Forwards Info Re Dates of Completion or Expected Completion of Generic Requirements,Per NRC 860430 Request.Updated Info Will Be Available by 860610
ML20198R731
Person / Time
Site: Beaver Valley
Issue date: 06/02/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Tam P
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-TM NUDOCS 8606100183
Download: ML20198R731 (8)


Text

.

}Vs

'AFS Telephone (412) 393-6000 Nuclear Group

$pp'ingport, PA 15077-0004 e 2, M%

Director of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Attn:

Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555

- Mail Stop 340 -

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements Gentlemen:

Attached are marked-up pages from your letter dated April 30, 1986 requesting information regarding the date that all aspects of each identified requirement was completed or is expected to be completed.

This list 4.s partially complete due to the broad scope review necessary to obtain information which corresponds to the actual implementation dates Ninety four of the 143 line items have been addressed and the requested dates provided.

It is expected that an updated list providing all the dates will be available by June 10, 1986.

As per an earlier conversation with Mr.

G.

S.

Sovick of my staff, some of these items are not well enough defined to permit us to identify the actions that were

required, therefore, question marks have been inserted to identify those items.

If you have any questions, please contact me or my staff.

Very truly yours, hDR f4

(

DO P

h cg7 V

e Presi ent, Nuclear cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Va1. ley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission goo c/o Document Management Branch Washington, DC 20555 1

&,qd 03 de 04fl CoflW. IfIbfk; f/IWE(* oi-Sfl/&n0 -W. ), [g Q FWQyQ

,=

R-12087 51 -0811 REGULAT0RY INF0RMATION TRACKING SY$1 LM PAGE NO.*

FACILITY IMPLEMENTATION 03/31/

FACILITY: BEAVER VALLEY 1 PLANT LOCATION: 5 MI E OF E. LIVERPOOL, ON LICENSED POWER: 2652 MMT PROJECT MANAGER: P. TAM DOCKET NUM0ER: 850-80334 DESIGN POWER:

0835 M4E BRANCH CHIEF:

L. RUBENSTEIN ARCH / ENGINEER: SSN NS$$ VENDOR:

NEST LIC. ASSISTANT:

. VACANT IE INSPECTOR:

M. TROSKOSKI

  1. f LIC ACT LICENSEE TAC NO.

MPA 0 TITLE C0frLETE STATU$

DAII M07121 A-01 10 CFR 50.55 A(G) - ISI 12/04/79C Com*6tTLD t977 o3/h/83C Come'uto tct s 3 M08132 A-02 APPENDIX I - ALARA 02/k/79C

[

[

f.

M06987 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS

,/ M11153 A-09 PRESSURE VESSEL BELTlJNE MATERIAL SURVEILLANCF

. [

{

{

09/12/80C com etc rro a9to i

M10474 A-10 CONTINGENCY PL,ANNING sie\\

c M10476 A-11 GUARD TRAINING PLANS-02/11/KC e w c u. t e. o M18475 A-12 VITAL AREA ANALYSIS -

03/27/81_C co m Ar_v c o a 9 gi M06363 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 06/29/42C e

,q, o M46511 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 08/12/82C g

g 7

M51071 A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 12/30/86 p

7 11/27/44C M55010 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (OL 83133 Com ccc tc o s9ty M59070 A-20 10 CFR 54.62 OPERATING REACTOR REVIENS 12/31/86[

p g m,,,

FEO W co 61F6 06/30/,86ML'[

10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE M59941 A-21

-%!=d FIRE PROTECTION (Wf T 5-1 A f A ha'd cmm,m

,q3q

~'

P M06405 3-02 02/21/79C c cm g e e,3 g,,

gq,g M04372 3-03 PHR MODERATOR DILUTION O

/83C -

Co m ect T r o 5 /S6 M06714 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION 02/12/79C g

(

7,*M07313 B-c7 STEAM GENERATOR FEEDWATER FLON INSTABILITY 11/03/79C y3 M10837 B-15 FUEL R0D B0H 07/22/80C 7 M08670 3-14 CEA GUIDE TUBE HEAR 6

- M12162 B-16 EMERGENCY PLANNING AND REVISIONS

"WL y (94t t a- ((st ' tt-n),EL*LT} S u m/'3C gre q< sad.

