Cp&L Carolina Power & Light Company SERIAL: NLS-86-194 Director of Nuclear Reactor Regulation Attention:
Mr. Dan Muller, Director BWR Project Directorate #2 Division of BWR Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 UPDATE OF PLANT-SPECIFIC LIST
Dear Mr. Muller:
On April 30,1986, Mr. Ernest D. Sylvester requested Carolina Power & Light Company to update the plant-specific action items list for Brunswick by May 31,1986. This list
- consists of approximately 134 items per unit. An average of one hour per item is needed to find the required information. Due to the extent of the task, we will be unable to meet the May 31 due date. Many of the "LIC ACT COMPLETE" dates have been confirmed. A mark-up providing these dates is attached. The Company expects to submit the completed update by June 30,1986.
Please refer questions regarding this matter to Mr. Stephen D. Floyd at (919) 836-6242.
Yours very truly, su -
S
. Zi merman anager Nuclear Licensing Section MAT /ccj (3941 MAT)
Attachment cc:
Mr. W. H. Ruland (NRC-BNP)
Dr. 3. Nelson Grace (NRC-Ril)
Mr. E. D. Sylvester (NRC) 8606030103 860530 DR ADOCK 0500 4
407l 411 Fayetteville street
- P O Box 1551
- Raleign. N C. 27602
~
I l
I 1
R-1208751-001 REGULAT0RY INF0RMAT ION TRACKING SYSTEM PAGE NO.
5'
-FACILITY IMPLEMENTATION 03/31/8e iACILITY: DRUriSHICK 1 PLAtIT LOCATION: 3 HI N OF SOUTHPORT, NC LICENSED POWER: 2436 Mili PROJECT MANAGER: E. SYLVESTER DOCKET flUt1B E R : 050-00325 DESIGN 00HER:
0828 MHE BRANCN CNIEF:
D. MULLER ARCil/[IlGillEER : ilEC NSSS VEllDOR:
GE LIC. ASSISTANT:
S. NORRIS IE IllSPECIOR:
ll. RULAND LIC ACT SER LICENSEE MC ND_,,
[1PA 5 TITLE COMPLETE Isse. col STATUS PAII 1807261 A-01 10 CFR 50.55 A(G) - ISI 05/19/83C 5//7/e1 1108106 A-02 APPENDIX 1 - ALARA 12/27/83C la/d7dA l1068 57 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 02/Ol/79C h kn g t/[&[77 till 39 A-04 APPENDIX J - CONTAINMENT LEAK TESTING -
11/08/77C till361 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 01/28/81C C 4,%
~
!!!0697 A-10 CONTINGENCY PLANNING 12/10/80C 1 & /10 /8 0
!!!0694 A-11 GUARD TRAINING PLANS 08/17/81C li'[t?[9l til 0699 A-12 VITAL AREA ANALYSIS 04/12/82C (d %
f142984 A-12 VITAL AREA ANALYSIS 01/26/81C url: w g T/C[T till264 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 09/05/84C 9h[Es-l143866 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 09/24/81C P/
r/r/
!!51076 A-17 INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDEN 05/14/85C SIM[6C Awd f3M//O fl55698 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 05/28/85C
- 1155645 A-19 RECOMBINER CAPABILITY BHR MARK I 04/15/86 Aledhq SER Lfal/od n/fp[s,- ggg,j afgg ggpg t159075 A-20 10 CFR 50.62 OPERATING REACTOR REVIENS N//S /
- Il07887 B-01 DIESEL GENERATOR LOCKOUT 09/11/79C Uni w%[
~f108837 B-02 FIRE PROTECTION ll/22/77C 4W/t SCR
- t108211 B-05 STRESS CORRDSION CRACKING - BHR RCSPB 10/27/79C g#f" yTcgs.un4 m. 4cc, orc /avu.c w//k
- 146655 B-05 STRESS CORROSION CRACKING - BHR RCSPB 03/31/84C 61, SV-//
t 1108186 5-06 BilR RELIEF VALVE 07/16/79C 7//W e
e R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.
