

=

% .>.=r% .

, x..;.;;u n ..,

_ _ m..... ,i R*C.o?[: 4 m. . . .

M . r r; .

hi 8

--- t h 4 *;.a 8.**. *. ,* : =>4..

ii W?A,.

t T '

hf . .* ' .. . .

pik l

.."._j L_ .

i

.J i

i , ,

...i ! s.1't a

atl ,

s

,,p.i  ; e... . . . . .t .

i 11 1 .

--; . t*:.. ,;.

.] ,, Igg lp g . . i. .. .N..S.t

.. -. yg.

%m . , _

ii j ,' . . '

,, ,g , ..,

,t.

Vm s .s c..- . ..

. H.T. .

4:

g: . ' ' . .,;. :':' . ' , ' .:

~

...:*.. . .:{ : -

.,............-.:'2

. - ~

J RtlSSELL l0VELL RADIATION PROTECTION CHEMISTRY MANAGER JANUARY 17, 1986

.. . . . - ~ . - - . . - -

3 .-

\

i IdII F _s!=I M.nls

= I i Ear l rT...1 i

~

~

3.I  ::::

= ._ _ _ _ _ _ _ _ _ - tr__a' i

-I ..

J L____ _ _ _ _ _ _ _ _

t a 'I

. _ _ . , i 5- >

6 a

b O sg 5$

y; .

Oo@I p w

!" 351 ,

E CT ~gEs "" ';.--- -v.~~. . K O lI- '

4 "

< C.' ,

r _... l J z

=a a

  • s ,._ @f e i  !

{

e

  • ' 4 a l ,

4 8

t e o 8 a 8 <

M J g

g

'i. _ _ _ _ _ _ _ _.) ] , 3 m J

b...___.J 4 u

- e .

g* A. - .w S *

-e in _fE >

lgsqc_u,joo@y

=r gg; 5-O c

ll" 5

P ee a me , -n- . - - --. , . -- - - -. -

(

FUEL LOAD RMS 10C604 PANEL CLASS 1E PROCESS REFUEL FLOOR EXHAUST (RFE) -

RMS REACTOR BUILDING EXHAUST (RBE) - RMS CONTROL ROOM VENTILATION (C RV) - RMS DRYWELL ATMOSPHERE POST-ACCIDENT (DAPA) MONITOR SUPPRESSION POOL IEMPERATilRE MONITORING SYSTEM (SPTMS)

NON CLASS 1E PROCESS DRYWELL LEAK DETECTION (DLD)

DRYWELL SilMP MONITORING DRYWELL CONDENS ATE COOLER MONITORING CONTAINMENT ATMOSPHERE RADIATION MONITORS EFFLUENT MONITORS LIQll!D RADWASTE EFFLilENT (LR)

COOLING IOWER BLOWDOWN-(CTB)

NORTH PLANT VENT (NPV)

SOUTH PLANT VENT (SPV)

FILTER RECIRCULATION VENTILATION SYSTEM VENT (FRVSV)

AREA MONITORS NEW FUEL STORAGE SPENT FUEL STORAGE 1:

[

FUEL LOAD RMS .

PROCESS MONITORS AVAILABLE WHEN MSIVS OPEN MAIN STEAM LINE MONITORS (10C604)

OFF 6As PRE-IREATMENT

'(CONTROL Room ALARM, LOCAL READ OuT) 0FF GAS Post-TREATMENT (LOCAL READ OuT) l m

! ~7 -

MO l-

i z

~~

FUEL LOAD RMS ,

CONTROL ROOM INDICATION ANNUNCIATORS CLASS 1E

- SEPARATE ANNUNC'IATORS FOR EACH CHANNEL EXCEPT DAPA NON-CLASS 1E

- SUMMED RMS TROUBLE ANNUNCIATOR 10C604 PANEL RM-23A READ 0llT OF CHANNEL PARAMETER STRIP CHART RECORDERS CONTROL ROOM AREA MONITOR LOCAL READ 0llT IN CONTROL ROOM METEORLOGICAL DATA

- CONTROL ROOM HARD COPY DISPLAY FROM METEOROLOGICAL IOWER 6

e

-M 4

. 1 M-CN4

~~_ -- RADIAtle 2 1T5135 MTER Infassi CAtlET C3 O c - E::3 0

SPT EFT PRTs agT.

