ML20198E709
| ML20198E709 | |
| Person / Time | |
|---|---|
| Site: | Seabrook, 05000000 |
| Issue date: | 05/08/1986 |
| From: | Baer R NRC |
| To: | Cherny F NRC |
| Shared Package | |
| ML20151L176 | List: |
| References | |
| FOIA-86-266 NUDOCS 8605280210 | |
| Download: ML20198E709 (1) | |
Text
- .;
l[f$8
(,MN If,f
?
h b[
g g
/
jo,,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
N Es WASHINGTON, D. C. 20555 (f) h f C6 a ( (w J'
0Yo
?
3 w
4 h tM O.-
C, Al 0 V-MEMORANDUlf FOR:
Frank C. Cherny, Section Chief Mechanical Engineering Branch a
Division of Engineering Office of Nuclear Reactor Regulation
]f FR0!i:
Robert L. Baer, Chief j, g A,
Engineering and Generic s - F SI 7//
Communications Branch M j A ;*~jd A-M
/.
Division of Onergency Preparedness and Engineering Response eY
- f #y3 Office of Inspection and Enforcement W-
SUBJECT:
50.5S(e)- REPORT ON CROSBY MAIN STEAM VALVE RIM SETTINGS As we discussed on the telephone last week, I am enclosing the subject 50.55(e) report from Public Service of New Hampshire.
The problem of inadequate capacity of the main steam safety valves seems similar to the previously reviewed problem of the RCS safety valves.
I would appreciate your review of this issue, along with your judgment as to whether it could be generic to other plants. Depending on your conclusions, an infor-mation notice, or possibly a bulletin, or generic letter may be appropriate.
(/
Robert L. Baer, Chief Engineering and Generic Comunications Branch Division of Emergency Preparedness and Engineering Response, IE
Enclosure:
As stated cc:
J.11. Taylor. IE F '
- V M ' ~ ' " '* 9 ' ~ "W N $ e e n 4 -tr n R. H. Vollmer IE w5m 5e 4m,
E. L. Jordan, IE S. A. Schwartz IE R. J. Bosnak, NRR
~
C. E. Rossi, IE R. L. Baer, IE D. P. Allison~, IE A. W. Dromerick, IE M. S. Wegner, IE R. J. Kiessel IE B605280210 060508 PH
-266 PDR
$fdf
.