F A C I'L I T Y IMPLENENTATION 03/31/F B R UtiSilI CF, 1 (CONTINUATION)
LIC ACT 500 LICENSEE I_AC_fLO MPA 8 TITLE C0ttPLETE %sd STATUS RA_IE 2
91t2122 B-16 ENERGENCY PLANilING AND REVISIDHS 06/24/81C utrmA F1088 3 3 8-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS Ol/01/70C T//s/g4 ftemMf%Qey4 f110294 B-20 COIITAINMENT LEAKAGE DUE TO SEAL DETERIORATION 01/27/81C Wk%
tt:0356 B-28 LOSS OF 125-V DC BUS VOLTAGE HITN LOSS OF ANNUtiCI A 02/28/82C u. b wg t108829 B-22 TECH SPEC SURVEILLAllCE REQUIREMENTS FOR MECHANICAL 03/17/81C 9/<o/fr</ Remy gQ(3=y TcQ(,
- 110014 B-23 DEGRADED GRID VOLTAGE 06/11/80C it/9/TT fil o l 84 B-24 VENTIllG AND PURGING C0!ITAINMENTS HHILE AT FULL P0H Ol/30/81C) 12/01/83C l Ts/sC F.w[c.ccepfab of CP,1 Pg/,gh W
!!42571 B-24 VEllTIllG AND PURGING CONTAINMENTS HNILE AT FULL P0H
/luaMig ER W CM us, s/fh t108840 B-25 BWR FEEDHATER fl0ZZLE CRACKING 11/02/81C S
1110877 B-27 REVIEH RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C IP/ad/;9 f111061 B-41 FIRE PROTECTION - FINAL TECN SPECS (INCLUDES SER S 04/06/79C1 f112047 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 06/11/80C Ma.ai/i 66k f143418 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/30/86 til l 803 B-42 IMI FOLLOH UP - ALL PLANTS 10/26/79C C-h b w w t130309 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C' F130310 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C
- H30311 B-44 LESS0tl5 LEARtlED IMPLEMENTATION 04/02/80C t13 0 31 '?
B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C
^
f150313 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C
~ tt30314 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C
!!30315 B-44 LESSONS LEARilED IMPLEMENTATION 04/02/80C f130316 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C 1130317 B-44 LESS0flS LEARilED IMPLEMENTATION 04/02/80C
R-1208731-001 REGULAT0RY kNF0RMATION TRACKING SYSTEM PAGE NO 58 FACILITY IMPLEMENTATION 03/31/8+
DRUNSil!CK 1 (CONTINUATION)
LIC ACT GER LICENSEE i_R U l0 MPA 8 TITLE C.9MPLETE Tsweac/
STATUS
- p_Alf, A
2
~
t130318 B-44 LESSofl5 LEARNED IMPLEMENTATION 04/02/80C 1 f130319 D-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C - ()d o%
1130320 D-44 LESSONS LEARNED IMPLEMENTATIDH 04/02/80C til2894 B-45 HASil 1400 EVENT V,
" PRIMARY COOLANT SYSTEM PRESSUR 08/08/80C 8[?[60 1112829 B-48 ADEQUACY OF STATIDII ELECTRIC DISTRIBUTION VOLTAGE 05/29/85C ll/9[f'/
3/td.[fl f7%d 3//,y f142970 n-54 LESSONS CATEGORY A TECH SPEC 03/16/81C 1141074 B-56 CONTROL RODS FAILURE TO INSERT. BHR 06/15/81C 6//5[tf ti42207 B-58 SDV CAPABILITY 08/05/82C P/5/G f/550/d
!!42876 B-59 NASONRY HALL DESIGN 01/30/85C S/s[gr it42484 B-60 EtaVIRONMENTAL QUALIFICATION 03/05/85C r142657 B-61 LOSS OF NON CLASS IE 18C PDHER 07/28/82C}
M42727 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 06/19/8tC' Li&wn t143891 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 07/21/8tC 1143737 B-65 SAFETY CONCERNS ASSOCIATED HITH PIPE BREAKS IN BHR 12/31/85C, t151673 B-72 IIUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 03/28/84C 3 /av/qu/
F152742 B-76 ITEM 1.1 - POST TRIP REVIEHf PROGRAM DESCRIPTI0tl &
04/15/85C '/#6&T
- t152823 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 01/31/87 10/03[85' 7/'8[8%
't' 8 b!&k N52904 B-78 ITEMS 3.1.1 8 3.1.2 -POST MAINTENANCE; TEST PROCEDU 10/23/85C
/
1152985 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 07/16/85C 7//6[Es~
~M54521 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-08/13/84C 6'/17/@2/
1155593 B-84 IflSPECTIONS OF BHR STAIHLESS STEEL PIPING ACCORDIN 07/01/85C 7///8f t153574 B-85 SALEM ATHS 1.2 DATA CAPABILITY 06/10/85C 4//CM 1153657 B-86 SALEM ATHS 2.2 S-R COMPONENTS 01/30/87
~~
I o
R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO.
