ML20198G156

From kanterella
Jump to navigation Jump to search

Clarifies Commitments & Completion Date Extension Re Issue 24 of Plan for Achieving Compliance W/Nrc Regulations at Portsmouth Gaseous Diffusion Plant DOE/ORO-2027/R3
ML20198G156
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 12/30/1997
From: Paperiello C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
References
TAC-L32051, NUDOCS 9801120260
Download: ML20198G156 (5)


Text

a M MM

"%g

)"

4 UNITED STATES 3

}

NUCLEAR REGULATORY COMMISSION I

f

' WACHINGTON, D.c.1336H201 g.....(/

December 30, 1997 Mr. James H. Miller Vice Presidont, Production U. S. Enrichment Corporation 2 Democracy Center

.6903 Rockledge Drive Bethesda, MD 20817

SUBJECT:

CERTIFICATE AMENDMENT REQUEST - PORTSMOUTH GASEOUS DIFFUSION PLANT (PORTS) CLARIFICATION OF COMMITMENTS AND COMPLETION DATE EXTENSION RELATED TO ISSUE 24 OF THE " PLAN FOR ACHIEVING COMPLIANCE WITH NUCLEAR REGULATORY COMMISSION REGULATIONS AT THE PORTSMOUTH GASEOUS DIFFUSION PLANT DOE /ORO-2027/R3 (COMPLIANCE PLAN) (TAC NO. L32051)

Dear Mr. Miller:

This refers to two of your letters dated October 21,1997, entitled " Certificate Amendment Request - Calibration Program for Measuring and Test Equipmeni," and December 17,1997, entitled " Request for Enforcement Discretion Regarding the Ceitificate Amendment Request (CAR) for Compliance Plan issue 24.* In accordance with the Memorandum of Understanding between Department of Energy (DOE) and NRC, which appeared in the Federal Reaister on November 5,1997, the NRC forwarded your CAR to DOE on November 7,1997, for their review and approval of the requested dats change. By letter dated December 8,1997, DOE recommended approval of the requested date change. Anticipating NRC's approval of the CAR to occur after the completion date of December 31,1997, which you have requested to extend to June 30.1998, and to avoid a potential noncompliance of not meeting a Compliance Plan completion date, you submitteo a request for enforcement discretion on December 17,1997.

- The NRC has determined that decpite the CAR having been submitted in a timely fashion, from December 31,1997, until the NRC's final decision is issued on this matter, a literal violation of an NRC requirement would exist. However, after consideration that the remaining circumstar":es of this issuo comply with Section Vll.B.1 of the General Statement of Policy and Procedares for NRC Enforcement Actions, the NRC has determined in this case not to cite the violation. The NRC staff anticipates completing its CAR review by January 30,1996.

9801120260 971230 6

PDR ADOCK 07007002 C

PDR

{O E ECSRrst ggpy h

,,,, D V V

  • l 1.1 ll l.lil.ill. I.ll.1Hll w

James H. Miller 2-if you have an/ questbns regarding this matter, please contact Yawar Farcz at (301)415 8113.

Sincerely.

Original signed by William F. Kane for Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket 70 7002 Certificate GDP 2 cc:

Mr. Randall DeVault, DOE Mr. Jim Morgan, PORTS Mr. Steven Toelle, USEC DISTRIB.UllON:(Control No. 200S)

Docket 70 7002 eNSGJieteenhetil PUBLIC KO'Brien, Rlli CCox MHorn KWinsberg, OGC NMSS r/f FCSS r/f WSchwink SPB r/f PHiland, Rlll DHartland, Rlli NMamish, OE WTroskoski G:\\M&TEL2.POR

'See Previous concurrence OP/Pnoorso/onommnan me 1eer OFC

  • SPB

'SPB

'SPB

'SPB

'OGC

'OE

  • FCSS NAME YFaraz:lj DHoddley DM,artin RPierson STreby ETen5yck DATE 12/29/97 12/23/97 12/,2,3/97 12/29/97

/

/97 12/29/97 12/29/97 OFC NM2$ f')

l kpoliello NAME DATE 1241/97 C = COVER E m COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY k

James H. Miller 2-if you have any questions regarding this matter, please contact Yawar Farar at (30'11415 8113.

