ML20198J148
| ML20198J148 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/23/1986 |
| From: | Travers W Office of Nuclear Reactor Regulation |
| To: | Harold Denton, Miraglia F Office of Nuclear Reactor Regulation |
| References | |
| CON-NRC-TMI-86-051, CON-NRC-TMI-86-51 NUDOCS 8605300694 | |
| Download: ML20198J148 (4) | |
Text
...
Co-wo.
~
f "^
J Hay 23, 1986 NRC/THI-86-051 MEMORANDUM FOR:
Harold R. Denton, Director Office of Huclear Reactor Regulation Frank J. Miraglia, Director Division of PWR Licensing-B FROM:
William D. Travers, Director THI-2 Cleanup Project Directorate SUSJECT:
NRC THI-2 CLEANUP PROJECT DIRECTORATE WEEKLY STATUS REPORT FOR MAY 19 - 23, 1986 1.
DEFUELING Pick and place defueling activities resumed on May 23, 1986. The c
number of canisters transferred to the fuel pool remains at 42.
The second of four batches of the Reactor Coolant System (RCS) draindown and refill process was completed on May 22, 1986.
Batch three of the RCS draindown and refill will start late on May 23, 1986 with refill to be completed on Hay 24, 1986. Defueling operations will be performed on May 25, 1986 and the fourth batch of drain and refill will be performed next week.
Both of the defueling work platform jib cranes have been modified and returned to service.
2.
PLANT STATUS The reactor remains in long tem cold shutdown, vented to the atmosphere. Core cooling is by natural heat loss to ambient building atmosphere. The average incore thermocouple reading is 89*F. Water visibility is approximately 1 foot.
The airborne radioactivity on the defueling platform is about 7.0 E-7 uC1/cc Tritium and 2.7 E-11 uCi/cc particulates, predominately 4
Cesium-137. The platform is mounted above the modified internals indexing fixture which is mounted over the reactor vessel. These provide about 15 feet of water over the core region and 6 feet over a
the carousel holding the defueling canisters.
3.
WASTE MANAGEMENT The Submerged Demineralizer System and EPICOR II are in temporary shutdown.
e e
or recs >
g 53go g $bo g g R
e P DR.......
- Ges>
L Nzc ronu ne no so Nacu o24o OFFICIAL RECORD COPY
-l
.o c,
Harold R. Denton 2
l'ay 23,1986 Frank J. Miraglia NRC/TilI-86-051 4.
EftVIRONMEllTAL flotlITORING Results fron US Environmental Protection Agency (EPA) analysis of the NRC outdoor air sampler for the period May 8 - 15, 1986 a re :
Profilter I-131 - 2 1 E-14 uCi/cc Cs-137 - 1.9 0.6 E-14 uC1/cc Charcoal Filter I-131 - 8.5 4.2 E-13 uCi/cc The same sampler for May 15 - 22, 1986 resulted in concentrations of Cs-137 and I-131 below the analysis lower limit of detectability of 1.1 E-13 uCi/cc. The results for the fiay 8 - 15, 1986 period are consistent with those obtained from other samplers in the area and the State, and are attributed to fallout associated with releases from the Charnobyl reactor.
EPA sample analysis results show that TMI site liquid effluents are in accordance with regulatory limits, NRC requirements, and the City of Lancaster Agreement.
THI water samples taken by EPA at the plant discharge (includes TitI-1 and Tl1I-2) to the river consisted of seven daily composite samples taken from May 3 - 10, 1986. A gama scan detected no reactor related activity above ti'e lower limit detectability.
Th' Lancaster water sample taken at the water works intake and analyzed by EPA consisted of a seven day composited sample taken from Hay 4 - 10, 1986. A gamm scan detected no reactor related radioactivi ty.
5.
AUXILIARY AND FUEL HANDLIllG BUILDING ACTIVITIES Preparations are being made for cleaning up the highly contaminated auxiliary building sump room. A gross water flush will reduce the contamination levels to provide easier access.
Assembly has continued on the desludging systen which will be used first on the neutralizer tanks and then on the auxiliary building sump.
An acceptance testing program is being done for the rail car nounted shipping casks. The testing involves all the components of the system which renoves core shipping canisters from the "A" Spent Fuel Pool and loads then into the cask. The testing progran will also be conducted on the system which removes the cask from the rail car and lifts it frcm the horizontal shipping position to the vertical loading position.
6.
NRC EVALUATIONS Ill PROGRESS Technical Specification Change Request number 49, and 51.
Recovery Operations Plan Change number 31, 33, 35, and 36.
Core Stratification Safety Evaluation (Revision 3).
OF FICE )
wn~ >
ZAC FORM 318 00 80) NRCM O240 OFFICIAL RECORD COPY
=
1*
liarold R. Denton 3
flay P.3,1986 Frank J. Miraglia f1RC/TMI-86-051 Solid Maste Facility Technical Evaluation Report.
Reactor Building Sump Criticality Safety Evaluation Report.
Canister llandling and Preparation for Shipment Safety Evaluation Report.
Defueling Canister Technical Evaluation Report, Revision 2.
signed by John White for:
Uilliam D. Travers Director Ti!I-2 Cleanup Project Directorate OF FICE )
'S>""^"'>
DATE)
., N RC F O T.M 318 (10 80) NRCM O240 OFFICIAL RECORD COPY
W, Harold R. Denton 4
flay 23,1986 Frank J. iiiraglia fiRC/T!11-86-0S1 IfiTERilAL DISTRIBUT10!i ED0 OCC Office Directors Conraissioner's Technical Assistants flRR Division Directors tJRR A/D's Regional Administrators IE Division Directors TAS EIS TMI Cleanup Project Directorate (10)
PilS EPA DOE RI Division Directors Public Affairs, RI State Liaison, RI THICPD HQ r/f TliI SITE r/f CEfiTRAL FILE fiRC PDR LOCAL PDR THI-2 Project Section File
=
I o" = > mgPp,,,,,, Jgg/D p,1
,pp p,,,,,,
aa~~ > LJ, 4;jes,,fW D g
JWhite........W)vers...+.
^n> 5/4,,gg,,,,,,gg3/00..... 5/J5/06.......5/0/06...................
unc ronu sis siosoi uncu ou OFFICIAL RECORD COPY