I FACILITY I M P. L E M E il T A T I O N 0 3/ 31 <
BRUtiSilICK 1 (CONTIllUATION)
LIC ACT SE R LICENSEE TA_Q_NO.
MPA B TITLE COMPLETE Jeswd STATUS AAJJ A
!!53740 B-87 SALEM ATHS 3.2.1 8 3.2.2 S-R COMPollENTS 12/31/86 T153823 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 07/16/85C 7#4/& T M54050 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES 07/01/85C 7[f[5cv M53967 B-95 SALEM ATHS 4.5.2 8 4.5.3 TEST ALTERNATIVES 09/30/86 f108263 C-02 B11R-RECIRC. PUMP TRIP ( ATHS) 08/20/79C (14%
N06662 C-08 DHR POST LOCA H2 CONTROL 05/07/8tC SeeTPrs u r 1107976 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 05/18/84C r//s-/sy
$[3[ga it08928 C-11 RPS POWER SUPPtY 08/03/82C t152213 C-15 CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA 06/28/85C 6/a%[EC J//9/h'/ Mols dmp II[/t[GS' QTEP_{ fo/
'( ME Ps 1f07932 D-01 GE MARK I C0tlTAINMENT EVALUATION - LONG TERM 03/19/84C 1111138 D-09 GE ECCS IllPUT ERRORS 04/06/79C
/[4[27 Amedcd d_3aM7 M10077 D-11 FISSION GAS RELEASE 10/13/78C Udww 1112186 D-15 HIGli ENERGY LINE BREAK & CONSEQUENTI AL SYSTEM FAIL 01/31/84C 16 t112194 D-16 REVIEH OF CORPORATE MANAGEMENT CAPABILITY 10/Ol/80C RIP Closed &
Q g[f
/Q/E'/7STasvM M12443 D-17 DEFINITION OF OPERABLE 09/05/80C 1155843 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 04/30/86
//mHi
$ER
.M57147 D-20 MARK I DRYllELL VACUUM BREAKERS - LICENSEE RESPONSE 05/30/86 Awca Ni f6R 1111335 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL 04/06/79C R$E{1,4 50.69 /ssd s/r/- &f
- f148489 E-04 BHR SINGLE LOOP OPERATION 05/08/85C CPet.;R a w g f p,4 g gg g w
f144007 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR Ol/20/82C g/g[q
- M44075 F-02 I.A.1.3 SHIFT MANNING 06/30/83C d./3>/&3 V[#P[&A M64146 T-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 04/29/83C f944217 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GEtIERIC 06/07/84r l'ewN T-
9 R-1208731-001 REGULAT0RY INF0RMAT ION TRACKING SYSTEM PAGE NO.t 5
FACILITY IMPLEMENTATIDN 03/31/8 DRUf1513ICK I (CONTINUATION)
LIC ACT SE R LICENSEE IBC__IIO.
t1P_A _t TITLE COMPLETE
-f" M STATUS
- p_41f, 1144287 F-05 I.C.1.2/3.8 PROCEDURES GENERATION PACKAGES (NUREG 08/30/86 t147200 F-06 I.C.5 FEEDBACK OF OPERATING. EXPERIENCE 12/08/8tC la/E/ft t147272 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 12/08/81C Ja/Pg/
f151146 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 05/06/85C #A 4,ual fie.
