ML20199C709

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-266/86-06 & 50-301/86-06 on 860401-0531.No Violations Noted
ML20199C709
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/11/1986
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20199C715 List:
References
NUDOCS 8606180231
Download: ML20199C709 (2)


See also: IR 05000266/1986006

Text

f

, b m 13

.

r

JUN 111986

Docket.No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. R. L. Hague

and R. J. Leemon of this office on April 1 through _May 31, 1986, of activities

at Point Beach Nuclear Plant, Units 1 and 2, authorized by NRC Operating

Licenses No. DPR-24 and No. DPR-27 and to the discussion of our findings with

Mr. J. J. Zach at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC Public

Document Room.

We will gladly discuss any questions you have concerning this inspection.

_

Sincerely,

B

e606180231ADOCKOhob66-

PDR PDR c~ -" AT. cTP"TS "Y W. A A" ""' M

.

O

W. G. Guldemond, Chief

Reactor Projects Branch 2

Enclosure: Inspection Reports

No. 50-266/86006 (DRP);

No. 50-301/86006 (DRP)

See Attached Distribution

RIII RII

w 'kst Guhdemond

y 4 y

.

L

%20]

r

-o

.

Wisconsin Electric Power Company 2

JUN 111986

!

Distribution

cc w/ enclosure:

J. J. Zach, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wiscon' sin Public Service

Commission