I2 L

Clute

'l'a y N du/c s'.s /td fe d^vd

  • C *,

d M ]l le, e tw Mr feL M.i.is dule

-He

~

.s

. s :n

.u.e Al t? (

ftvee.)

R-1208731-801 REOULAT0RY INF0RMATION TRACKINO SY$ TEM PAGE NO.s FACILITY IMPLEMENTATION 03/31/

i SEAVER VALLEY 1 (CONTINUATIBII)

Ik LIC ACT LICENSEE TAC NO.

IFA 3 TITLE C0frLETE STATUS RAIE M19477 B-17 TECM SPEC SURVEILLANCE FOR MYDRAULIC SNUBBERS 83/30/82C cc,,nrarf.o i9 1 2.

t M18268 B-28 CONTAIISIENT Laaraa* BUE TO SEAL DETERIORATION g

y M18323 3-21 LOSS OF 123-V BC SUS VOLTAGE MITH LOSS OF ANNUNCIA 4g;(

Mit478 B-22 TECM SPEC SURVEILLAIICE REOUIREMENTS FOR MECHANICAL 03/30/82C C CM' ' O

' 9 ff 2-33' 05/81C 0"'""'"

'9I' M10007 B-23 DEGRADES ORIS VOLTAGE

/

M42553 3-24 VENTIIIS AllB PUROIIIS CONTAIISBNTS l#1ILE AT FULL PON -44e9erSTC-

. (frw4s6reeA to M18473 B-24 VENTIIIS AllB PtNt0!IIS CONTAIISIEllTS ISIILE AT FULL PON N

~

pge gyy,j M12991 3-24 VENTING AND PUROIIIS CONTAIISIENTS teIILE AT FULL POII 44448 444L JI18222 B-26 INADVERTANT SAFE { INJECTI0II DURIIIS,C00LD00el 12/28/79C

[

3 M07240 3-31 LOIIG SMAFT LMSI 8 OUTSIDE RECIRC. PtNF BEGRADATION gq

.yj,,

c w etetto s 'I M 1849417 B-32 BLOCKEB SI SIGIIAL DURIIIS C00L90188 g^3fg empca tto aqSt

^-

II44453 3-39 PNR PRESSURE - TEMPERATURE LIMIT TECH SPECS h'""")

Come'8T40

'911 M 9111 B-41 FIRE PROTECT 1011 - FIIIAL TECM SPECS 490001:#B0040h4,.

Z22

.*-M11685 B-42 TMI FOLLOII UP - ALL PLAllTS Metas'fer: 4 to T44 4MJt) 3]M11981 3-42 TMI FOLLOII UP - ALL PLANTS (SI eluf;n) eF/17/79C 1

(

1M11766 3-43 Plet FEEENATER LINE CRACKS 82/25/Sec l

^^T

^^^

7 jM43129 B-43 PMR FEEBIIATER LINE CRACES Ct/n:.]Jk JLC le.tter) r.

7 7

M30750 3-44 LESSSIIS LEARNED IMPLEMENTATIGII e4/18/Sec M30751 B-44 LES$0lt$ LEARNED IIFLEMENTA'TIDII 04/18/80C 7

7 7

7 h30752 3-44 LESSOIIS LEARetES IIFLEMEllTATI0lt 84/tS/40C M30753 B-44 LES$00tS LEARNED C/LEMEllTATI0lt 04/18/80C 7

7 M38754 3-44 LESSOIIS LEARIIED IIFLEMENTATIO10 84/18/80C

?

)

M30755 3-44 LESSOIIS LEARMED IDFLEMENTATIOI8 84/fE/88C l

/

F,ee peace:r.*.a (Aw-n Q c,a+L 1/c/s3 (. sci-isuon Aq.t (d.G i

1

)

]

R-1248731-901 REOULAT0RY INF0RMATION TRACEINO

$Y$ TEM PAGE NO.e l

FAC1LITY IMPLENENTATION 03/3 i

]

BEAVER VALLEY 1 (CONTINUATION) 1 E

LICENSEE LIC ACT i

TAC MO.

WA B TITLE COWLETE STATUS BAIE I

i M54756 B-44 LESSONS LEARNES IP LEMENTATISIl 84/18/80C g

M30757 B-44 LESSONS LEAANES IWLEBWIT TISIR 84/18/80C

?