1151226 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYS, TEM 05/16/85C
- A ka/ SQ f144358 F-10 II.B.1 RCS HIGH POINT VENTS 10/01/82C to/rk
- 147924 F-It II.B.2 PLANT SHIELDING 01/27/83C s/,;t793 f
f144426 F-12 II.B.3 POST ACCIDENT SAMPLING 05/08/84C sp$/gt[a,tc/ fogg 1144496 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 04/29/83C
<//aT/P3 t144567 F-14 II.D.1 RV AND SV TRAINING 10/31/83C fo[h 1144764 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 11/09/82C T/o/Sr MEP l C/C'/'K (3sEP-n
/
t146835 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY ll/03/82C t;/r/&R f*or Sc%s f awf 7 1144906 F-20 II.F.1.1 NOBLE GAS MONITOR 05/05/82C s-/r/ga
!!44977 F-21 II.F.1.2 IDDINE/ PARTICULATE SAMPLING 05/05/82C g/r/gg f145048 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 11/22/82C
,fAa/gg f147585 F-23 II.F.I.4 CONTAINMENT PRESSURE INSTRUMENT 07/30/84C 7/348T
- t147656 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 07/30/84C yas/s'/
F147721 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 07/30/84C
'p/Npy 1145119 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 01/08/85C r/a'irgs-lits 15 l[ idrowd -lo em.c/af4 t
~ t145328 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 04/26/82C M4.ND-t145535 F-43 II.K.3.13 HPCI AND RCIC INITIATION LEVELS 06/17/83C 4//7M f145563 F-45 II.K.3.15 ISOLATION OF NCPI AND RCIC MODIFICATION 08/04/82C 7/M'[WL h45587 r-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE
- /MSI 11/tr/84C e
,.a..
a-e
/
R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
FACILITY IMPLEMENTATION 03/31, BRUf15311CK 1 (CONTINUATION)
LIC ACT SE8P-LICENSEE MC 180.
MPA 1 TITLE COMPLETE Estod STATUS PALE
_. II45614 F-47 II.K.3.17 ECCS OUTAGES 10/17/83C to//?/ 3 I
F14568 3 F-48 II.K.3.18 ADS ACTUATION 05/18/84C C[/li[PV
~
1145707 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 07/24/8tC
?[c<//&/
t145731 F-50 II.K.3.21 RESTART OF CSS AND LPCI 10/26/82C fo[ar.g r?47852 F-51 II.K.3.22 RCIC SUCTION 05/05/83C g/r/g3 t146717 F-52 II.K.3.24 SPACE COOLING FOR HPCI/RCIC MODIFICATIO 10/Ol/82C jo[s/ftL M45755 F-53 II.K.3.25 P0HER ON PUMP SEALS Ol/06/83C t[4M 1145779 F-54 II.K.3.27 COMMON REFERENCE L EVEL 07/07/81C so/7kg 1148263 F-55 II.K 3.28 QUALIFICATION OF ADS ACCUMULATORS 06/15/84C f//r[fr'/
M45810 F-57 II.K 3.30 SB LOCA METHODS Ot/04/84C
//e/[F//
M48151 F-58 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 12/15/83C f/Y[FY M45879 F-59 II.K.3.44 ANTICIPATED TRANSIENIS HITH SINGLE FAIL 12/17/8tC la//7/P/
F145903 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 05/18/83C k/6/93 M45930 F-63 III.A.I.2 TECHNICAL SUPPORT CENTER 04/30/87 \\
l-Y3 t146001 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 04/30/87 Y
P146073 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 04/30/87 /
I*
N NY[E& N t146145 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C uk E%g t146217 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/18/83C r//tr/93
- t146289 F-68 III.A.2.2 METEOR 0 LOGICAL DATA UPGRADE 04/30/87 Adlig NEC Bo-fiog o( SECT / 60-//
~ t146360 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 04/26/82C
- 1/f7p 1146431 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 10/18/83C sops /pg
.t156107 F-71 I.D.1.2 DETAILED CONTROL R00M REVIEH (FOLLOHUP TO 06/30/87 7.
l-
e
,;-1208731-001
'R E G U L.A T 0 R Y kNF0RMAT'I0'N T R A C'K'I N G SYSTEM PAGE NO.
