Ack Receipt of Responding to IE Bulletin 85-003. Grants 2-month Extension to Finalize Response to Item 1(e)
ML20199B487
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/11/1986
From: Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
IEB-85-003, IEB-85-3, NUDOCS 8606170161
Download: ML20199B487 (2)


Text

fjUlv 11 1906 In Reply Refer To:

Dockets: 50-445 50-446

-Texas Utilities Generating Company ATTN: Mr. W. G. Counsil Executive Vice President 400 North Olive, L.B. 81 Dallas, Texas 75201 Thank you for your letter of May 14, 1986, in response to NRC IE Bulletin 85-03. In your letter, you requested an extension to finalize your response to IEB 8503, item 1(e), in order to utilize the efforts of the Westinghouse OwnersGroup(WOG). Your request for a two month extension to develop the plant specific portion of item (a) of the bulletin is granted.

Sincerely, Onginal signed by T. F. Westerman T. F. Westerman, Chief Reactor Safety Branch cc:

Texas Utilities Electric Company ATTN: G. S. Keeley, Manager Licensing Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Juanita Ellis President - CASE 1426 South Polk Street Dallas, Texas 75224 Renea Hicks

% Assistant Attorney General wo Environmental Protection Division 58' P. O. Box 12548

@@ Austin, Texas 76711 (D O w Texas Radiation Control Program Director do oc bec: (see next page) y eo C:RSB Y TFWesterman DRSP EHJohnson RA RD rtin b

  • ' g 4 / fe/86 W)\/86 / /86 g SEol ;

c bec to DMB (IE01) bec distrib. by RIV: .

RPB- MIS System  !

RRI-0PS RSTS Operator RRI-CONST R&SPB-T. F. Westerma9, CPTG DRSP

. V. Noonan, NRR~ -

R. Martin, RA

'S. Treby.. ELD - RSB RIV File J. Taylor, IE D. Weiss, LFMB (AR-2015) .R. Heishman, IE f

j O

L.

v n.

. Log i TXX-4781 File i 10115 l IE 85-03 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWEB e 400 NORTBS OLIVE FTREET. L.B. St

  • DA11AS. TEXAS 75301 May 14, 1986
  • ENM!iNY.Y.% >

, MAY I 61986 Mr. Robert D. Martin Regional Administrator, Region IV

-}j .

U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 IE BULLETIN 85-03

Dear Mr. Martin:

Item (e) of IE Bulletin 85-03 requires, by May 16, 1986, the submittal of a written report to the NRC that:

o reports the results of item (a) of the bulletin and O contains the program to accomplish items (b) through (d) including a schedule for completion of these items.

The Westinghouse Owners Group (WOG) has undertaken a program to generically address item (a) of the bulletin. A description of the program was i, transmitted to the NRC in a letter from L. D. Butterfield to Tom Novak dated March 18, 1986. The results of the WOG program, which was completed in April of 1986, provide each member utility with a methodology for the completion of the plant specific portion of item (a) of the bulletin.

We request a two month extension to the bulletin reporting deadline to plan the activities for the plant specific requirements of the bulletin.

Very truly yours, W. G. Counsil BSD/arh c- U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20502 Mr. Vince Noonan (

8605210175 860514 PDR ADOCK 05000445 I

G 7/, O '

PDR

%-sO 7 A omsson or rExAs urnssTES ELECTRIC COMPANY W