'l-WTF REV02(MC)

AP-604 Or-WATER 80X TUBE FAILURE INFORMAtON 1.0 ENTRY CONDITIONS O.N, LY a

t if in Mode I through 4, AJD cation conc.ctivity at CDP discharge (CE-2, CE-3) is verified to be

> 0 gmho/cc, 181B use this procedure.

2,0..JMMEDIATE ACTIONS H0.IE Therr are no imediate actions for this procedure.

O i

4 Approved by MNPO Date l' YI-9 h?

/^)

(SIGNATURE ON FILE)

- V AP-604 PAGE 1 of 25 WTF

~

900t290005 980122 DR ADOCK o 32

4.

O BLANK PAGE O

WTF AP-604 REV 02 PAGE 2 of 25

3.0 F0ll0W-UP ACTIONS DET W ACTIONS e Notify Cbemistry to perform the 31 Notify Chemistry.

following:

Dete, sine affected CWP.

Notify the control room if Condensete Demin outlet (CE-5) cation candactivity

>1 mho/cc.

e STA 3.2 Notify personnel of plant conditions, o

Plant Operators SS00 (evaluate p' ant conditions e

for entry into the Emergency Plan)

O 3.3 Isolate condensate e Notify SP0 to f ail closed CDV-88 rejection flow to CDT-1 "ondensate Reject to CDT-!" (95 ft

.J behind Atmospheric Drain Tank).

O i

AP-604 REV 02 PAGE 3 of 25 WTF

_~ - -

.. -.. -.. _.... ~. _.. - -... - -.- -. _.. -. -. - -.~..--. - - _,... ~..

4 1 -. -

i 4

'g.

. (

4 l

I

-I b

4 4

4

!~

4 4

BLANK PAGE s

4^

O '-

E t

I-1 e

rn I-r r.

2 u.

'k

- AP-6041.

REV 02 PAGE' 4 of 25 WTF J

fe e

b m

4..

m w

r...,

,w.n.., _.,..,.,

.n..

...y r

).O FOLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.4 Verify Condensate Demins

  • Notify SF0 to verify the following are not bypassed.

are closed at the " Condensate Demineralizer Control Panel":

,__ CXV-o "Demin Bypass Valve" CXV-12 "Demin Bypass Valve" E Condensate Demins are 1

Adjust CX 15-DPI-B1 knob to "15"

bypassed, (95 TB Cn P-1 Panel).

Jhf3 notify SP0 to attempt to close all Condensate 2

Adjust CX-16-DPI-B2 knob to "15" Demin bypass valves.

(95 TB CXCP-1 Panel).

3 Depress " SYSTEM HI D/P ALARM CXV-12F BYPASS VALVE B2" " RESET" push button (95 TB CXCP-1 Panel).

4 Depress " SYSTEM HI D/P ALARM CXV-5F BYPASS VALVE Bl" " RESET" O

push button (95 TB CXCP-1 Panel).

5 Adjust CX-15-DPI-B1 knob to "0" (95 TB CXCP-1 Panel).

6 Adjust CX-16-DPI-82 knob to "0" (95 TB CXCP-1 Panel).

3.5 Notify SPO to ensure 1

Obtain most efficient Condensate proper Condensate Demins Demin alignment from chemistry.

are in service.

2 Ensure proper number of condensate demins are in service for power level.

AP-604 REV 02 PAGE 5 of 25 WTF

t i

/

}a

,F 4~

. 9 i

i

=

s W

r t

4 h

1 d

i F

i f

i e

1 4

BLANK PAGE 3.-

i e

t a

A 4

4 r:

t J..

4.'

'...'! /

1AP-604_.

REV'02!

PAGE 6 of 25

-WTF 4'

i:

k,.'

y

,.__....r

~

l a. FOLLOW-UP ACTIONS (CONT!D.1 ACTIONS DETAILS 3.(

E at any time, Condensate 1 Stop the affected CWP:

Demin outlet (CE-5) cation conductivity is

>1 mho/ce, CWP-1A M stop the affected CWP and GO TO Step 3.12 in CWP-1B this procedure.

CWP-lc CWP-ID 2

GO TO Step 3.12 in this procedure.

S.7 _ E a power reduction is

  • CONCURRENTLY PERFORM AP-510, Rapid
required, Power Reduction, beginning with Step M start a rapid power 3.1 reduction at > 5%/ min.

See Table 1 3.8 E the tube leak is in a e

M Rx power is < 45%,

hotwell with only one M trip the turbine and inservice waterbox, CONCURRENTLY PERFORM AP-660, MD turbine is operating, Turbine Trip, beginning with M reduce Rx power to Step 2.1 less than the anticipatory setpoint and trip the turbine.

O AP-604 REV 02 PAGE 7 of 25 WTF

-.,. -.. - ~... -

~.