68-FACILITY IMPLENENTATION 03/31/8e FACILITY: BRUNSHICK 2 Pt. AtIT L OCAT I0ti: 3 MI N OF S0.fiHPORT, NC LICENSED POWER: 2436 Mitt PROJECT MANAGER E. SYLVESTER Ut1CKET 83 UMBER: n50-00324 DESIGN P0HER:
0821 MHE BRANCH CHIEF:
D. MULLER ARClf/ E FIGI t1E E R r IIEC NSSS VENDOR GE 8IC. ASSISTANT:
S. NORRIS IE Ill5PECTUR:
- 11. RULAND LIC ACT
- ER LICENSET J AC _ tio.
MPA 8 TITLE LOMPLETE Jesuec/
STATUS LM1 f110963 A-01 10 CFR 50.55 A(G) - ISI 05/19/83C 5'/#43
- 110906 A-02 APPENDIX I - ALARA 12/27/83C 1A47[r3 t108842 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 02/01/79C
(/Ag 1111140 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 11/08/77C f/((77 HIO695 A-10 CONTINGENCY PLANNING 12/10/80C I,t/to/fo E110693 A-11 GUARD TRAINING PLANS 08/17/81C 8 /17/4 /
E110698 A-12 VITAL AREA ANALYSIS 04/12/82C Unknwn.
1142985 A-12 VITAL AREA ANALYSIS 01/26/81C Unbwn til l 265 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 09/05/84C 9/r/89 1143867 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 09/24/81C T/aV/f/
t151077 A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 05/14/85C
<//y/'rrr t155699 A-18 IECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 05/28/85C
.s-bs/'Frt-MwQ FJQg
/
A M igfik MaMnq/ /o[as-h
- 155646 A-19 RECOMBINER CAPABILITY BHR MARK I 04/85/86 4 yy g
t159076 A-20 to CFR 50.62 OPERATING REACTOR REVIENS N//S /
t107888 B-01 DIESEL GENERATOR LOCKOUT 09/11/79C Unkw %
I?weldig TR t1068 38 B-02 FIRE PROTECTION 11/22/77C
-fl00212 B-05 STRESS CORROSION CRACKING - BHR RCSPB 10/17/79C, y m
g g
,4 M46656 B-05 STRCSS CORROSION CRACKING - BHR RCSPB 03/13/84C 6-1. F</-//
1108187 B-06 BHR RELIEF VALVE 07/16/79C 7//4/77
- t112123 B-16 EMERGENCY PLANNING AND REVISIONS 06/24/81C f/nkhow A em
e R-1208751-001 REGULAT0RY INF0RMATION T R A C K I il G SYSTEM PAGE NO.*'
e FT0ILITY I M P L E M E fl T A T I O N 03/31/f DRUtisi!ICK 2 (CONTINUATION)
LIC ACT 8ER LICENSEE JAG _lh MPA 8 TITLE C0t1PLEIE L8M SilLQ3 PALE It08832 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SHUBBERS 05/16/80C 'T[st/t</ Re % ved 6 M h e % Ies 11:0295 B-20 CollTAltiMENT LEAKAGE DUE TO SEAL DETERIORATION 01/27/81C (Ak.uw tit 0358 B-21 LDSS OF 125-V DC BUS VOLTAGE HITH LOSS OF AHilUtlCIA 02/28/82C t.M:m aun It08828 B-22 TECil SPEC SURVEILLAtICE REQUIREMENTS FOR MECHANICAL 03/17/81C T/M[fT bemvec/ 8hOrYb tit 0013 B-23 DEGRADED GRID VOLTAGE 06/11/80C tt/9,'Ed/
f110183 B-24 VEllTING AtID PURGING CONTAINMENTS HHILE AT FULL POW 01/27/81C
- 5l20/lW R& ACCfhoe oS ops-L R>g&Q tt42572 B-24 VElliING AtID PURGING CONTAIHMENTS HilILE AT FULL P0H 12/01/83C l
H08839 B-25 BHR FEEDHATER fl0ZZLE CRACKING ll/02/81C /7 m ;fiq SER 4c t f cpi-L LT fr//s-/6s-t110973 B-27 REVIEH RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 08/22/79C 8/oV/77 tt10878 B-27 REVIEH RESPONSES TO IE BULLETIN 78-03 (DFFGAS EXPL 08/22/79C f/M/79 t111062 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/06/79C Otadify 1
til 2048 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 06/11/80C f143417 B-41 FIRE PROTECTIDH - FINAL TECH SPECS (INCLUDES SER S 04/30/86 ftII804 B-42 TMI FOLLDH UP - ALL PLANTS 10/26/,79C (AkkowA 1130369 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C F130370 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C
!!30371 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C r130372 B-44 LESSONS LEARHED IMPLEMENTATION 04/02/80C _g,4 f130373 B-44 LESSONS LEARilED IMPLEMENTATION 04/02/50C
~
tt30374 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C r130375 B-44 LESSONS LEARHED IMPLEMENTATION 04/02/80C 1130376 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C i
M30377 B-44 LESSONS LEARilED IMPLEMENTATION 04/02/80C 7
t R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.*
6; FACILITY IMPLEMENTATION 03/31/8-BRU13SHICK 2 (CONTINUATION)
LIC ACT 3f4 LICENSEE TACJ10 t1PA 8 TITLE COMPLETE rrscacl STATUS PAlf.
