ML20198H882
| ML20198H882 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 12/23/1998 |
| From: | Collins S NRC (Affiliation Not Assigned) |
| To: | Walter MacFarland ILLINOIS POWER CO. |
| Shared Package | |
| ML20198H886 | List: |
| References | |
| TAC-M85535, NUDOCS 9812300048 | |
| Download: ML20198H882 (5) | |
Text
__
p //d/
- e Mt P
g
'a UNITED STATES j
NUCLEAR REGULATORY COMMISSION e
WASHINGTON, D.C. 3066dH1001
/
December 23, 1998 Mr. Walter G. MacFarland IV Senior Vice President Clinton Power Station P.O. Box 678 Mail Code V275 Clinton,IL 61727
SUBJECT:
RELAXATION OF CONFIRMATORY ORDER MODIFYING LICENSE FOR THE CLINTON POWER STATION, UNIT 1 (TAC NO. M85535)
Dear Mr. MacFarland:
By letter dated December 7,1998, you requested relaxation of the Confirmatory Order Modifying License (Order) issued June 26,1998, for the Illinois Power (IP) Clinton Power Station (CPS). The Order confirmed IP's commitment to complete implementation of Thermo-Lag 330-1 fire barrier corrective actions by December 31,1998. You proposed that the specific completion date of December 31,1998, be changed to a non-specific completion date of prior to startup from the current shutdown.
The reasons you gave for requesting the change include: (1) IP has continued to implement Thermo-Lag 330-1 fire barrier corrective actions since the issuance of the Order, (2) significant progress has been made on the corrective actions during the extended outage, (3) considerable engineering resources are required to implement the corrective actions, (4) IP resources are being used for other CPS recovery activities, and (5) the request is consistent with your intent to complete the corrective actions during the current outage, while accounting for slippage of the projected startup date that has occurred since issuance of the Order.
Based on the information provided, I find that the completion date for implementation of Thermo-Lag 330-1 fire barrier corrective actions at CPS may be changed from December 31, 1998, to prior to startup from the current shutdown.
Que stions concerning this letter should be addressed to the NRC Project Manager, Jon B.
Hopkins, (301) 415-3027.
$ ho$$)h, PD i
g[
3 L.
h7
\\
)..
7 I
W. MacFarland IV. in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, r
a ih or Office of Nuclear Reactor Regulatbn I
Docket No. 50-461 cc: See next page
)
~
W. MacFarland IV December 23, 1998 in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, etsmal sy*d byu Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No. 50-401 cc: See next page DISTRIBUTION Docket File PUBLIC SCollins RZimmerman BBoger EAdensam SRichards LMarsh ACRS OGC GGrant, Rill AKugler DOCUMENT NAME.d:\\PD3-3\\CLINTON\\TLAG_2.LTR:
OFFICE PM/PD33 LA/PD33 D/PD33 c/
SPLB NAME JHopkins/ / EBarnhill@
SRichardse[ LMarsh[K DATE
[hl$98 b lA//$98 Q/14/98 lt/[Q98 p,Grffgjf D/D@p ADP m!-
d/Nd OFFICE EAdensam BBoger l)
(Sdollins h[hh NAME M)98 lM/98 l'/SY98 Q l/98 DATE T 'l OFFICIAL RECORD COPY
I W. MacFarland IV December 23, 1998 in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, kl d%&
I I
Samuel J. Collins, Director Office of Nuclear Reactor Regulation Docket No. 50-461 cc: Seo next page DISTRIBUTION Docket File PUBLIC " "
SCollins RZimmerman BBoger EAdensam SRichards LMarsh ACRS OGC GGrant, Rlli AKugler DOCUMENT NAME G:\\PD3-3\\CLINTON\\TLAG_2.LTR:
OFFICE PM/PD33 LA/PD33 D/PD33 C/
SPLB NAME JHopkins/ /
EBarnhillOh SRichards<[ LMarsh[(4 DATE
[h$98 b lA//$98 13/I$/98 lL/[Q98 AC Pfj,)[
D/DPfp ADP g
d/Nh 0FFICE e^densem BBo9er tsdoiiins KliF6)
NAME DATE h)98 f)/Jj/98 I'/SY98 jfl53/98 I 'T OFFICIAL RECORD COPY
s Joseph V. Sipek Clinton Power Station, Unit 1 Illinois Power Company cc:
Walter G. MacFarland IV lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station ATTN: Mr. Frank Nizidlek P.O. Box 678 1035 Outer Park Drive Clinton,IL 61727 Springfield,IL 62704 Wayne Romberg Leah Manning Stetzner Manager Nuclear Station VP, General Counsel & Corp. Secretary Engineering Department 500 South 27th Street Clinton Power Station Decatur,IL 62525 P.O. Box 678 Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Region ll1 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County c/o County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL 60603