Informs That 970714 Submittal of Operational Quality Assurance Plan,Rev 20 for Plant,Units 1 & 2,has Been Approved
ML20199C927
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 11/12/1997
From: Wetzel B
NRC (Affiliation Not Assigned)
To: Richard Anderson
NORTHERN STATES POWER CO.
References
TAC-M95130, TAC-M95131, NUDOCS 9711200197
Download: ML20199C927 (4)


Text

._- - - . _ _ .

- [@

S I

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30066-0001

) M

'S,,,,, November 12, 1997 ggg Mr. Roger O. Anderson, Director Nuclear Energy Engineering Northern States Power Company 414 Nicollet Mall Minnsspolis, Minnesota 55401

SUBJECT:

APPROVAL OF NORTHERN STATES POWER COMPANY'S OPERATIONAL QUAllTY ASSURANCE PLAN, REVISION 20 (TAC NOS. M95130 AND M95131)

Dear Mr. Anderson:

On April 19,1996, Northem States Power Company (NSP) submitted Revision 20 of the Operational Quality Assurance Plan (OQAP) for approval by the Nuclear Regulatory Commission pursuant to 10 CFR 50.54(a). On September 25,1996, we forwarded the preliminary results of our review of Revision 20 to the OQAP. On December 19,1996, NSP submitted a revised Revision 20 of its OQAP to address the NRC staff comments.

Subsequently, on July 14,1997, NSP submitted a second revised version of Revision 20 which superseded all previous versions of the OQAP. The revised OQAP supported an application to amend the Prairie Island, Unit Nos.1 and 2, technical specifications (TS) to relocate and revise the administrative controls delineated in the TS. The amendments will be addressed by separate correspondence.

OQAP Revision 20, incorporates the following new sections: Section 7.3, " Procedures,"

Section 8.4.4, " Prairie Island Procedure Control," Section 19.12, " Prairie Island Operating Records," Section 21.0, " Prairie Island Safety Audit Committee (SAC)," and Section 22.0,

" Prairie Island Operations Committee (OC)."

Section 7.3, " Procedures," includes, verbatim, procedure related provisions included in current TS 6.5," Plant Operating Procedures," that do not have to be retained in TS to conform to Section 5.4," Procedures," of NUREG 1431, Revision 1.

Section 8.4.4, " Prairie Island Procedure Control," includes, verbatim, the control of temporary changes currently in TS 6.5.C, " Temporary Changes to Procedures."

Section 19.12, " Prairie Island Operating Records," includes, verbatim, the record retention requirements currently in TS 6.6," Plant Operating Records."

Section 21.0 defines the Prairie Island SAC function, membership, qualifications, meeting frequency, quorum, responsibilities, authority, and records provisions which agree verbatim I with the review and audit functions currently specified in TS 6.2.

Section 22.0 defines the Prairie Island Operations Committee (OC) membership, meeting frequency, quorum, responsibilities, authority, records, and procedures provisions which agree verbatim with the review and audit functions currently specified in TS 6.2.

9711200197 971112 PDR ADOCK 05000243 ,.,

s u ,s.

ll ,l. ll ll

. !L ll .

b f, N lil, .j

R. O. Anderson November 12, 1997 All future changes to the OQAP are to be controlled pursuant to 10 CFR 50.54(a). OQAP, Revision 20, constitutes the bases for the licensee's continued compliance with the requirements of Appendix B to 10 CFR Part 50 and Revision 20 to the OQAP, dated July 14, 1997, tutinues to comply with the criteria of Appendix B to 10 CFR Part 50 in accordance with NUREG-0800 (Standard Review Plan Sections 13.4 and 17.2). Therefore, the staff approves, OQAP, Revision 20, as submitted on July 14,1997.

Sincerely, ORIGINAL SIGNED BY

< r Beth A. Wetzel, t;enior Project Manager Project Directorate ill 1 <

Division of Reactor Projects -lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50 282,50 306, and + -

50-263 ,

cc: See next page >

I '

~

DISTRIBUT10N' .

Docket File

. PUBLIC '-

PD#31 Reading ,

E. Adensam B. Wetzel ,

' T. J. Kim 'i J. Peralta, HQMB i T. Tjader, OTSB OGC ACRS J. McCormick Barger, Region til DOCUMENT NAME: G:\WPDOCS\ PRAIRIE \Pl95130.QAP T3 receive e copy of thle escument, indicate in the aos: "C" e Copy methout attechment/smelosure *E's Copy with attachment / enclosure *f a No copy OFFICE PM:PD31 E ! LA:PD31 E BC:HQMB lg D;PD31 g(lg NAME LGundrum:dbM CJamerson djy SBlack R(f (, JHannon" l DATE 11/(, /97 11/ 6 /97 (/ 11/10 /97 11// 9 7 l

OPPICIAL EECORD COPY l

,_ . . , _ . _ . . . , _ . _ _ . . . __ _. _ _ ...~. _ . _ _ _ .

R. O. Anderson 2-All future changes to the OQAP are to be controlled pursuant to 10 CFR 50.54(a). OQAP, Revision 20, constitutes the bases for NSP's continued compliance with the requirements of Appendix B to 10 CFR Part 50 and Revision 20 to the OQAP, dated July 14,1997, continues to comply with the criteria of Appendix B to 10 CFR Part 50 in accordance with NUREG-0800 (Standard Review Plan Sections 13.4 and 17.2). Therefore, the staff approves OQAP, >

Revision 20, as submitted on July 14.1997.

Sincera!y, gkts Q. t .

Both A. Wetzel, Senior Project Manager Project Directorate lll 1 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Re0ulation Docket Nos. 50 282,50 3M, and 50 263 cc: See next page l

l L -- - . - -

, Mr. Roger O. Anderson, Director Prairie Island Nuclear Generating  ;

Northem States Power Company Plant l l

cc:

i J. E. Silberg, Esquire Site Licensing i Shaw, Pittman, Potts and Trowbridge Prairie Island Nuclear Generating 2300 N Street, N. W. Plant Washington DC 20037 Northem States Power Company 1717 Wakonado Drive East Plant Manager Welch, Minnesota 55089 Prairie Island Nuclear Generating Plant Tribal Council -

Northem States Power Company Prairie Island Indian Community 1717 Wakonado Drive East ATTN: Environmental Department Welch, Minnesota 55089 5636 Sturgeon Lake Road Welch, Minnesota 55089 Aconis A. Neb!ett Assistant Attomey General ONice of the Attomey General 455 Minnesota Street Suite G30 St. Paul, Minnesota 55101 2127 U.S. Nuclear Regulatory Commission Resident inspector's ONice 1719 Wakonade Drive East Welch, Minnesota 55089 9642 Regional Administrator, Region ill U.S. Nuclear Regulatory Commisslori 801 Warrenville Road Lisle, Illinois 60532 4351 Mr.'Jeff Cole, Auditor / Treasurer Goodhue County Courthouse Box 408 Red Wing, Minnesota 55066-0408

- Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota 55101 2145 November 1996

_ _ , _ ~ _ _ _ _ _ , _ . _ _ . _ _ - _ _

. .