2
- 130378 B-44 LESSONS LEARflED IMPLEMENTATI0fl 04/02/80C F130379 B-44 LESSONS LEARilED IMPLEMENTATION 04/02/80C,4g t130380 B-44 LESSONS LEARNED IMPLEMENTATION 04/P2/80C t150381 B-44 LESSONS LEARNED IMPLEMENTATION 04/02/80C
~ (192895 B-45 HASN 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 08/08/80C 3/&[SO t142072 B-46 ANALYSIS OF TURBINE DISC CRACKS 05/05/81C dh ww.
t1128 30 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 05/29/85C ll/TJ6Y 1142971 B-54 LESSONS CATEGORY A TECH SPEC 03/16/81C I///./f/ dNeds F/adCC
~
IM1075 B-56 CONTROL RODS FAILURE TO INSERT. BHR 06/15/8tC 4/tr[e/
(142208 B-58 SDV CAPABILITY 08/05/82C &/C/bt 1142877 B-59 MASONRY HALL DESIGN Ol/30/85C t/30/er IM248 5 B-60 ENVIRONMENTAL QUALIFICATION 03/05/85C 2/s"/6C IM2658 B-61 LOSS OF NON CLASS IE.I8C PONER 07/28/82C udwou x.
IM2728 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 06/19/81C uroknow IM3892 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 07/12/82C d < howh IM3735 B-65 SAFETY CONCERNS ASSOCIATED HITN PIPE BREAKS IN BHR 12/31/85C dukww f151672 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 03/28/84C J/Mr/W F152743 B-76 ITEM 1.1 - POST TRIP REVIEHs PROGRAM DESCRIPTION &
04/15/85C '///C[Ef r152824 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION 8 VENDOR INTER 01/31/87
~t152905 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 10/23/85C lo/u/tr, */[s[8C, &[GP/W t152986 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES 10 07/16/85C 7//MW
- 154522 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-08/13/84C R//T[6'/
t155594 B-84 INSPECTIONS OF BHR STAINLESS STEEL PIPING ACCORDIN 07/Ol/85C 7///M 7
R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE 130.
6 FACILITY IMPL ENENTAT I O II 0 3/ 31/ P, flRUt4SHICK 2 (C0t4 T IFIUAT I ON)
LIC ACT sir LICENSEE J A_Q_J10 t1PA 8 TITLE CUttPLETE Led 3J4TUS M
2 ItS3575 B-85 SALEM ATHS 1.2 DATA CAPABILITY 06/10/85C 4//o/55 1153658 B-86 SALEM ATHS 2.2 S-R COMPONEtaTS 01/31/87 ftS3741 B-87 SALEM ATHS 3.2.1 8 3.2.2 S-R COMPONErlTS 12/31/86 ftS3824 B-88 SALEM ATHS 3.2.3 T.S.
