ML20199E199
| ML20199E199 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 01/07/1999 |
| From: | Marschall C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Edington R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20199E202 | List: |
| References | |
| 50-458-98-20, NUDOCS 9901200347 | |
| Download: ML20199E199 (5) | |
See also: IR 05000458/1998020
Text
,
-
. . . . ._
- - -
- ._ - _
..
I
!
l
/
'\\
UNITED STATES
l
{
',,(
p,
NUCLEAR REGULATORY COMMISSION
g-
- c
REGION IV
%, *'
,$[
l
0,,
611 RYAN PLAZA DRIVE. SUITE 400
'
ARLINGTON TEXAS 76011-8064
- '*
g -y @
l
Randall K. Edington, Vice President - Operations
,
i
River Bend Station
l
Entergy Operations, Inc.
!
P.O. Box 220
l
St. Francisville, Louisiana 70775
j
l
l
SUBJECT: NRC INSPECTION REPORT 50-458/98-20 AND NOTICE OF VIOLATION
i
i
Dear Mr. Edington:
l
From November 1 through December 12,1998, the NRC conducted an inspection at your
,
River Bend Station (RBS) reactor facility. The enclosed report presents the scope and results
'
of that inspection.
During the 6-week period covered by this inspection, safety-conscious operations, sound
l
engineering and maintenance practices, and effective radiologice! cont;ols generally
'
characterized your activities at RBS.
!
The NRC inspectors identified one violation of radiation protection procedures for the failure to
perform appropriate surveys before unconditionally releasing three containers from RBS.
'
Consequently, two contaminated items were found in one container shipped to the Waterford 3
l
facility.
l
The NRC has concluded that information regarding the reason for the violation and the
corrective actions taken and planned to correct the violation and prevent recurrence is already
l
adequately addressed on the docket in the enclosed report. Therefore, you are not required to
!
respond to this letter unless the description therein does not accurately reflect your corrective
l
actions or your position. In that case, or if you choose to provide additional information, you
!-
should follow the instructions specified in the enclosed Notice.
In accordance with 10 CAR 2.790 of the NRC's ' Rules of Practice," a copy of this letter, its
'
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
[
Should you have any questions concerning this inspection, we will be pleased to discuss them
l
with you.
Sincerely,
fp .
,s
.-
,
$
u
Charles S. Marschall, Chief
Project Branch C
Division of Reactor Projects
'
9901200347 990107
ADOCK 050004 0
,
.
-
Entergy Operations, Inc.
-2-
Docket No.:
50-458
License No.: N.F.-47
Enclosures:
2. NRC Inspection Report
50-458/98-20
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Director - Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
Mark J. Wetterhahn, Esq.
Winston & Strawn
1401 L Street, N.W.
Washington, D.C. 20005-3502
o
,
.
. ..
.
. . .
.
..
.
.
Entergy Operations, Inc.
-3-
Manager - Licensing
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
The Honorable Richard P. leyoub
Attorney General
Departrnent of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President of West Feliciana
Police Jury
P.O. Box 1921
St. Francisville, Louisiana 70775
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
L
_ _ ___-________ __.
._ _ _ _
_ _ _ _ . . _ . _ . _ _ _ _ . . . _ . . . . . . _ _ _ _ _ _ . _ _ . . _ _ _ _ _ _ _ . . . _ . _ . _ . _ _ _ _ _ .
i
Entergy Operations, Inc.
-4-
g_
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (Grand Gulf)
j
DRP Director
DRS-PSB
i
'
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
Branch Chief (DRP/TSS)
Resident Inspector
l
i
1
1
i
l
'
l
DOCUMENT NAME: R:\\ RB\\RB820RP.GDR
l
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
lRIV:RI
RIV: SRI
C:DRP/C
C:DRS/PS 4
lNPGarrett @h hr
GDReplogieMk CSMarschall
BMurray /P9
l.12b98
kMGe
14$96 (bTetor 12H981LT/7
12//98
h/4 ' x
Pl@lu
- a f 04/it OFFICIA RE
RD COPY //'/]O,#'~
.
W -
.
t
l'
,
- -
-
- - .
. - .
-
.-.
-
- _ .
.
...
. .- -
--.
._
.
.
_ _ _ - - _ - - _ - - - . - _ - - _ - _ - - _ - . - _ _ - - _ _ - - -
.
b
Entergy Operations, Inc.
-4
JAN - 7 1999
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
.bcc to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (Grand Gulf)
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
Branch Chief (DRP/TSS)
Resident inspector
100030
DOCUMENT NAME: R:\\_RB\\RB820RP.GDR
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:RI
l
RIV: SRI
l
C:DRP/C l
C:DRS/PS [6
l
NPGarrett 'l,
GDReplogie
CSMarschall
BMurray I' 4
).
'
r gi
J 2H98
12f/98
12/ /98 e C ,
12//98
p
<
~
OFFICI AL RECORD COPY //1."i ., i . ,'?";
'
o
_q
.
!
. . . . . - . . . . .
. _ _ _ . _ _ _ _ _ _ . _ _ _ _ _
-