rc\\e sg cadioaclVif Som conOmedlo& abyb,b Q (4 hen f
l TABLE 3.3-6 (Continued)
TABLE NOTATIONS With fuel in the fuel storage pool areas.
5 In MS h"* QT ip Setpoint concentration value (pCi/ml) is to be With irradiate fuel in the fuel storage pool areas.
Me.
stablished such that the actual ubmersion dose rate would not exceed mR/h in the containment buildin M e Setpoint value may be increased up to the equivalent limits wMcm [of Speci ication 3.11.2.1 in accordance with the methodology and parameters darm in the ODCM during containment purge or vent provided the Setpoint value does not exceed twice the maximum concentration activity in the containment as p08" A4 # g ined by thD sample analysis ;;rn. x d e-tr t; e accordance with Table 4.11-2.4 Af+v rebse 4ermirda, h Try Mped ske shdl be_ no rnore. 4(an 3 be.s he. conininment absrhem, ac.fwif as ind/mfed 67 h g;,f,7
- mondor, ACTION STATEMENTS on ACTION 30 - With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge and exhaust valves are maintained closed.
ACTION 31 - With the number of operable channels one less than the Minimum Channels OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolate the affected Control Room Ventilation System intake from outside air with recirculating flow through the HEPA tilters and carbon adsorbers.
ACTION 32 - With less than the Minimum Channels OPERABLE requirement, opera-tion may continue for up to 30 days provided an appropriate portable continuous monitor with the same Alarm Setpoint is provided in the fuel storage pool area.
Restore the inoperable monitors to OPERABLE status within 30 days or suspend all operations involving fuel movement in the fuel building.
i ACTION 33 - Must satisfy the ACTION requirement for Specification 3.4.6.1.
ACTION 34 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, operation may continue provided the Fuel Handling Ventilation Exhaust System is operating and discharging through the HEPA filters and carbon adsorbers.
Otherwise, suspend all operations involving fuel movement in the fuel building.
ACTION 35 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, operation may continue provided the Auxiliary Building Filtered Exhaust System is operating and discharging through the HEPA filter and carbon adsorbers.
ACTION 36 - With the number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, operation may continue for up to 30 days provided that, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, grab samples are collected and analyzed for radioactivity (gross gamma) at a lower limit of detection of no more than 10 7 pCi/ml.
8606110381 860605 PDR ADOCK 05000413 P
PDR CATAWBA - UNITS 1 & 2 3/4 3-53 t