ML20198G476
| ML20198G476 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Salem |
| Issue date: | 11/29/1985 |
| From: | Knight J Office of Nuclear Reactor Regulation |
| To: | Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20198A170 | List: |
| References | |
| FOIA-86-203 TAC-59645, NUDOCS 8512050231 | |
| Download: ML20198G476 (2) | |
Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
LU
'l-v r
/
o,
- UNITED STATES
[
',g NUCLEAR REGULATORY COMMISSION T \\\\ 3O O D
j WASHINGTON, D. C. 20555
\\....*/
N0' 2 0 1985 MEMORANDUM FOR:
Steve Varga, Director PWR Project Directorate #3 FROM:
James Knight, Assistant Director for PWR-A
SUBJECT:
INCREASE IN RATED THERMAL POWER (TAC 59645)
Plant Name:
Salem Nuclear Generating Station Unit 1 Docket Ncmber:
50-272 Responsible Directorate: PWR #3 Project Manager:
D. Fischer Review Branch:
RSB, PWR #4 Review Status:
Complete In a letter dated August 6, 1985, the licensee requested that the Technical Specifications for Salem Unit 1 be changed to permit power operation at the 2% higher power level of 3411 Mwt permitted for Unit 2.
The current power limitation for Unit I results from the reduced capacity of the main turbine coupling that was originally installed on the plant. The coupling has now been modified. The licensee evaluated all significant components for Units 1 and 2 and concludes that they are the same or functionally the same. The Units share a common FSAR in which the design basis transients and accidents are evaluated at the higher power level. We agree with the licensee that both Units may be safely operated at the current Unit 2 power level. Safety evaluation and SALP input by the PWR-A, Reactor Systems Branch are attached.
w.F.k J James Knight, Assistant Director for PWR-A
Enclosure:
As stated cc:
H. Thompson
'MhY D. Fischer V
J. Wilson i
I' i Q Qs...ha.a UNITED STATES
'[
NUCLEAR REGULATORY COMMISSION T I\\ >0 D o
p WASHINGTON, D. C. 20555 s.,
/
Nov 2 g y
- se*
MEMORANDUM FOR:
Steve Varga, Director PWR Project Directorate #3 FROM:
James Knight, Assistant Director for PWR-A
SUBJECT:
INCREASE IN RATED THERMAL POWER (TAC 59645)
Plant Name:
Salem Nuclear Generating Station Unit 1 Docket Number:
50-272 Responsible Directorate: PWR #3 Project Manager:
D. Fischer Review Branch:
RSB, PWR #4 Review Status:
Complete In a letter dated August 6, 1985, the licensee requested that the Technical Specifications for Salem Unit 1 be changed to permit power operation at the 2% higher power level of 3411 Mwt permitted for Unit 2.
The current power limitation for Unit I results from the reduced capacity of the main turbine coupling that was originally installed on the plant. The coupling has now been modified. The licensee evaluated all significant components for Units 1 and 2 and concludes that they are the same or functionally the same. The Units share a common FSAR in which the design basis transients and accidents are evaluated at the higher power level. We agree with the licensee that both Units may be safely operated at the current Unit 2 power level. Safety evaluation and SALP input by the PWR-A, Reactor Systems Branch are attached.
w.p. Ar M
James Knight, Assistant Director for PWR-A
Enclosure:
As stated cc:
H. Thompson D. Fischer J. Wilson
/