ML20198T107
| ML20198T107 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/09/1998 |
| From: | FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20198T110 | List: |
| References | |
| NUDOCS 9801260456 | |
| Download: ML20198T107 (1) | |
Text
.
Document Transmittal #: 83422 Date: 19/98
)r TC:- NRC (DC deism)
MAC: N/A Destination:
==
Description:==
Copy Copy Totals
, Document:
Revision:
Comment:
INFO CNTL MSTR AP0404 00 7
1 0
0 AP0520 00 7
1 0
0 AP0770 23 _
7 1
0 0
c'l a bol i4ygjQ)
Instructions to the Addressee:
Please verify the document (s) received agrees with the above information.
Operations department must attach old document (s) or portions of document (s) superseded by the above to this transmittal.
The signature incncates acknowledgmer.t of receipt of the above occument(s) and that documents have been updated Retum signed and dated transmittal to Document Control within 15 working days of transmittal date to mall code:
NA1C Floride Pcrer Corporation -
Document Control, NA1C
'. e s * * *
- Crystal Riwr Energy complex 15760 W. Power Line st Crystal RNer, FL 344264708 Signature of Addressee; Date:
9001260456 990109 PDR ADOCK 05000302 F
PDR i
.