M M FLalf WELL Raft 4AT1 SATE EC

t. - -

DAFA stiff 3474 syyp at A- -

= ,t .tA 5 . . ..

,l .m, rt l

e

.- T

2. S8 8Ia .

LIO M MT* Cast W RAS PUEL IM& M 3,33 gag

,A, wAgTE C8tf CODUI m

  • a=

M e Fevs sApryu confect i M

4 Q ggag 15 1.4 5

8.C m CE TENT BEf*

tfELL BLAE 3.3 2.9 FURf SW

  • RS - -

=c- i y a a m a _

e WV 99

  • g , -

g,3 2 8. 5 Leas tam gg WENT f,38912Ag asq m

WTWT unm.s .

PP W

M> *

~

= em m.

b oe 1

~e +--< 4 4 ' & 9 ~4

  • ode 6 - O=.4+- ----A h* "- -O-"---"-4 -

O- -3 & ' "

- ~

E I

  • i M

r X.

n  ! I o

= II

  • 3 .

l E e

l j ,

t O 1 O +-

l

' E

- 31 X ] a I

r l l > .

I N l O C

(

3lg T l 3.]3

- l RM-tis '

.) =

4'y

. . t g 1#

10C604 { '

_A ,

w: =:

, ' 'A z' ll 1 . -

. W ,

B I W l

I /

N! g z4 a

! - F T

- 1l -

. 1 .

y- _ . , _ _ - - . ,,

_.,p, -_y _-,.,y - -- g --- -, -

~ _ - __

FUEL LOAD RMS AREA MOMTORS '

LOCAL INDICATION MAIN CONTROL ROOM EL EV AT I O N REACTOR BUILDING PERSONNEL AIRLOCK 102

' ~

- MOTORIZED EQUIPMENT HATCH 132 OPEN EQUIPMENT HATCH 145 SPENT FUEL POOL COOLING & DEMINERALIZING 162

- SAFEGUA'RD INSTRUMENT ROOM 77

- EQUIPMENT AIRLOCK 102 RWCU SYSTEM EQtlIPMENT 145 _

SAMPLE STATION 145

- TECHNICAL SUPPORT CENTER 132 SERVICE AND RADWASTE AREA t

l - RADWASTE DRUM SHIPPING AREA 1 102

- CHEMISTRY LABORATORY 124

- HATCHWAY 77 RESTRICTED MACHINE SHOP 102

- RADWASTE SAMPLE STATION 54

- FRVSV SKID AREA 153

- FRYSy LRP AREA 153 -

On 9

Y  !

g ..

FUEL LOAD RMS SAFETY EVALUATION FOR DEFERRED MONITORS / FUNCTION VENTILATION MONITORS REACTOR BUILDING VENTILATION SYSTEM EXHAUST DOWN STREAM OF REACTOR BUI'LDING EXHAUST -

RMS AND HEPA FILTERS NO ISOLATION FUNCTION UPSTREAM OF SPV ,

- AP TROUBLE AL ARM FOR HEPA FILTERS IN CONTROL ROOM TURBINE BUILDING EXHAllST, IURBINE BilILDING COMPARTMENT EXHAUST, GASEOUS RADWA6TE AREA EXHAllST NO HEPA FILTERS NO ISOLATION UPSTREAM OF SPV WILL USE PORTABLE CONTINUOUS AIR MONITORS PER SER COMMITMENT (SECTION 12 3 4 2)

RADWASTE EXHAUST SYSTEM AND RADWASTE AREA EXHAUST SYSTEM UP AND DOWNSTREAM OF HEPA AND CHARCOAL FILTERS NO ISOLATION FUNCTION UPSTREAM OF SPV

