ML20198J246
| ML20198J246 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/20/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| References | |
| NUDOCS 8606030006 | |
| Download: ML20198J246 (1) | |
Text
'
ONic/Al MAY 2 01996 FloridafowerCorporation ATTN: vNr. W. S. Wilgus Vice President Nuclear Operations P. O. Box 14042, M.A.C. H-2 i
St. Petersburg, FL 33733 l
Gentlemen:
SUBJECT:
DOCKET NO. 50-302 We have completed our review of the revision dated July 30. 1985, of the Florida Power Corporation, Corporate Emergency Plan.
Our review indicates that your emergency plan changes meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan. However, if your safety review indicates no decrease in emergency preparedness, then changes can be made without NRC approval.
In all cases you should furnish copies of each change to the NRC in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V (Implementing Procedures).
Should you hue any questions regarding this letter, please contact Mr. Thomas R. Decker of our staff at (404) 331-2600.
Sincerely, David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects cc:
- 9. F. McKee, Nuclear Plant Manager vt. R. Westafer, Manager Nuclear Operations Licensing and Fuel Management bec.
RC Resident Inspector Document Control Desk VState of Florida RII RII R
R RI)
$lfb b
MPoston-Brown T0e ker DCollins FGu nther SElrod 5/Hy86 5/
86 5//pe6 5/li/86 5/()/86 8606030006 860529 PDR ADOCK 05000302 F
PDR 4
2E35
- -