..... -. ~

5 j

Applicable carry-over steps:

3.6 Y Condensate Demin outlet cation conductivity---is >;I mho/cc...--

i k

o i

1 4

h' 1

P 4

-.;s l:

i i

V 4

J i

1

-h.--_-

--p

. AP-604l--

REV 02 PAGE 8 of 25 WTF' 1,

w a

-w.,.

e--

-- +

a a

m

-.-w,

.e+-

+ ---.

(*

M IDLLOW-UP ACTIONS (CONT'D)

ACTIONS DETAILS 3.9 1E at any time, the 1 _ _ Ensure Rx power and Turbine are affected CWP can be operating within CWP operation

stopped, guidelines.

JJJG stop the affected CWP.

See Table 1 2 Stop the affected CWP:

CWP-1A CWP-1B

_ _ CWP-lc CWP-ID 3 Notify SPO to close waterbox vacuum isolation valve for the affected CWP:

O-ARV-47 "A Waterbox Vacuum Outlet Iso" (119 ft TB north of A Waterbox)

ARV-46 "B Waterbox Vacuum Outlet Iso" (119 ft TB north of B Waterbox)

ARV-45 "C Waterbox Vacuum Gutlet Iso" (119 ft TB north of C Waterbox)

ARV-44 "D Waterbox Vacuum Outlet Iso" (119 ft TB north of D Waterbox) 4 Notify Chemistry of CWP shutdown.

O AP-604 REV 02 PAGE 9 of 2$

WTF

^

Applicable carry over steps:

O 3.6 J1 Condensate Demin outlet cation conductivity is > 1/ta,no/cc...

Q.)

3.9 H the affected CWP can be stopped, Iti[U stop the affected CWP.

s

-~

,s

\\,/

AP-604 REV 02 PAGE 10 of 25' WTF

= - -

3.0 FOLLOW-UP ACTIONS (CONT'D)

O' DETAILS ACTIONS MQIE Opening waterbox vacuum breakers can potentially create a vacuum leak when the affected CWP is stopped.

3.10 if at any time, the affected CWP is stopped, ARV-57 IHEN open affected CWP-1A Waterbox Vacuum Breaker ARV-56 Valves.

.ARV-55 CWP-1B ARV-54 ARV-53 CWP-lC ARV-52

/~N ARV-51 CWP-ID ARV-50 3.11 WHEN all of the following conditions exist for the affected CWP:

CWP is stopped Waterbox vacuum-isolation valve is closed Waterbox Vacuum Breaker valves are open 1 BEN GO TO OP-204, Power Operations, Section 4.3, 100% To 20% Power Decrease.

-AP-604-REV 02 PAGE 11 of 25 WTF

8 m

BLANK PAGE O

WTF AP-604 REV 02 PAGE 12 of 25

l 3.0 FOLLOW-UP ACTIONS (CONT'D1 o

DETAILS ACTIONS STATUS Condensate Demin outlet (CE-5) cation conductivity is > 1 mho/cc.

3.12 lE 'he Rx is @l tripped, ItiDi manually trip the Rx, and CONCURRENTLY PERFORM E0P-02, Vital System Status Verification, beginning with Step 2.1 3.13 _ _ Initiate EFIC.

1 Depress "EFW INITIATE" push buttons on EFIC channels A and B.

2 Ensure at least on. EFP running:

EFP-1 EFP-2 3

Ensure level in available OTSGs is at or trending toward required level.

[ Rule 3, EFW Control]

AP-604 REV 02 PAGE 13 of 25 WTF

BLANK PAGE O

O AP-604 REV 02 PAGE 14 of 25 WTF

3.0 FOLLOW-UP ACTIONS (CONT'D)

DETAllS 3.14 iate MFL1 for both 1 De s

"M IN F 1 OLAT B

for both OTSGs.

2 Select MBV to " MAN" and select FW isolation valves to "CLOSE" for both OTSGs:

FW Valve A OTSG B OTSG LLBV FWV-31 FWV-32 MBV toggle

" MAN"

" MAN" MBV FWV-30 FWV-29 SUBV FWV-36 FWV-33 Cross-Tie FWV-28

___ FWV-28 q

Suction FWV-14 i V-15 b

3 Ensure both MFWPs tripped:

A OTSG B OTSG FWP-2A FWP-2B Ov AP-604 REV 02 PAGE 15 of 25 WTF

_D

BLANK PAGE O

AP-604 REV 02 PAGE 16 of 25 WTF

~

,..A

l 3.0 FOLLOW-UP ACTIONS (CONT'D)

~

DETAILS ACTIONS 3.15 Stop both MFWBPs.

1 Start both MFWBP aux oil pumps:

FWP-6A 1

FWP 6B 2 Stop both MFWBPs:

FWP-1A FWP-1B 3.16 Isolate waterbox vacuum 1 Notify SP0 to close waterbox vacuum for the affected CWP.

isolation valve for the affected CWP:

ARV-47 "A Waterbox Vacuum Outlet Iso" (119 ft TB north of A Waterbox)

(~]

\\J ARV-46 "B Waterbox Vacuum Outlet Iso" (119 ft TB north of B Waterbox)

ARV-45 "C Waterbox Vacuum Outlet Iso" (119 ft TB north of C Waterbox)

ARV-44 "D Waterbox Vacuum Outlet Iso" (119 ft TB north of D Waterbox) 2 Notify Chemistry of CWP shutdown.

