ML20198G514

From kanterella
Jump to navigation Jump to search

Comments on Power Upgrade Package.No Electrical Sys Design Changes or Load Changes Indicated
ML20198G514
Person / Time
Site: 05000000, North Anna
Issue date: 11/07/1985
From: Srinivasan M
Office of Nuclear Reactor Regulation
To: Jensen W
Office of Nuclear Reactor Regulation
Shared Package
ML20198A170 List:
References
FOIA-86-203 TAC-57927, TAC-57928, NUDOCS 8512090548
Download: ML20198G514 (2)


Text

,

. nerg'o,,

UNITED STATES

~

8 NUCLEAR REGULATORY COMMISSION o

g

i WASHINGTON, D. C. 20555

\\*****/

November 7,1985 I

MEMORANDUM FOR: Walton Jensen Reactor Systems Branch, DSI FROM:

M. Srinivasan, Chief Power Systems Branch, DSI

SUBJECT:

NORTH /SNA POWER UPGRADE (PSB INPUT)

REFERENCE:

Memo, R. Bernero to DSI Branch Chiefs, dated 9/20/85,

" North Anna Power Upgrade" (TACs 57927 and 57928)

In response to the referenced memo, PSB has reviewed the North Anna upgrade package attached to the memo. There are no electrical system design changes or load changes indicated in PSB's area of review responsibility. Additionally, we would not expect any significant system load changes as a result of a 4% change in reactor power.

Therefore, PSB has no input to this power upgrade review at this time.

Should system loading changes result as a consequence of other technical branch reviews, PSB will evaluate the significance of any such change on the electrical system design. Please inform us of any such change.

I 1

ca va M. Srinivasan, Chief Power Systems Branch Division of Systems Integration cc:

L. Rubenstein R. Houston L. Engle E. Butcher J. Knight f

Ah)

/f i

Contact:

jb

' J. E. Knight T

x27798 i

b

s90%

8 UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION

E WASHINGTON, D. C. 20S55

/

November 7,1985 MEMORANDUM FOR: Walton Jensen Reactor Systems Branch, DSI FROM:

M. Srinivasan, Chief Power Systems Branch, DSI

SUBJECT:

NORTH ANNA POWER UPGRADE (PSB INPUT)

REFERENCE:

Memo, R. Bernero to DSI Branch Chiefs, dated 9/20/85,

" North Anna Power Up'.rade" (TACs 57927 and 57928)

In response to the referenced memo, PSB has reviewed the North Anna upgrade package attached to the memo. There are no electrical system design changes or load changes indicated in PSB's area of review responsibility. Additionally, we would not expect any significant system load changes as a result of a 4% change in reactor power.

Therefore, PSB has no input to this power upgrade review at this time.

Should system loading changes result as a consequence of other technical branch reviews, PSB will evaluate the significance of any such change on the electrical system design. Please inform us of any such change.

c I

\\

,/ cs t v a n M. Srinivasan, Chief Power Systems Branch Division of Systems Integration cc:

L. Rubenstein R. Houston L. Engle E. Butcher J. Knignt

Contact:

' J. E. Knight x27798

.