S-R COMPONEtlTS 07/16/85C 7///-/%f it54051 B-92 SALEM ATHS 4.5.8 DIVERSE TRIP FEATURES 07/01/85C 7///W ttS3968 B-93 SALEM ATHS 4.5.2 8 4.5.3 TEST ALTERilATIVES 09/30/86 ft08264 C-02 BliR-RECIRC. PUMP TRIP ( ATHS) 08/20/79C 6kkwom It06 046 C-08 BHR POST LOCA 112 CONTROL 05/07/81C
.See 77sT4yr 1107977 C-10 C0flTROL OF HEAVY LDADS OVER SPENT FUEL POOL (PHASE 05/18/84C <//fr/W 1108927 C-11 RPS P0HER SUPPLY 08/03/82C F/:r/G EtS2214 C-15 CONTROL OF llEAVY LOADS - PHASE II (FDLLONUP OF MPA 06/28/85C 4/M[ef J//9[PV /~[oc/s b, #[/0[(rS* ftfEP.; to/as[ErV Bsce.4 i!07933 D-01 GE MARK I C0tlTAINMEtiT EVALUATION - L0ilG TERM 03/19/84C p
ft10078 D-11 FISSI0tl GAS RELEASE 10/13/78C U,t 6w%
til2187 D-15 HIGil EllERGY LINE BREAK & CONSEQUEtITIAL SYSTEM FAIL 01/31/84C u,4w.ww
' 1112195 D-16 REVIEH OF CORPORATE MANAGEMENT CAPABILITY 10/01/80C
&z P cl % f g, g g 7,7gg it 2444 D-17 DEFIt4ITI0tl 0F OPERABLE 09/05/80C da/2Y Ts ru M
~ t155844 D-19 DIESEL GEPIERATOR RELIABILITY TECH SPECS (GL 84-15) 04/30/86 dwarfigsER 1157148 D-20 MARK I DRYHELL VACUUM BREAKERS - LICENSEE RESPONSE 05/30/86 Amn.ifig ER:
I
' TM6 779 E-04 BHR SINGLE LOOP DPERATIDH 05/08/85C cPvt.w;11d= Wi Tg dhggggg
~t144 0 08 F-DI I.A.I.I SHIFT TECHNICAL ADVISOR 01/20/82C I/liiP[PA 4/38[P3 t144076 F-02 I.A.1.3 SHIFT ?".N!!itlG 06/30/83C ft44147 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 04/29/83C *//A?/83
'It44218 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C iM.kh* w N 7
O R-1208131-001 REGULATCRY I N F G R H A T I O fl TRACK ING SYSTEM PAGE 110.
e.
FACILITY I M P L E M E II T A T I O N 03/31/F DRUt4SHICK 2
( CotiT IriUAT I 0ft )
LIC ACT 3rE LICENSEE IBC_t10 MPA 8 TITLE G_0EL_tJ1 5" M STATUS RALE
~
tt44288 F-05 I.C.1.2/3.5 PROCEDURES GEf3ERATION PACKAGES (fiUREG G8/30/86 P14 7201 T-06 I.C.5 FEEDBACK OF OPERATING EXPERIEllCE 12/08/8tc f;/8/&f r147273 T-07 I.C.6 CORRECT PERFORMAtiCE OF OPERATItIG ACTIVITI 12/08/81C /D/f/PI tt51147 T-08 I.D.1.1 DETAILED CutlTROL ROOM DESIGil REVIEH PROGRA 05/06/85C /4 Fira/IER-t!51227 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 05/16/85C Ah fie lSffi 1144359 r-10 II.B.1 RCS HIGH POINT VENTS 10/22/82C A/s/8.2 Wi7925 F-11 II.B.2 PLAtli SHIELDING 01/27/83C t/a*/[P3 ft44427 T-12 II.B.3 POST ACCIDENT SAMPLING 05/08/84C Wh/EVa.d JD[d7[83 1144497 F-13 II.B.4 TRAltlIllG FOR MITIGATING CORE DAMAGE 04/29/83C 2//cT[ed 1144568 T-34 II.D.1 RV AllD SV TRAINING 10/31/83C
- D[U[P1 it4476 5 T-18 II.E.4.1 DEDICATED HYDROGEN PEllETRATION 11/19/82C *?/to/Trs-RTEf*.i C/r/fr(. f?s E.P4 ft44836 r-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY t1/03/82C ll/s[e l fov-Jfew d a.Q '/
