Forwards Insp Repts 50-424/86-29 & 50-425/86-14 on 860428- 0502.No Violations or Deviations Noted
ML20198K002
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/15/1986
From: Brownlee V, Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20198K008 List:
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8606030286
Download: ML20198K002 (3)


See also: IR 05000424/1986029

Text

- -

. . _ - . .

.

-

-__.

-.

Ohh0

'

,,

.

I

MAY 151986

'

'

.

.

'

[ ATTN:

Georgia Power Company

Mr. R. J. Kelly

i

"

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

l

Gentlemen:

SUBJECT:

REPORT NOS. 50-424/E6-29 AND 50-425/86-14

4

i

On April 28, 1986 - May 2,

1986, NRC inspected activities authorized by NRC

Construction Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the

conclusion of the inspection, the findings were discussed with those members of -

l

your staff identified in the enclosed inspection report.

I

i

Areas examined during the inspection are identified in the report. Within these

Oreas, the inspection consisted of selective examinations of procedures and

'.

representative records, interviews with personnel, and observation of activities

4

in progress,

i

j

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the "NRC's Rules of Practice," Part 2,

j

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

j

will be placed in the NRC's Public Document Room.

i

Should you have any questions concerning this letter, please contact us.

l

Sincerely,

4

i

i

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

4

Division of Reactor Projects

r

i

Enclosure:

Inspection Report Nos. 424/86-29

'

j

and 50-425/86-14

cc w/ enc 1:

(See page 2)

l

4

!

{

0606030286 860515

{DR

ADOCK 05000424

1

'

l

PDR

I

j

i

I

ZGot

-

.,

.

4

Georgia Power Company

2

c w/ encl:

yR.E.Conway,SeniorVicePresident&

/ Project Director

4. O. Foster, Vice President, Project

-

d. Support

D. Rice, Vice President, Project

Engineering

. H. Pinson, Vice President, Project

/J. T. Beckham, Vice President &

Construction

General Manager - Operations

dt.A. Thomas,VicePresident,

j Licensing

JC. W. Hayes, Vogtle Quality

Assurance Manager

/W.C.Ramsey, Manager-

Readiness Review

/G. B. Bockhold, General Manager,

Nuclear Operations

J.Gucwa, Manager,NuclearSafety

and Licensing

/M.H.Googe, Project

Construction Manager

II.D. Groover, Quality

Assurance Site Manager -

j Construction

JJ. A. Bailey, Project Licensing

/ Manager

VG. F. Trowbridge, Esq. , Shaw,

j Pittman, Potts and Trowbridge

48. W. Churchill, Esq., Shaw,

/ Pittman, Potts and Trowbridge

JE. L. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

1J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

1J.G.Ledbetter, Commissioner,

j Department of Human Resources

JC. H. Badger, Office of Planning

) and Budget

JD. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

9l0.C.Teper,GeorgiansAgainst

j Nuclear Energy

JM. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

(cc cont'd - see page 3)

-

-

..

,

..

.

Georgia Power Company

3

/. Dr. O. H. Paris, Administrative Judge

CC Cont'd)'

Atomic Safety and Licensing Board

Panel

/G. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

/. Panel

B

P. Garde, Citizens Clinic, Director

Government Accountability Project

cc w/ encl:

. Reis, ELD

. M. Hill, IE

. Miller, NRR

. Brach, ED0

M. Sinkule, RII

W_. Rankin, RII

<6RC Resident-Inspector

v'pocument Control Desk

VState of Georgia

RII

RII

$

R(I,W

MNS

RII

44

ACunningham:cdg

TDeqk r

DCollins

MSinkule

05////86

05/ s\\/86

05/ff786

05df/86