?

j i

M34754 B-44 LESSells LEAA M S IWLS WITATION 84/18/80C

?

3 l

1 j

M34759 B-44 LESSSIIS LEARNES IWLSWITATI0ll 04/18/80C 1

l M30760 B-44 LESSSIIS LEARIIES INLOWITATIget 84/14/sec 1

7 f

M38761 B-44 LESSOIIS LEARNES INLEMEIITATISII 84/18."htC

?

?

M30762 B-44 LES$000$ LEARNES INLEMEllTATI0ll 04/18/8tC 7

7 j

M12395 B-44 LES$000$ LEARNED INLDIEIITATISIS 82/11/81C 7

i M12922 3-45 MASN'1488 EVElli V,

  • PRIMARY C00LAllfsY$ TEM PRES $UR 84/28/41C computty.o

,q 3 g 1

M12598 B-44 ASIALYSIS OF TURBIIIE DISC CRACKS 88/19/81C 4,M12673 3-47 ECC$s CLAD SNELLIIIO AllB RUPTURE 89/12/40C 1

,7 M13110 3-48 ABE00ACY OF STATION ELECTRIC BISTRIBUTIOII VOLTAGE 06/21/82C Com et tt t o i452 l

M11865 B-52 REVIEN OF SAFETY ASPECT OF IIIA9WERT' EAT SAFETY ACTI 02/03/81C c omet. *T t o R81 45/15/81C e o m ecti t a i9 r i 1942892 B-57 SIIR CAPABILITY 87/12/82C comm s, c gg ta j

M42854 4-59 MASOIIRY NALL DESIGII 03/07/45C co m ect.1 t.o i9%6 l

1942459 B-68 ENVIR0000 ENTAL OUALIFICATISIt comece tt.o 191l l f ^^

1942652 3-61 LOSS OF 18011 CLASS IE ISC POIIER

c. on, par c.o
i952, 1942722 3-62 ESF RESET COIITROL SESIGII BEFICIElICY 1943911 3-43 INTERIM PROCESURES FOR SIIORT~ TERM SLACKOUT 99/01/81C eo m ecc.,c o i 9 g a.

NATURALCIRCULATI0d 30001

' 48/02/83C

  • 47144 3-46 I0 M44826 B-69 IER 88-4 MAINSTEAM LINE BREAK NITH COIITIIIUED FEEON 04/04/82C Co<a et t s c.o 49 c 2 1946598 B-7 0 FATIOUE TRANSIENT LIMIT TS g

M49724 B-7 2 IIUREO 0737 TECH SPECS (GENERIC LETTER 82-16) 10/21/83C G

i l

i l

R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.*

j FACILITY IMPLEMENTATION 05/31/[

t BEAVER VALLEY 1 (CONTINUATION)

I LIC ACT LICENSEE TAC NO.

MPA 8 TITLE COMPLETE STATUS

Ralf, j

Fs M52737 B-76 ITEM 1.1 - POST TpIP REVIENs PROGRAM DESCRIPTION 8.

20/85C Co' aft 2Te *

//f4 M52818 B-77 ITEM 2.1 - E4UIPMENT CLASSIFICATION 8 VENDOR INTER 10/31/86 C'""#'# N

  1. #[83 M52499 B-78 ITEMS 3.1.1 4 3.1.2 -POST MAINTENANCE TEST PROCEDU 11/21/85C CO* N E 7///

l M52980 3-79 ITEM 3.1.5 - POST MAINTENANCE TESTING - CHANGES TO 10/31/45C ccm PL.LT L

  1. /yj M53061 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO 11/21/85C com #t 4 74.

///g3 i 40 M53114 B-41 ITEMS 4.2.1 8 4.2.2 -PREVENTATIVE MAINT PROG FOR R 10/h45CL com ett rf.,

r/f'/

l M53166 3-82 ITEM 4.5 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC

b f RO 7EC7s D 8/ 6 d

M54516 3-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-04/30/86 f fo3Ec7s D 'f/f6 M53569 B-85 SALEM ATHS 1.2 DATA CAPABILITY S4/30/84 cce edit

  1. /3)

M53652 5-86 SALEM ATHS 2.2 S-R COMPONENTS 56>'d.

e,/30/86 ccesv Tt.