(

AP-604 REV 02 PAGE 17 of 25 WTF

Bt'dK PAGE O

WIf AP-604 REV 02 PAGE 18 of 25

3.0 F0LLOW-UP ACT10NS (CONT'D)

ACTIONS-DETAILS

{

3.17 Open the affected Waterbox ARV-57 Vacuum Breaker Valves.

CWP-1A-l ARV-56 ARV-55 CWP-1B ARV-54 ARV-53 CWP-Ic ARV-52

,ARV-51 CWP-10 ARV 50 Unlock and open CDV-103 "CDT-1 3.18 IE at any time, EFT-2 e

O, level is s 8.5 ft, to EFP Suctior ',119 ft Berm by IHEN notify SP0 to CDT-1).

crcss-tie CDT-1 and EFT-2 e

Ensure CDV-290 "CDT-1 to EFP Suction" is open (119 ft Berm in covered valve box by FST-1A).

f l^

A

.AP-604-

-REY 02 ^

PAGE-19 of 25 WTF

4 Applicable carry-over steps:

3.18 IE EFT-2 level is s 8.5 f t, Itifh cross-tic COT-1 and EFT-2...

O O

AP-604 REV 02 PAGE 20 of 25 WTF

4 4

3.0 FC'. LOW UP ACTIONS (COPJ.3d DETAILS ACTIONS 3.19,__. E at any time, makeup to 1

Ensure CDV 102 "CDT-1 Lower Iso" closed (119 ft Berm by CDT 1).

CDT-1 is required, Ititi n6tify SP0 to makeup 2

Ensure CDV 236 "C01 1 Upper Iso" t o C01 -1 open (119 ft Berm by C01 1).

31solate Condenser vacuum from DW loads downstream of DWV 346:

Close CDV 149 "DW Hakeup to Hotwell Control Bypass" (95 f t TB by C inlet waterbox).

Close CDV 147 "DW Makeup to Hotwell Control Inlet Iso" (95 ft TB by C inlet waterbox).

4 Select DWV 346 "TB DW Header Iso" control switch to "CLOSE" (95 ft TB Deain Water Panel).

5 Open DWV-377 "DWV-346 Bypass" (95 f t TB southwest stairwell) until pressure equalizes around DWV 346 6

Select DWV-346 "TB DW Header Iso" control switch to "0 PEN" and verify DWV 346 opens (95 ft TB Demin Water Panel).

7 Open CDV l*7 "DW Makeup to Hotwell Control inlet Iso" (95 ft TB by C inlet waterbox).

8 Close DWV-377 "DWV-346 Bypass" (95 f t TB southwest stairwell).

9 Select DWV-346 "TB DW Header Iso" control switch to "AUT0" (95 ft TB Demin Water Panel).

10 Throttle open CDV-112 "DW Makeup to CDT 1" (95 ft TB by MFWBPs).

AP 604 REV 02 PAGE 21 of 25 WTF

Applicable carry over steps:

3.18 J1 EFT 2 level is s 8.5 ft, JJiLU cross tie CDT-1 and EFT-2...

3.191[ makeup te CDT 1 is requ'. red, Ill[h tnakeup to CDT 1...

O O

l AP 604 REV 02 FAGE22of25 WTF

3.0 FOLLOW.UP ACTIONS (CONT'01 O

DETAILS ACTIONS

  • Notify SPO to perform the following:

(

3.20 _

Stop any hetwell fills.

Fail closed CDV 87 "CDT 1 Makeup i

to Hotwell" (95 ft TB by C inlet

{

-waterbox)

Fail closed CDV 113 "DW tlakeup to Hotwell Control" (95 ft TB by C inlet waterbox)

Close CDV.149 " Makeup to Hotwell 1

Control Bypass" (95 ft TB by C inlet waterbox) i W

h i

3,21 Notify Chemistry to make l

preparations for continuous condensate L

release.

J 3.22 EXIT this procedure.

i 4

5 i

i 1

TAP 604 _

REV 02j PAGE 23 of 25 WTF l

,,.i.-

....-..,,-,J._..-

. ~ _ _...,.... "., _,. -. _ _

..... -... - =.

.m.,,..

.---.,,..-r

_ _ = -. -. _ _ -. _. _.

n l

O BLANK PAGE o

V 1

AP 604 REV 02 PAGE 24 of 25 WTF

J Power Level CWP Combination

<85%

From 4 to 3 CWPs

<60%

From 3 to 2 CWPs Ta5le 1:

(one in each hotwell)

CWP Operation

<45%

Guidelines From 3 to 2 CWPs (both in same hotwell)

I f

O c.

i i

O

%)

AP 604-.

LREV02-PAGE'25 of.25 (LAST PAGE)-