e 1144907 F-20 II.F.1.1 130BLE GAS MONITOR 05/05/82C s/r/ fat E144978 T-21 II.F.1.2 IDDINE/ PARTICULATE SAttPLING 05/05/82C r/r[FJ s/h0/PA
~~
r145049 F-22 II.F.1.3 C0tlTAlt4 MENT HIGil RAtlGE MONITOR 11/22/82C T147586 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 07/30/84C 7/b[b'V
- !!47657 F-24 II.F.I.5 C0t!TAINMENT HATER LEVEL INSTRUMENT 07/30/84C *l/to[Trf t147728 T-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 07/30/84C 7/M/d f/8T[PS~ Ek_l/ Laf.ib cecom,.,[4 g4 *'/et 0-;t
- t145120 F-26 II.F.2 INSTRUMEtlTS FOR DETECTI0ft ON INADEQUATE 01/08/85C
/*9 4-/
Y t145329 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 04/26/82C V/M(/M
- 1145536 F-43 II.K.3.13 HPCI AND RCIC INITIATION LEVELS 06/17/83C 4/t?/93 4145564 T-45 II.K.3.1S ISOLATION OF HCPI AND RCIC MdDIFICATI0ti 08/01/82C */[M eA
[
n43588 r-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE 11/14/84C #f/d[FY t
L,,
R-1208731-001 REGULAT0RY INF0RHATION T R A C K I fl G SYSTEM PAGE 110.2 v
FACILITY I M P L E M E fl T A T I O il 03/ 31 n ftRutisilICK 2
( C0t3 T IFIUA TI ON )
LIC ACT adR LICENSEE I ACJ0 MPA 8 TITLE
_Ut1P L ( I E Tv5 STATUS Mil 2
814 5 > 15 F -(* 7 II.K.3.17 ECCS DUTAGES 10/17/83C 10/r7/F3 r[/E[&f ft45684 F-48 II.K.3.18 ADS ACTUATION 05/18/84C f145708 F-49 II.K.3.19 It3TERLOCK RECIRCULATION PUMP MODIFICATI 07/24/81C 7[-W[?/
F145732 F-50 II.K.3.21 RESTART OF CSS AfID LPCI 10/26/82C J D[al-[frJ-s-/r[03 f147853 F-51 II.K.3.22 RCIC SUCTION 05/05/83C fo[/[ED.
f146718 F-52 II.K.3.24 SPACE COOLING FOR HPCI/RCIC MODIFICATI0 ID/22/82C 1145756 F-53 II.K.3.25 Poller ON PUMP SEALS Ol/06/83C s/4/Q f145780 F-54 II.K.3.27 Cot 1 MON REFERENCE LEVEL 07/07/8tC Jo/T[St 6[/kW f148264 F-55 II.K.3.28 QUALIFICATI0!I 0F ADS ACCUMULATORS 06/15/84C t/e/[EY F14 581 F-57 II.K.3.30 SB LOCA METHODS Ol/04/84C t148152 F-58 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 12/15/83C l['//W F145880 F-59 II.K.3.44 At1TICIPATED TRANSIEFITS HITH SINGLE FAIL 12/17/81C
/A//7[E-/
T145904 F-60 II.K.3.45 MAliUAL DEPRESSURIZATION 05/18/83C E[#'/B t145931 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 04/30/87 N Nec A4 // ALM;/,%g'A g]. P69 t146002 F-64 III.A.1.2 OPERATI0flAL SUPPORT CEllIER 04/30/87
/
f146 07 4 F-65 III.A.1.2 EF1ERGENCY OPERATIDHS FACILITY 04/30/87 7
b MT (146146 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C (JA%
f146218 F-67 III.A.2.1 EMERGENCY PLAN UfGRADE TO MEET RULE 05/18/83C r/rE/P3 M46290 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 04/30/87 fueG/i$ UQc. 44 % o g gcypa,yf
-t!46361 F-69 III.D.3.3 IMPL AFIT RADIATION M0rlITORING '
04/26/82C 3/*r[Pa f146432 T-70 III.D.3.4 CorIIROL ROOM HABITABILITY 10/18/83C to/t9-/g-3 1,156108 F-71 I.D.1.2 DETAILED C0f1 TROL ROOM REVIEH (FDLLOHUP TO 06/30/87 x
-J