3 /gy M53735 B-47 SALEM ATHS 3.2.1 8 3.2.2 S-R COMPONENTS 11/21/45C Ccee PC#&-

3/jy M53818 B-88 SALEM ATHS 3.2.3.T.S. S-R COMPONENTS 10/31/85C Co* FL4 f/-

N/g3 M53901 B-89 SALEM ATHS 4.2.5 8 4.2.4 LIFE COMPONEN 12/31/86 fgaTsc7tp /t/gg M55348 B-90 SALEM ATHS 4.3 N AND 58N T.S.-

06/30/86 fgoJgc7dp g; q

M54045 5-92 SALEM ATNS 4.5.1 DIVERSE TRIP FEATURES 11/21/85C doe #64Th gj'gj j

vv M53962 3-93 SALEM ATHS 4.5.2 8 4.5.3 TEST ALTERNATIVES 01/31/87 t'dtoJg c7ED /1/g/

? M12188 C-01 PNR SECONDARY NATER CHEMISTRY MONITORING REQUIREME 01 80C g

c o u c g;7g, gt j go M08596 C-03 GUALIFICATIONS OF RADIATION PROTECTIGN MANAGER ~ -

03/27/79C WW co, p g,gg L 5gqq

,. 5. b c M 6 N08594 C-06 PUMP SUPPORT-LAMELLAR TEARING

  • M08593 C-07 FUEL MANDLING ACCIDENT INSIDE CONTAINMENT 12/12/79C com P QT(,

g;LMq l

e6 M07972 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 12/20/84C j

M43646 C-14 AUXILI ARY FEEDNATER SEISMIC,0UALIFICATION Se,% ol.3'l 01/11/82C w M52208 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPA 06/28/85C m Ah VAC t. le :;.

.t' f c/,,,,.,,,,4 f #A,3 A fg.g(,, g,,

~

4 i

l i

R-1208751-901 REOULAT0RY INF04MATIeN TRACEINO SY$ TEN PAGE NO.

FACILITY I M P L E N E II T A T I e II 03/31, SEAVER VALLEY 1 (CSIITINUATIBII) 9L TAC MO.

IFA e Yttts hTE 5

STAT f

M58e45 C-14 hTILITY **WOIISPS.TS STAFF #7TIONS CONCERN cc,wcc1(o i916 7,M07841 D-82 ECCS ZIRCTLAS INSEL ERROR-CSFLIANCE MITN 10 CFR-01/e9/80C I

1, Me7830 B-03 PRESSWIZER WATW RATE ERROR es/27/79C

?

?

l Mess 97 a-te ASyIouTRic'tScA~LOAss '

es/st/4s ecostctro s i / g r.

'!M88974 D-11 FISSIGII OAS RELEASE

$mne

?

?

e M12263 D-15 MIGII ENEROY LINE aapar a C011SE00EIITIAL SYSTEM FAIL--

c om ecti c n 9 'l 1,M12749 D-16 REVIEM OF CORPORATE IIAIIAGEIENT CAPABILITY

/81C 7

7 M3082 D-17 BEFINITISII 0F-SPERABLE Com PdT E

'9 S O M55838 D-19 BIESEL SENERATOR RELIABILITY TECM SPECS (OL 84-15) c om ec(tt.

t9 t1

^'

i - M19584 E-e5 N 11-1 LOOP OPERATION 87/

84C Pe ostt i Lo

\\% 7 Y

=

i M4882 F-01 1.A.1.1 SHIFT TECNIIICAL ABWISOR 81 42C

_111I!LC,once 1

3044478 F-02 I.A.1.3 SHIFT IIA 8IIIING M44141 F-03 I.A.2.1 UPORASIIIS SF Re AIIB SRO TRAINING 11/15/82C 9044212 F-84 I.C.1.2/3. A EparnassarY OPERATIIIS PROCEDURES GENERIC g 3044282 F-85 I.C.1.2/3.3 PearsaaIBM SENERATISII Pmaan (WJRE8 18/01/84 8047195 F-86 I.C.5 FEEDSACK OF OPERATIIIS EXPERIENCE 11/14/41C M47267 F-07 I.C.6 CORRECT PERFORf1AIICE OF SPERATIIIS ACTIVITI pes 1141 F-08 1.B.1.1 DETAILES COIITROL ROOM SESIGII REVIEII PROGRA 84C

~

1851221 F-09 I.3.2 SAFETY PARAMETER DISPLAY SYSTEll 1'0/30/86

'8044353 F-10 11.3.1' RCS NIGII POINT WEIITS 99/88/43C 1

l 1947919 F-11 11.3.2 PLANT SHIEL31100 11/08/82C I

8044421 F-12 II.B.3 POST ACCIDESIT SAfrLIIIe 09/07/84C pl44491 F-13 II.B.4 TRAINIi46 FOR MITIGATIIIS CORE BAMAGE 11/15/82C l

~

1 R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NC.:

25 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC NO.