Sincerely, Carl J. Paperiello, Dire or Office of Nuclear M t$ rial Safety i

and Safeguards I

Docket 70 7002 Certificate GDP 2 cc:

Mr. Randall DeVault, DOE Mr. Jltn Morgan, POR TS Mr. Steven Toelle, USEC l

DISTillBUTION: (Control No./200S)

Docket 70 7002 NRC Filetenter PUBLIC KO'Brien, Rlli CCox MHorn KWinsberg, OGC NMSS r/f FCSS t/f WSchwink CPB r/f D 'rtland, Rlli NMamish, OE WTroskoski, FCOB PHiland, Rill a

G:\\M&TEL2.POR

'See Previous conc renca i

08 C '

SP8

'SP9

'5Pil N

'00C Or_ /

FCSS t vr.,JDW -

L.

/tW6 e1.da l

om....,

ou.e, ww

([,1II/97 l4 7k/97 12/N 19,1 DAff 1 t/I9197 17171/97 1P/23/97 19 7

/

0FC NMSS!

um cP.P.. no Dave i

19 7 C = COVER E = COvin & LNCLOSUML N = NO COPY Orr4CIAL RECORD COPY r

I r -

,#r m.

J,_,'

. ~,, _

....=.._ -

James H. Miller 2-l 4

ThkNRC has determined that since the CAR was submitted in a timely manner, USEC vrill l

noi in violation of its PORTS certificate from December 31,1997, until the NRC's final decisio is isreued on this matter. -

If you have iy questions regarding this matter, please contact Yawar Farar at (301) 415 81 Sincerely, Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket 70 7002 Certificate GDP 2 cc:

Mr. Randall DeVault, DOE Mr. Jim Morgan, PORTS Mr. Steven Toolle, USEC.

DISTRIBUTION: (Control No. 200S)

Docket 70 7002 NRC File Center PUBLIC KO'Brien, Rlli CCox MHorn I"Ninsberg, OGC NMSS r/f FCSS r/t WSchwink, FCOB SPB r/f PHiland, Rlli DHartland, Rlli G:\\M&TEL2.POR 1

  • See Previous concurrence AO k (Ab OPC

'*$P9-SP0

'6P9 4PB 00d DI FCSS uss 57iYk 1444Ar '

YFe'es'4 DHoefey DMeren eson

,tfenE m oriano i \\~/97 DAlt' 1 Pt?$ /97 i 2/73r97 17tP3 /97 12t24t37 M I19/97 1

197 C e COVER E a COYtM Gi RNCLOSUME N = 900 COPY OPFICIAL MECOMO COPY '

b

James H. Miller 2

=,

1 NRC has determined that since the CAR was subtnitted in a timely manner, USEC will.

not in violatio' of its PORTS certificate from December 31,1997, until the NRC's final decisio s issued on this matter. However, if the final decision involves a denial of the

request, er December 31,1997, the NRC may find USEC to be in violation of not meeting i

the Complia e Plan Issue 24 completion date of December 31,199't.

If you have any estions regarding this matter, please contact Yawar Farar at (301) 415 8113.

Sincerely, Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket 70 7002 Certificate GDP 2 cc:

Mr. Randall DeVault, DOE Mr. Jim Morgan, PORTS Mr. Steven Toelle, USEC DISTRIBUI10N: (Controf No. 200S)

Docket 70 7001 NRC File Center PUBLIC KO'Brien, Rlll CCox MHor KWinsberg, 000 NMSS r/f FCSS r/f WSchwink, FCOB SPB i/f PHiland, Rlil DHartland, Rill G:\\M&TEL2 POR

\\

08C SPs

[j P9 h

SPe E

h $PG 000 FCBS NMSS vr....u M N Xo.m.,

oK P -\\\\.,.oo r?.oeva CP.P.,..n.

=Ame DAff II # 2197 b/

19 7 I I. / II /97

' \\L l'd 197

/

19 7 1

/97 1

/97 C=COVEA E = COVER & ENCLOSURE N

  • NO COPY OFFICIAL htCOMO COPY

-c... -.,

.--