'r-PORTABLE CONTINUOUS AIR MONITORS 21 P INDICATOR IN CONTROL ROOM -

h

_ _______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._ _ a

4

{

  • -* 9 FUEL LOAD RMS

' LIQUID MONITORS -

REACTOR AUXILIARY COOLING SYSTEM AND SAFETY AUXILI ARY COOLING SYSTEM CLOSED LOOP SYSTEMS UNTIL MONITOR IS FUNCTIONAL WILL SAMPLE DAILY IAW T.S. TABLE 3 3 7 1-1 HEATING STEAM CONDENSATE WASTE SYSTEM AND HEATING STEAM CONDENSATE DECONTAMINATION SYSTEM WEEKLY GRAB SAMPLES DEPENDENT ON LIQUID RADWASTE SYSTEM PROCESSING ~

TURBINE BUILDING CIRCULATING WATER SYSTEM DISABLE AllT0MATIC Pi .P OuT GRAB SAMPLE PRIOR TO PUMP OuT I

( .-

~

l ~1 l

l

Det. Det.

e Det. Det.

, _ COMPLETED RMS CONFIGURATION

\\J/ \\ J/ \\ //

i l

l

~ ~~'" ~

i RM-80 RM-80 RM-80 RM-80

{

      • ~

. . . - RM-11 RM-11 _ . . .

n N .. .. /

.s **

11/750 11/750 f

u,.,,. 10C604 as,AmLs0895 l j Nicro-VAX

=.> = .

l  :::: -

l 1-l r

L

i . i gg - -

i i 51 POWEn RMS -

l

CENTRAL RAnIATION PROCESSOR-1 RM-11 COMPUTER j PROVIDES CONTROL ROOM DISPLAYS VI A DKP FOR ALL NONITORS DATA DISPLAY IN TSC AND NEALTH PHYSICS CONTROL POINT PR0v!DE TRENDS REMOTE 0PERATIONS AVAILABLE 120 DAYS POST FUEL LOAD l

micro VAx II COMPUTER REG. 6UIDE 1 21 REPORTS MIDAS EMERGENCY DOSE MODEL AVAILABLE 60 DAYS POST FUEL LOAD VAx 11/750 COMPUTER /

-PROVIDE SPDS AND CRIDS INPUT DISPLAY OF DATA AT E0F DOOR, NATCH AND AIRLOCK ALARMS ANNUNCIATION FOR MONITORS I

  • REMOTE OPERATIONS

-METEOROLOGICAL DATA DISPLAY

~

l l

l

  1. , - e'

. SZ POWER RMS LOCAL INDICATION VENTILATION MONITORS REACTOR BUILDING VENTILATION EXHAUST TURBINE BUILDING EXHAUST TURBINE BUILDING COMPARTMENT EXHAUST 6ASEOUS RADWASTE AREA EXHAUST RADWASTE EXHAUST SYSTEM RADWASTE AREA EXHAUST SYSTEM TECHNICAL SUPPORT CENTER VENTILATION LIQUID PROCESS MONITORS REACTOR AUXILIARY COOLING SYSTEM (RACS)-

SAFETY AUXILIARY COOL;NG SYSTEM (SACS)

HEATING STEAM CONDENSATE WASTE SYSTEM (HSCW)

HEATING STEAM CONDENS ATE DECONTAMINATION . SYSTEM (HSCD)

I '

IURBINE BUILDING CIRCULATING WATER SYSTEM (TBCW)

WILL PERFORM

  • ROUTINE SURVEILLANCE UNTIL CONTROL ROOM l

INDICATION IS OPERATIONAL "o

5 - --

l -

~

t.

i I

' 5 gg - -

5Z POWER RMS REACTOR BUILDING DOOR, HATCHES AND AIRLOCKS ADMINISTRATIVE CONTROLS UNTIL CRP IS OPERATIONAL POST GUARDS'AT ROUTINE ENTRANCES SECURITY SYSTEM MONITORING DRYWELL LEAK DETECTION - CONTAINMENT ATMOSPHERE RADI ATION MONITOR w

