ML20199A518

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-483/97-17 on 970914-1025 & Nov. Violation Involved Failure to Follow Slave Relay Test Procedure
ML20199A518
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/12/1997
From: Johnson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20199A522 List:
References
50-483-97-17, NUDOCS 9711170209
Download: ML20199A518 (5)


See also: IR 05000483/1997017

Text

7

'

i

  1. "%

UNitto STATES

)

f

,4-

NUCLEAR REGULATORY COMMISSION

,

s

R E GloN IV

3

611 RYAN PLAZA oRIVE. SUITE 400

'%,

AR LINoT oN. Y E XA5 760118064

    • "'

NOV l 2 iL97

Garry L Randolph, Vice President and

,

Chief Nuclear Officer

Union Electric Company

P.O. Box 620

l

Fulton, Missouri 65251

SUBJECT: NRC INSPECTION REPORT 50 483/9717 AfvD NOTICE OF VIOLATION

Dear Mr. Randolph:

An NRC inspection was conducted September 14 through October 25,1997, at your

.Callaway Plant reactor facility. The enclosed report presents the scope and results of that

inspection.

4

During the 6 week po lod covered by this inspection, your conduct of activities at the

Callaway Plant was generally characterized by safety conscious operations, sound

engineering and maintenance practices, and careful radiological controls. However, one

cited violation of NRC requirements was identified. The violation involved the failure to

follow a slave relay test procedure.

The violation is cited in the enclosed Nctice of Violation (Notice) and the circumstances

surrounding this violation are described in detailin the enclosed report. The NRC has

concluded that information regarding the reason for the violation, the corrective actions

taken, and the actions planned to correct the violation and prevent recurrence is already

adequately addressed on the docket in the enclosed inspection report. Therefore, you are

not required to respond to this letter unless the description therein does not accurately

reflect your corrective actions or your position. In that case, or if you choose to provide

additional information, you should follow the instructions specified in the enclosed Notice.

Also, during this inspection period, site staff discovered that contacts in an emergency

,

diese! generator bypass protection relay were not being tested as required by Technical Specification 4.8.1.1.2.g 5.

Although subsequent testing demonstrated that the contacts

would operate satisf actorily, literal compliance with the Technical Specifications may have

required that the testing be performed during shutdown conditions. Since this testing was

performed with the reactor at power, there is a potential that you violated your Technical

Specification requirements. You are requested to include your position on this issue with

your resporose to Unresolved item 50-473/9715 01.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room. To

the extent possible, your response should not include any personal ps;vacy, proprietary, or

safeguards information so that it can be placed in the Public Document Room without

redaction.

' \\

EFERIIE

'

m, w mm,2

.

-

.

-

- -

_

_

__ . _ _

_ _ _ _ _ . .

_ _ ,

_

.

4

Union Electric Company

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

W

William D. Johnson, Chief

Project Branch B

Division of Reactor Projects

Docket No.: 50-483

License No.: NPF 30

Encicsures:

1. Notice of Violation

2. NRC Inspection Report

50-483/97-17

cc w/ enclosures:

Professional Nuclear Consulting, Inc.

19041 Raines Drive

Derwood, Maryland 20855

Gerald Charnoff, Esq.

Thomas A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

H. D. Bono, Supervising Engineer

Quality Assurance Regulatory Support

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

Manager Electric Department

Missouri Public Service Commission

301 W. High

P.O. Box 360

Jefferson City, Missouri 65102

.

.

.

-

..

Union Electric Company

-3-

_ Ronald A. K'ucera, Deputy Director

Departrnent of Natural Resources

P.O. Oox 176

Jefferson City, Missouri 65102

Otto L. Maynard, President and

Chief Executive Officer

Wolf Creek Nucleat Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

Dan 1. Bolef, President

Kay Drey, Representative

Board of Directors Coalition

for the Environment

6267 Delmar Boulevard

University City, Missouri 63130

Lee Fritz, Presiding Commissioner

Callaway County Court House

!

10 East Fifth Street

Fulton, Missouri 65151

Alan C. Passwater, Manager

t.icensing and Fuels

Union Electric Co.npany

P.O. Box 66149

!

St. Louis, Missouri 63166 6149

J. V. Laux, Manager

Quality Assurance

Union Electric Company

P.O. Box 620

Julton, Missouri S5251

.

.

.- -

. , -

.

.

..

-

-- .

.

.

.

Union Electric Company

-4

NOV i 21997

'

1 i

E-Mail report to T. Frye (TJF) '

E-Mail report to T. Hiltz (TGH)

E-Mail report to.NRR Event Tracking System (IPAS)

ti Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

-- Regional Administrator .

Resident inspector

DRP Director

DRS-PSB

, Branch Chief (DRP/B)

MIS System

' Project Engineer (DRP/B)

RIV File

,

Branch Chief (DRP/TSS)

i

.

'

DOCUMENT NAME: R: CW\\CW9717RP.DGP

_

. To receive copy of document,-indicate in box: "C" = Copy without enclosures "E" =

,

Copy with enclosures "N" = No cQpy

_

'RIV:RI [] /m

RIV: SRI /1

C:DRP/B- / /-

FLBrush/T

DGPasseS/ ~

WDJohnt4f

1

114)/97

11//W97

11/@97"

__._

OFFICIAL RECORD COP (-

-J

i

. - .

-

,

_

_

_

..

f

3

h

NOV I 2 997

Union Electric Company

-4

.

' ' '

E Mail report to T. Frye (TJF)

'

E-Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC) -

E Mail report to F ank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

l

'

DRP Director

DRS-PS8

Branch Chief (DRP/B)

MIS System

Project Engineer (DRP.'B)

RIV File

Branch Chief (DRP/TSS)

DOCUMENT NAME: R:_CW\\CW9 17R .P DGP

7

. To receive copy of document, Indicate in box: "C" = Copy without enclosures "E"

=

Copy with enclosures "N" = No cqpy

_,

RIV:RI /9/m

RIV: SRI ///m C:DRP/B [/

l

FLBrush/ l'

DGPassefl/ ~

WDJohnp6ti

? 1/,N97

11/17/97

11/9 97"

OFFICIAL RECORD COPY

l'10020

T -