MPA 0 TITLE COMPLETE STATUS Hlg 4 'A M44562 F-14 II.B.1

.RW,AMS S4 TRAINING 03/31/86 pr0[eded 10/ff,

.M44632 F-15 II.E.1.1 AFM SYSTEM EVALUATION 02/02/82C M44674 F-16 II.E.1.2.1 AFM SYSTEM INITIATION 07 h 42C 2

M44711 F-17 II.E.1.2.2 AFM SY;?EM FLON INDICATION 07/b/82C M44759 F-18 II.E.4.1 DEDICATED H'DROGEN PENETRATION

-' - ^^^

TWdl***=ne,6-(c/.3,4j M44830 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 07/19/82C 11/ab81C, DiC l e f f,,.

M44901 F-20 II.F.1.1 NOBLE GAS MONITOR M44972 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 11/09/81C, M c l g y,,,,

M45043 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 12/24/81C M47580 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 05/17/83C M47651 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 05/17/83C M47722 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 05/17/83C INSTRugNg,F DETECTION ON INADESUATE 07/31/86 -

p rop c hedt, N8$

M45114 F-26 II.F.2 M46878 F-30 II.K.2.13 THERMAL-MECHANICAL REPORT 06/15/84C M47792 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 12/19/83C M45229 F-36 II.K.3.1 AUTO PORV ISOLATION 09/14/83C i

l M45275 F-37 II.K.3.2 REPORT ON PORV FAILURES 09/14/83C M45323 F-38 II.K.3.3 REPORTING SV AND PV FAILURES AND CHALLE 03/04/82C M45392 F-39 II.K.3.5 AUTO TRIP OF RCPS

":& ;y;; ta v1 Hr, t.ng w,dj -

^

~CTh 45441 F-40 II.K.3.9 PID CONTROLLER 11/18/81C M

M45471 F-41 I I. K. 3.10 ANTICIPATORY TRIP MODIFICATIONS 01/26/83C M45501 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBINE TRIP 04/06/83C 1

M45409 F-47 II.K.3.17 ECCS OUTAGES 08/04/83C

R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 26 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC No.

MPA 8 TITLE CDMPLETE STATUS DATI GM M48414 F-53 II.K.3.25 PONER 158 PUMP SEALS 84/24/82C -

- c ompM*d l4f 2-M45805 F-57 II.K.3.30

$8 LOCA METHODS 05/28/85C -

00*f M48146 F-54 II.K.3.31 kWFLIAM:E NITH 18 CFR 50.46 01/31/87 -

gropch4 s 9 f 'I

- togid e A 8 fy M45925 F-63 III.A.1.2iTECISBICAL SUPPORT CENTER 12/38/86 III.A.1.h PbhhellAL SUPPORT CENTER I

M45996 F-64 12/30/36

--""P' enf < L e L.

.jf {

\\

M46868 F-65 III.A.1.2 E00 EASE 81CY OPERATIONS FACILITY 12/38/86

- M46140 F-66 III.A.1.2 NUCLEAR DATA LINK

! M46213 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/11/83C M46284 F-68 III.A.2.2 METEOROLOGICAL DATA UPORADE 12/30/86

_ e mp l eA< 4 8 [y I

M46355 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 02/19/82C

- b g 4-*4.

/ 9 to

{

M46426 F-70 III.D.3.4 CONTROL ROOM MARITABILITY 02/09/82C i

M56182 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEN (FOLLONUP TO 85/31/86

- g re g'ch d IT2 grogd*A 11[ g6, M49695 G-81 REACTOR COOLANT PWIIP TRIP (D660 - II.K.3.5) 85/31/86 i

l I

l l

l l

l

'