.- CONTAINMENT ATMOSPHERE RADIATION MONITOR I " " * ^p ^ " " " " ' ' '

OUALIFICATION FOR <120*F. NEw DETECTOR 150 DAYS AFTER FUEL LOAD EMERGENCY RESPONSE FACILITIES '

TELEPHONE OR IELECOPY TRANSMITTAL OF DATA UNTIL CRP OPERATIONAL

- SAFETY PARAMETER DISPLAY SYSTEM (SPDS)

PARAMETERS IN 10C604 PANEL ONLY SPENT FUEL AREA RADIATION MONITOR AVAILABLE IN CONTROL ROOM SPD5 DISPLAY AVAILABLE WHEN CRP IS OPE' RATIONAL SEISMIC QUALIFICATION REPORT Two TEST, COMPLETE REPORTS DUE PRIOR-TO EXCEEDING 5% POWER PhEOPERATIONAL IESTING T DETAILED IEST PROCEDURES COMPLETED -

~:

~

i g, . .

SAFETY $ VALUATION RM 11 COMPUTER MONITORS WITH LOCAL INDICATION WILL HAVE ROUTINE SURVEILLANCE DURING ACCIDENT CONDITIONS 10C 604 DATA WILL BE COLLECTED BY DEDICATD PERSONNEL FOR RELAY TO CONTROL ROOM OPERATORS AND FOR TELECOPY OR TELEPHONE TRANSMISSION TO ISC AND EOF.

DATA AVAILABLE ONLY LOCALLY NOT NECESSARY FOR OFF SITE DOSE ASSESSMENT OR INPLANT RECOVERY OPERATIONS.

RM-11 INPUT WILL BE MADE OPERATIONAL ON A PRIORITY BASIS MICRO VAX ll COMPUTER MANilAL COLLECTION OF EFFLilENT DATA FROM 10C604 PANEL UNTIL VAX 11/750 DATA LINK AVAILABLE.

MANUAL ENTRY OF DATA INTO MICRO VAX ll FOR REG. 611IDE 1 21 REPORT GENERATION.

PERSONAL COMPUTERS llSED FOR EMERGENCY DOSE MODEL VAx 11/750 i-LOCAL SURVEILLANCE ON RM-11 READOUT FOR CONTROL ROOM DISPLAY UNTIL VAX 11/750 IS OPERATIONAL EOF DATA TRANSMISSION VI A TELEPHONE OR TELECOPY METEOROLOGICAL DATA HARD COPY IN CONTROL ROOM

! =

%' RP-TI.XX-002(O) s ll ATTAOINEIST 1 y I

.~: RM-23 FRONT PANEL LAYOUT - ,

. -o . *

.i i  !

i O O a s

i a a-

l. 36 H+

. h t

e

== O O O O s 3

-O O O O j

. -O O O O 3

'l G P I A FS8B F8&T pens C/D , ,

h

  1. D E E ,a

- O "". O = O **'

O i i, t

- = 7 8 9 ;i

- 4 5 6 i ,

i t

I

= 1 2 3 1, l

E o +  ;

,i.

O O -

t. .
  • INDICATES BACKLIGHTED KEY' I

me-TI.xx-oo2(o) ^**f M*I' ' "***

t.

. , , - ~ . , .,_- , , . - , - , , , . . . - - , , _ _ . , , , , , , _ , _ , _ , _ _ , , , _ , , _ _ , , , , , , , , , , , __ {

c.

March 7, 1986 MEETING

SUMMARY

DISTRIBUTION

,ocketNo(s): 50-354 NRC PDR Local PDR BWD #3 r/f J. Partlow (Emergency Preparedness only)

E. Adensam Attorney, OELD E. Jordan B. Grimes ACRS (10)

. Project Manager D. Waaner E. Hylton NRC PARTICIPANTS A. Lee

'R. Fell J. Hulman JLee KCampe DWagner E. Adensam M. Shanksky H. ' Bicehouse R. LaGrange

-bcc: Applicant & Service List L. _